Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 CrAccepted-AOC 16 19 20A TAMARAI TECH PARK INNER RING ROAD GUINDY THIRU VI KA INDUSTRIAL ESTATE GUINDY CHENNAI TAMIL NADU 600032 | CHENNAI | TAMIL NADU | 600032 | ₹5.3 Cr Quoted ₹6.2 Cr | 1 | Accepted-AOC L1 Bidder |
Tender Value
Refer Docs
Closing Date
20 Sept 2021, 2:30 pmClosed
LS NAGI
Technip India Limited,Technip Tower,A-4,Sector-1 Noida-201301,India
Design, Engineering, manufacturing, procurement of materials and bought out components, assembly at shop, Inspection including inspection by TPIA, Testing at manufacturers works, packing, supply and modification of ESD IN BXP CONTROL ROOM
2021_REFHQ_140104_1
TP/81757C001/RFCC/1512-01/1068
Single
Instrumentation-Goods
Supply
150 days
REFER TENDER DOCUMENTS
REFER TENDER DOCUMENTS
6 documents required · 6 mandatory
Exempted
27 Feb 2024
27 Aug 2021
21 Sept 2021
27 Aug 2021
20 Sept 2021
10 Sept 2021
30 Aug 2021 - 9 Sept 2021
Amount
ESD MODIFICATION IN BXP CONTROL ROOM
ESD MODIFICATION IN BXP CONTROL ROOM details as per material requisition. Except Mandatory Spares. Mandatory Spares to submit in 1.02
Mandatory Spares for “ESD in BXP Control room-RFCC Revamp ” As per Clause no-23 of Doc, No. 081757C001-701-JSS-1512-001 .details as per material requisition.
SITE WORKS For Item no. 1.01 : Integration ,Commissioning & Testing , SAT (Site Acceptance Test, Pre-commissioning/Commissioning and start-up as mentioned in material requisition ).
Training charges at site , scope as defined in MR.
Training charges at vendor's works , scope as defined in MR
Unit rate for Supervision of erection and commissioning of items as specified at item 1.01 above, as per enclosed instructions to vendor Per Diem charges upto 8 hrs on normal working days. ( Optional Price in case service is required in addition to Site work as mentioned in S.No 1.03)
Unit rate for Supervision of erection and commissioning of items as specified at item 1.01 above, as per enclosed instructions to vendor Overtime rate per hour (beyond normal 8 hours on normal working days). ( PER HOURS RATE TO FURNISH)
Unit rate for Supervision of erection and commissioning of items as specified at item 1.01 above, as per enclosed instructions to vendor Overtime rate per hour for work on weekly off days / holidays (as applicable to Refinery Site). ( PER HOURS RATE TO FURNISH)
Description of Work / Item(s)
Amount
ESD MODIFICATION IN BXP CONTROL ROOM
PWAMC charges after completion of warranty period for 1st year of annual Maintenance for this package
PWAMC charges after completion of warranty period for 2nd year of annual Maintenance for this package
PWAMC charges after completion of warranty period for 3rd year of annual Maintenance for this package
PWAMC charges after completion of warranty period for 4th year of annual Maintenance for this package
PWAMC charges after completion of warranty period for 5th year of annual Maintenance for this package
2 years Normal operational & maintenance spares (as per vendor recommendation) - Spare no. - 5.01 ( Details to be furnish in UnPrice Schedule)
Spare no. -5.02
Spare no. - 5.03
Spare no. -5.04
Spare no. - 5.05
Spare no. -5.06
Spare no. - 5.07
Spare no. -5.08
Spare no. - 5.09
Spare no. -5.10
Spare no. - 5.11
Spare no. -5.12
Spare no. - 5.13
Spare no. -5.14
Spare no. - 5.15
Spare no. -5.16
Spare no. - 5.17
Spare no. -5.18
Spare no. - 5.19
Spare no. -5.20
Spare no. - 5.21
Spare no. -5.22
Spare no. - 5.23
Spare no. -5.24
Spare no. - 5.25
Spare no. -5.26
Spare no. - 5.27
Spare no. -5.28
Spare no. - 5.29
Spare no. -5.30
Spare no. - 5.31
Spare no. -5.32
Spare no. - 5.33
Spare no. -5.34
Spare no. - 5.35
Spare no. - 5.36
Spare no. -5.37
Spare no. - 5.38
Spare no. -5.39
Spare no. - 5.40
Unit Rate for Addition /Deletion for Controller
Unit Rate for Addition /Deletion for Analog Input card / Module
Unit Rate for Addition /Deletion for Analog Output card / Module
Unit Rate for Addition /Deletion for Digital Input card / Module
Unit Rate for Addition /Deletion for Digital Output card / Module
Unit Rate for Addition /Deletion for Media Adapter, I/O Bus Comm, RJ45/RS-485
Unit Rate for Addition /Deletion for Communication Module
Unit Rate for Addition /Deletion for Field termination assemblies
Unit Rate for Addition /Deletion for System Rack Power Supply Unit
Unit Rate for Addition /Deletion for Diode 'O' Ring Unit
Unit Rate for Addition /Deletion for BARRIERS-General purpose
Unit Rate for Addition /Deletion for BARRIERS- SIL1
Unit Rate for Addition /Deletion for BARRIERS- SIL2
Unit Rate for Addition /Deletion for BARRIERS -SIL3
