Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹29.3 CrAdmitted-Finance | ₹29.3 Cr | Admitted-Finance |
| 2 | Rejected-Technical | - | Rejected-Technical EMD not submitted |
| Sl No | Description | Qty | Unit | ARX Group SA |
|---|---|---|---|---|
| 1.00 | Financial Bid for RFP: Appointment of Design and Project Management Consultancy for construction of underground subways/ vestibules connecting Two Metro Line 3 Stations (Science Centre and BKC) to various developments in vicinity | 1 | Nos | 24,84,68,627 ₹29,31,92,979.86 Lowest |
Tender Value
Refer Docs
Closing Date
1 Apr 2026, 4:00 pmClosed
Director (Planning)
2nd floor, Hallmark Business Plaza, Bandra East, Mumbai
Appointment of Design and Project Management Consultancy for construction of underground subways vestibules connecting Two Metro Line 3 Stations Science Centre and BKC to various developments in vicinity
2025_MMRCL_256601_1
MMRC/PLN/TOD/SCBKC/Vest/RFP/01
Open Tender
Consultancy
Lump-sum
1300 days
Mumbai
Please refer Tender documents.
25 documents required · 25 mandatory
₹11,800
Mumbai Metro Rail Corporation Limited
Exempted
8 fl, Hallmark Business Plaza, Bandra East, Mumbai
21 May 2026
24 Nov 2025
2 Apr 2026
24 Nov 2025
1 Apr 2026
24 Nov 2025
24 Nov 2025 - 10 Feb 2026
9 Feb 2026
Select, Excess (+), Less (-)
Tender Inviting Authority: Mumbai Metro Rail Corporation Limited
Name of Work: Appointment of Design and Project Management Consultancy for construction of underground subways/ vestibules connecting Two Metro Line 3 Stations (Science Centre and BKC) to various developments in vicinity
Contract No: MMRC/Planning/TOD/SC-BKC/Vestibule/RFP/01
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P GST (If applicable in Percentage) GST Amount in Rs. P HSN / SAC Code TOTAL AMOUNT excluding taxes in Rs. P TOTAL AMOUNT including taxes Rs. P TOTAL AMOUNT In Words
1 Financial Bid for RFP: Appointment of Design and Project Management Consultancy for construction of underground subways/ vestibules connecting Two Metro Line 3 Stations (Science Centre and BKC) to various developments in vicinity item1 1 Nos 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select %
Quoted Rate in Words
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
MMRCRFPBKCScienceCentre.pdf
Tender Documents • 7.01 MB
BOQ_295895.xls
BOQ • 0.38 MB
Corrigendum7dtext.pdf
PDF • 0.28 MB
20260306Corrigendum6.pdf
PDF • 0.61 MB
20260306Corrigendum6.pdf
PDF • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].