Tender Value
₹8.2 L
EMD Value
₹10,300
Closing Date
5 Oct 2026, 5:00 pm
AE (E and M), Mugma Area
Office of The General Manager, Mugma Area, P.O-Mugma, Dist.- Dhanbad, 828204
Construction of Peripherical Fencing around new coal depot using departmental recovered profile sheets at Chapapur-II Open Cast Project under CB Group, Mugma Area.
2026_ECL_365933_1
ECL/GM/MA/CE/26-27/e-Tender/78 Dt. 21.09.2026
Open Tender
Civil Works - Others
Percentage
45 days
chapapur Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,300
24 Sept 2026
24 Sept 2026
6 Oct 2026
24 Sept 2026
5 Oct 2026
25 Sept 2026
25 Sept 2026 - 1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Based on analysis | - | - | - | - |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 40.55 | cum | 188.75 | ₹7,653.81 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.02 | cum | 6,007.2 | ₹72,206.54 |
| 3 | Fitting and fixing procoated galvanised inron profile sheets/G.I Sheet (Excluding cost sheet) | 1,440 | sqm | 104.2 | ₹1,50,048 |
| 4 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisitng, fixing in positoin and applying a priming coat of approved steel primer only fitting and fixing. (Excluding cost of steel) | 20,848.8 | Kg. | 18.57 | ₹3,87,162.22 |
| 5 | Carriage of materials By Mechanical Transport including loading,unloading and stacking: Steel Lead - 5 km | 26.85 | tonne | 157.45 | ₹4,227.53 |
| 6 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 20,848.8 | Kg. | 3.6 | ₹75,055.68 |
| 7 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BOQ_378855.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .