Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee | Not Admitted-Fee Fee not received |
Tender Value
₹93.4 L
EMD Value
₹1.9 L
Closing Date
14 Dec 2019, 6:00 pmClosed
AGM (Engg-Civil)-II, AAI, Vadodara Airport, Vadoda
Old Airport Terminal Building, Administrative Office, Vadodara Airport, Vadodara-390022
Composite Rate Contract for Minor Capital Works Civil including internal electrification in Non-Operational and Residential area at C.A. Vadodara (Balance work).
2019_AAI_37125_1
AAI/VAD/ENGG-CIVIL/BALANCE WORK/2019-20
Open Tender
Civil Works
Percentage
540 days
VADODARA
See Tender Documents
19 documents required · 19 mandatory
₹1,120
AIRPORTS AUTHORITY OF INDIA
₹1.9 L
17 Mar 2020
2 Dec 2019
19 Dec 2019
3 Dec 2019
14 Dec 2019
3 Dec 2019
3 Dec 2019 - 13 Dec 2019
Government eProcurement System Created By: Pradip Kumar Gupta Created Date/Time: 06-Jan-2020 04:05 PM Tender Title: Composite Rate Contract for Minor Capital Works Civil including internal electrification in Non-Operational and Residential area at C.A. Vadodara (Balance work). Tender ID: 2019_AAI_37125_1
Tender Inviting Authority: Asst. General Manager (Engg-Civil)-II, Airports Authority of India, Vadodara Airport, Vadodara - 390022
Name of Work: Composite Rate Contract for Minor Capital Works Civil including internal electrification in Non-Operational and Residential area at C A Vadodara (Balance Work).
Contract No: AAI/VAD/ENGG-CIVIL/BALANCE WORK/2019-20 (Tender ID : 2019_AAI_37125_1)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SAUMYA CONSTRUCTION 100.00 -12.55 87.45 Eighty Seven
2.00 B.D.Sorathia Co. 100.00 4.00 104.00 One Hundred and Four
Lowest Amount Quoted BY: SAUMYA CONSTRUCTION(87.45)
BOQ Summary Details Tender Title: Composite Rate Contract for Minor Capital Works Civil including internal electrification in Non-Operational and Residential area at C.A. Vadodara (Balance work). Tender ID: 2019_AAI_37125_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SAUMYA CONSTRUCTION 87.45 L1
2 B.D.Sorathia Co. 104.00 L2
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .