Loading…
Loading…
Tender Value
₹85.1 L
EMD Value
₹50,000
Closing Date
12 Oct 2026, 4:00 pm
Superintending Engineer, Roads Central Circle
O/o,Superintending Engineer, Roads Central Circle Aluva
APPENDIX A REACTIVE MAINTENANCE -INITIAL RECTIFICATION WORKS-APPENDIX B PREMONSOON WORKS APPENDIX C PROACTIVE,PREVENTIVE MAINTENANCE APPENDIX D EMERGENCY WORKS
2026_PWD_875978_1
PWD/RB/TR/20803/2025_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
365 days
Idukki
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
3 Oct 2026
3 Oct 2026
15 Oct 2026
3 Oct 2026
12 Oct 2026
3 Oct 2026
3 Oct 2026 - 12 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX-A: Initial Rectification Works | |||||
| 1.001 | OD263936/2025-2026:Filling up potholes with bituminous ready mix compound (25 kg bag )and compacting by ramming to get a compact surface including cost of materials, laying charges, transportation to site etc. complete. Rate is arrived for a bag of 25 kg | 150 | no | - | - |
| 1.002 | OD220643/2025-2026:Providing Vinyl sticker including lettering and Printing to already installed DLP board of Running contract work | 1.44 | sqm | - | - |
| 2APPENDIX-B: Premonsoon Works | |||||
| 2.001 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 12.7 | Hectare | - | - |
| 2.002 | OD151234/2026-2027:Hire charges for Tipper for removing debris , Excess earth on the shoulder &amp removing other materials for | 12.5 | Day | - | - |
| 2.003 | OD151235/2026-2027:Hire charges of Front end loader for removing debris and other unwanted materials from roadway etc complete as per the direction of departmental officers at site | 11.5 | Day | - | - |
| 2.004 | OD205306/2025-2026:Engaging Man Mazdoor for removing /Clearing the rubbish and other aligned activities etc. | 100 | no | - | - |
| 3APPENDIX-C: Preventive Maintenance Works | |||||
| 3.001 | OD205303/2025-2026:Conducting and Reporting Routine Inspections for the entire length of the Project Road
frequency of 7 days throughout the agreement period of the Running Contract as directed by the
departmental officers at site
Additional RI may be required in response to reports of complaints from the police, other
authorities and the public as a result of major incidents, typhoon or flooding damages etc and
are not measurable/ payable. A proportion of the RI should be carried out either during or
immediately following a period of we weather. | 1,519.44 | km | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
viewsbd.pdf
Tender Documents • 1.66 MB
BOQ_1487564.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .