Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹52.2 LAccepted-AOC | ₹52.2 L | L-1 | Accepted-AOC L-1 Firm |
| 2 | L-2₹54.0 L+₹1.7 L (3.28%)Rejected-Finance 5TH FLOOR KAILASH BUILDING 26 K G MARG CANAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | ₹54.0 L+₹1.7 L (3.28%) | L-2 | Rejected-Finance Rates Quoted are Higher than L-1 firm |
| 3 | L-3₹2.2 Cr+₹1.7 Cr (326.5%)Rejected-Finance | ₹2.2 Cr+₹1.7 Cr (326.5%) | L-3 | Rejected-Finance Rates Quoted are Higher than L-1 firm |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
17 Aug 2023, 11:00 amClosed
Dy.CE/HPs
Shed No. A-3,SHAKTI VIHAR,PSPCL,Patiala
RLA and RMU Study of UBDC Stage I Power Houses and preparation of DPR, Technical Specs and commercial Specs of proposed replacements.
2023_POWER_102127_1
300/HPs/ED-III/M-138
Open Tender
Consultancy
Tender cum Auction
252 days
UBDC Hydel Project, Malikpur
Please refer Tender Document
8 documents required · 8 mandatory
₹2,360
₹2.6 L
Yes
25 Jan 2024
22 May 2023
24 Aug 2023
22 May 2023
17 Aug 2023
22 May 2023
Amount
RLA and RMU Study of UBDC Stage I Power Houses including all the testing, measurements etc required and preparation of DPR, Technical Specs and commercial specs as per Technical specification and scope of work described above
Bidder Name
Amount in Words
Sharp Hydroengineering pvt.ltd
WAPCOS LTD
MECON Limited
Sharp Hydroengineering pvt.ltd
MECON Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
PDF • 0.16 MB
tech_eval.pdf
PDF • 0.64 MB
boq_comp_chart.xlsx
xlsx • 0.01 MB
fin_eval.pdf
PDF • 0.31 MB
aoc.pdf
PDF • 1.36 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .