Tender Value
₹9.9 L
EMD Value
₹24,800
Closing Date
11 Sept 2026, 6:00 pm
Assistant Executive Engineer
Transmission Sub Division Neyyattinkara, 110kV Substation compound, Thozhukkal, Neyyattinkara
Capital work of 110kV Substation Parassala - Providing Auxiliary mat for isolator operating locations and additional earthing for yard equipment at 110 kV Substation Parassala
2026_KSEB_865891_1
01/AEE/TSD-NTA/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
110kV Substaton Parassala
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,360
₹24,800
19 Aug 2026
19 Aug 2026
16 Sept 2026
19 Aug 2026
11 Sept 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lifting cement concrete slabs from cable trench for laying cable as directed by Departmental Officers at site | 2.75 | cubm | 1,467.58 | ₹4,035.85 |
| 2 | Placing in position cement concrete slabs over cable trench after completing the cable laying work as directed by Departmental Officers at site | 2.75 | cubm | 1,467.58 | ₹4,035.85 |
| 3 | 15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | 2.25 | cubm | 1,588.98 | ₹3,575.21 |
| 4 | 15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar (cost index(c) : 1.4766 included in Rate) | 10.25 | cubm | 2,177.17 | ₹22,315.99 |
| 5 | 5.9.1 : Centering and shutteringincludingstrutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.9 | sqm | 394.74 | ₹1,934.23 |
| 6 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 25 | kg | 114.92 | ₹2,873 |
| 7 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 0.55 | cubm | 10,721.86 | ₹5,897.02 |
| 8 | Brick work in cement mortar 1:4 with country burnt bricks for superstructure as per the direction of departmental staff | 0.06 | cubm | 9,262.08 | ₹555.72 |
| 9 | 13.7.1 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 6.9 | sqm | 479.64 | ₹3,309.52 |
| 10 | Cutting, laying and jointing pushed type PVC pipe 50mm and specials such as Tees, bends, elbows etc complete including trenching to a minimum depth of 0.5m etc. and refilling complete as per the direction of dept. Staff at site(required pipes and accessories will be supplied departmentally at free of cost) | 68.5 | mtr | 202.02 | ₹13,838.37 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
TenderDocuments.pdf
Tender Documents • 1.21 MB
bidagmnt.pdf
Other Document • 0.08 MB
BOQ_1465425.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].