Unit Rate for Addition /Deletion for RELAYS-General Purpose
Unit Rate for Addition /Deletion for RELAYS-SIL 1
Unit Rate for Addition /Deletion for RELAYS-SIL 2
Unit Rate for Addition /Deletion for RELAYS-SIL 2 with Line monitoring
Unit Rate for Addition /Deletion for RELAYS-SIL3
Unit Rate for Addition /Deletion for Interposing Relay for Digital Outputs
Unit Rate for Addition /Deletion for Interposing Relay for Digital Inputs
Unit Rate for Addition /Deletion for Terminal Assembly
Unit Rate for Addition /Deletion for Std Terminals without fuse, 2.5 Sq. mm
Unit Rate for Addition /Deletion for Std Terminals with fuse, 2.5 Sq. mm
Unit Rate for Addition /Deletion for MCB
Unit Rate for Addition /Deletion for Emergency PushButtons with cover
Unit Rate for Addition /Deletion for Std PushButtons
Unit Rate for Addition /Deletion for Mushroom PushButtons
Unit Rate for Addition /Deletion for Indicating Lamps
Unit Rate for Addition /Deletion for Aux Console
Unit Rate for Addition /Deletion for Firewall
Unit Rate for Addition /Deletion for CAT 5/6/7 cable
Unit Rate for Addition /Deletion for Console with Modbus TCP/IP to RS485 converter
Unit Rate for Addition /Deletion for Pre-fabricated cable with end terminations
Unit Rate for Addition /Deletion for POWER CABLE
Unit Rate for Addition /Deletion for UNARMOURED ETHERNET CABLE with connectors
Unit Rate for Addition /Deletion for ARMOURED ETHERNET CABLE with connectors
Unit Rate for Addition /Deletion for UNARMOURED SERIAL CABLE with connectors
Unit Rate for Addition /Deletion for ARMOURED SERIAL CABLE with connectors
Unit Rate for Addition /Deletion for Fibre optic cable with FO accessories
Unit Rate for Addition /Deletion for Patch cables
Unit Rate for Addition /Deletion for OFC Interface Master Module
Unit Rate for Addition /Deletion for FO to serial CONVERTOR
Unit Rate for Addition /Deletion for SERIAL Interface CARD
Unit Rate for Addition /Deletion for Modbus RS485 communication Module
Unit Rate for Addition /Deletion for MODBUS TCP/IP Communication module
Unit Rate for Addition /Deletion for N/w Switch-24 Port
Unit Rate for Addition /Deletion for N/w Switch-16 Port
Unit Rate for Addition /Deletion for N/w Switch-8 Port
Unit Rate for Addition /Deletion for EMPTY System Cabinet (1200 L x 2100 H x 800 D)
Unit Rate for Addition /Deletion for EMPTY Marshalling Cabinet (1200 L x 2100 H x 800 D)
Unit Rate for Addition /Deletion for EMPTY PDB Cabinet (1200 L x 2100 H x 800 D)
Unit Rate for Addition /Deletion for EMPTY System Cabinet (1200 L x 2100 H x 400 D)
Unit Rate for Addition /Deletion for EMPTY Marshalling Cabinet (1200 L x 2100 H x 400 D)
Unit Rate for Addition /Deletion for EMPTY System Cabinet (800 L x 2100 H x 400 D)
Unit Rate for Addition /Deletion for EMPTY Marshalling Cabinet (800 L x 2100 H x 400 D)
Unit Rate for Addition /Deletion for EMPTY System Cabinet (800 L x 2100 H x 800 D)
Unit Rate for Addition /Deletion for EMPTY Marshalling Cabinet (800 L x 2100 H x 800 D)
Unit Rate for Addition /Deletion for Bulk Power Supplies – 12 V DC, 20 A
Unit Rate for Addition /Deletion for Bulk Power Supplies – 24 V DC, 20 A
Unit Rate for Addition /Deletion for Bulk Power Supplies – 12 V DC, 40 A
Unit Rate for Addition /Deletion for Bulk Power Supplies – 24 V DC, 40 A
Unit Rate for Addition /Deletion for Panel mounted Fan with fan failure contact
Unit Rate for Addition /Deletion for Earth Leakage Detector
Unit Rate for Addition /Deletion for Engineering Station
Unit Rate for Addition /Deletion for SOE Station
Unit Rate for Addition /Deletion for Operator Station - Dual Screen (complete with software, license etc.)
Unit Rate for Addition /Deletion for AMS Work Station (complete with software, license etc.)
Unit Rate for Addition /Deletion for Printer (Size: A4, Colour )
Unit Rate for Addition /Deletion for Printer (Size: A3, Colour )
Unit Rate for Addition /Deletion for HART MUX
Unit Rate for Addition /Deletion for HMI Graphics pages
Unit Rate for Addition /Deletion for Console with keyboard & mouse
Unit Rate for Addition /Deletion for Console with 21” LCD Monitor
Unit Rate for Addition /Deletion for Earthing Cable
Unit Rate for Addition /Deletion for PVC conduit
Unit Rate for Addition /Deletion for Tag License- 100 tags
Unit Rate for Addition /Deletion for Antivirus
Unit Rate for Addition /Deletion for Remote I/O Racks with OFC connectivity
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
Unit Rate for Addition /Deletion for ANY OTHER ITEM WHICH IS NOT COVERED ABOVE. (Details to be furnish in unprice Schedule)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .