Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance UMERKOTE | UMERKOTE | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.6 L
EMD Value
₹7,700
Closing Date
12 Nov 2026, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer NID Nabarangpur
Office of SE NID Nabarangpur
Construction of trough wall.
2026_PGDDK_144868_1
SE-NID-02/2026-27(05)
Open Tender
Civil Works - Others
Percentage
30 days
umerkote
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹7,700
Yes
18 Nov 2026
3 Nov 2026
13 Nov 2026
3 Nov 2026
12 Nov 2026
3 Nov 2026
3 Nov 2026 - 5 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area, with all labour, T&P, taxes &cess etc complete as per direction of Engineer-in-charge | 10,010 | Sqm | 2.9 | ₹29,029 |
| 2 | Earthwork Excavation in hard soil within 50 m initial lead and 1.5mt. Initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3mt in depth with cost of all labour, T & P , labour cess required for the work etc.complete as per direction of Engineer-in-charge | 1,564 | Cum | 235.7 | ₹3,68,634.8 |
| 3 | Filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of labour with T&P with labour cess required for the work etc. complete as direction of the Engineer-in-charge. | 10.2 | Cum | 765 | ₹7,803 |
| 4 | Cement Concrete M15 grade with 40mm and downgraded size crusher broken hard granite chips of approved quality from approved quarry free from dust, dirt and other foreign material including watering for curing including cost of all materials, conveyance, royalities, labour charges, labour cess, taxes, leads, lifts, delifts and all T&P materials etc as per specification and as directed by the Engineer in charge. | 10.2 | Cum | 5,485.9 | ₹55,956.18 |
| 5 | Reinforced Cement Concrete of M20 grade with 20mm and down grade crusher broken hard granite chips of approved quality from approved quarry free from dust, dirt and other foreign material including watering for curing including cost of all materials, conveyance, royalities, labour charges, labour cess, taxes, leads, lifts, delifts and all T&P materials etc as per specification and as directed by the Engineer in charge | 27.25 | Cum | 6,233.5 | ₹1,69,881.58 |
| 6 | Providing HYSD bar reinforcement for R.C.C. work including Straightening, cutting, bending, binding, welding, tying the grills, laying and placing in proper position as per approved design and drawing including cost, conveyance of HYSD bar & 18 to 20 gauge binding wire with cost of all labour T & P ,labour cess,taxes etc. as direction of the Engineer-in-charge. | 7.73 | Qntl. | 8,971.1 | ₹69,355.57 |
| 7 | Rigid smooth centering and shuttering for C C work including false works and dismentalling then after casting including cost and convenance of materials, cost of labour , T&P, labour cess etc complete as per the direction of Engineer-in-Charge. | 229.86 | Sqm | 249.8 | ₹57,419.03 |
| 8 | Filling in foundation and plinth with excavated materials including watering and ramming with cost of all labour, T & P , labour cess required for the work etc.complete as per direction of Engineer-in-charge. | 49.73 | Cum | 117 | ₹5,817.83 |
stage.html
html • 0.04 MB
finance_617422.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.47 MB
BADABASINISMONEPDF.pdf
Tender Documents • 5.09 MB
BOQ_617422.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .