EXECUTIVE ENGINEER (O & M) DGVCL MANDVI DIVISION
Tender for the Work of Supply and Fixing of Pipe-in-Cage (PIC) Earthing for the First Thirty Poles from the Substation of Existing and New Feeders at Umarpada Sub-Division under Mandvi Division for S.I. and work under other Various Schemes.
356080
Tender NO: 25 DGVCLDOMDV/0103/10/2026 DT:15.10.2026
Open
Electrical and Maintenance Works
Works
Surat
1 document required · 1 mandatory
₹1,180
DGVCL MANDVI
₹20,000
16 Oct 2026
16 Oct 2026
16 Oct 2026
26 Oct 2026
16 Oct 2026
(a) Earnest Money deposit (1% of the estimated cost) as indicated on the
face sheet should be paid by the tenderer along with the tender ONLINE
(b) Tender without earnest money will not be considered for acceptance.
(c) Earnest Money Deposit will be forfeited in case the successful tenderer
after his tender has been accepted fails to pay the prescribed security
deposit and execute the contract agreement on a non-judicial stamp of
Rs.100/- at his own cost and sign the contract booklet.
(9) Validity of Tenders:
All tenders shall be opened for acceptance by the Company for a period of
days from the date of opening the tenders.
(10) Acceptance of Tenders:
(a) The Company does not bind to accept the lowest or any tender with any
reason for the rejection. It is also not binding on the company to disclose
any analysis reports on the tender.
(b) Accepting authority reserves the right of rejection of any or all tenders
without assigning any reason thereof.
(c) Any tender who does not comply the above requirements is liable to be
(11) Security Deposit:
The lowest tender whose tender is accepted shall have to pay 5% security
deposit of the tender cost.
(12) Solvency Certificate / Bank Guarantee :
The lowest tender whose tender is accepted shall have to produce within
days the solvency certificate from the collector of district within which he resides
or bankers certificate of his financial stability for the amount as deemed fit by
the undersigned. In case of partnership firm each individual partner will have to
produce solvency certificate as above. The solvency certificate will have to be
renewed every year or whenever asked for in the interim period.
(13) Contract Documents:
The lowest tendered whose tender is accepted will have to execute a stamped
agreement in standard form with the company and will have to sign the contract
booklet viz Tender and contract for works at his own cost. In case of
partnership firms, necessary partnership documents, in original along with its
copy will have to be produced for verification along with authority to sign the
bills measurement and enter in to contract as well as correspondence with the
company. Wherever required necessary power of attorney will have to be
produced especially when the partnership deed is silent on the point of authority
to deal with the Company. The contractor will have to execute the documents
and sign the booklet “Tender and contract for work” before starting the work.
If a contractor happens to be a sole trader he will have to produce an affidavit
made before Magistrate to that effect
(14) Jurisdiction:
Any dispute or differences arising under out of in connection with the contract
shall be subject to the exclusive jurisdiction of SURAT.
(15) Addressing Tenders:
Tenders must be submitted in envelops which must be properly sealed by the
tenderers with their office seal and must be super scribed with the following.
(a) Tender No and the name of the proposed work.
(b) Returnable date and time of tender. It is the responsibility of the tenderer
to see that the tenders are received in company office or tender box
within the stipulated time and date. The envelope must bear full address
of the tenderer.
(16) The company’s general conditions of contract will apply to all the contractors
and he is deemed to be fully aware of the company’s general conditions of
contract for the works in respect of security deposits, penalty for late completion
of work etc and any ignorance of these conditions will not exempt the contractor
from the liability to abide by the same.
Submission of a tender by a tenderer implies that he has read that the
instructions and conditions of contract contained in booklet and has made
himself aware of the scope and specification of the work to be done and of the
conditions and rate at which stores etc. will be issued to him and local
conditions and other factors bearing on the execution of work.
If the contractor stands lowest for more than one tender it will be at the
discretion of the competent authority whether to award more than one work on
not without assigning any reason thereof.
Before starting any work on line or pole etc by the laborers of the contractor it
will be the responsibility of the contractor obtain line clear from the concerned
officer. The Company is not liable for any injury on damage to contractor’s
workman or his equipment respectively during execution of this contract and the
Company will not pay any compensation for any reasons whatsoever.
(18) The contractor shall not demand or accept any help from the intending
consumers in line erection works or in transport of materials.
(20) Whenever there is an excess work carried out by a contractor beyond the
technically sanctioned amount against the work order given the approval for the
excess quantity of work done should be obtained from the competent authority
as per Company rules.
(21) The erection work should be started from the date of commencement given in
the order and should be completed within the prescribed period for each work.
The contractor is bound to complete the work within the specified period of
each work, given by Executive Engineer.
(22) Extension of Time Limit:
(a) If for any reasons, the contractor is not in a position to complete the work
within the stipulated period, he should put his application to the Engineer in
charge before one month of the expiry of the stipulated time limit giving
valid reasons for the required extension.
(b) In case of any non-supply of materials from stores, the contractor will have
to intimate the Sub-Division Office or Division office quoting the MR No and
date for non-receipt ofmaterials. The intimation will be considered for
extension in time limit. The time limit will be considered on the basis of
number of “Working Days” or “Months”.
It will be the responsibility of the contractor to intimate the closing down
and recommencement of work at all stages to the engineer in charge or
vice versa in writing with de reason for the closing down of the work with
specific of days for which work will remain closed.
In case of failure on the part of the contractor his claim for extension of
time limit will not be entertained. In case of no intimation in these regards
the reason for delay on this ground will not be accepted.
(23) Priority of work would be decided by the competent authority and contractor
shall carry the work within the stipulated period of the order by the competent
(24) The contractor must have adequate resources and gang of unskilled personnel
to undertake the work at different places simultaneously.
(25) The contractor will be given the separate order for each work on the basis of
the rate contract order. The date of commencement and date of completion of
work will be stipulated in the order which the contractor has to agree otherwise
the penalty will be liable for the late completion of work as per Company
standard conditions. The R.A. bills and final bill will be admitted against this
order and will be finalized accordingly.
(26) If during 12 calendar months from the date of handing over charge after
completion of work the erected lines are found defective in any way, the same
should be rectified by the contractor at his own risk and cost.
(27) The contract will remain in force for the period of one year from the date of
issue of commencement order.
(28) TERMS OF PAYMENT:
(a) The payment will be made to the contractor by A/C. payee Cheque on
local bank subject to an advance stamped receipt being received from
(b) The total payment through all the RA bills combined together will not
exceed 75/80% of the actual work executed against the sub work order
placed against the annual rate contract. The payment to the contractor
through R.A. bill will be made only after 50% of works done and
provided the contractor furnishes the material accounts in respect of
pervious R.A. bill otherwise the payment through R.A. bills shall not be
made. No R.A. bill will be paid without recording the measurements and
the preparation of material account.
(29) Recording of measurements in the presence of contractor.
(a) If case of work carried out satisfactorily by the contractor.
In the work has been carried out satisfactorily the contractor with prior
intimation from the company’s officers shall have to witness the recording of
measurements on the appointed date within one month of the completion of
work. It the contractor fails to remain present on the appointed date a notice
under Registered cover with A.D. will be served on him to witness the
recording of measurement by prior appointment with the Company’s officer
within ten days of the receipt of notice or within such extended period
applied for by the contractor and granted by the company’s officer if the
contractor still fails to come for recording of measurements within the
original or extended period of time granted by the company’s officer, then
the recording of measurement will be carried out thereafter unilaterally by
the company’s officer and the Final Bill finalized as per measurements,
recorded by the company’s officer and the same shall be binding on the
contractor no request than will be entertained.
(b) In case of work not carried out satisfactorily.
In case of work not carried out satisfactorily, either during the progress of
work or on its completion the conditions as specified vide conditions No.5
read with condition No.4 (b) of tender and contract for works booklet
shall apply and the recording of measurements shall be done within one
month of completion of work after rectification of defects by contractor or
by the Company at the contractor’s cost as the case may be and any
further delay in the recording or measurements and finalization of the
final bill due to the fault of the contractor shall be subject to the
conditions as laid down in clause 9 (a) above of the contract booklet.
(30) SUBMISSION OF ACCOUNTS BY CONTRACTOR:-
The contractor shall submit materials account with each R.A.Bill also he shall on
completion of the work have to prepare and render the final detailed materials
account of the materials received by him from the Company’s store within one
month from the date of completion of work if however the contractor does not
render the materials accounts a notice shall be issued to be contractor under
Registered A.D. to render the materials account within ten days from ten date of
issue of the notice in default, the materials account and procedure which shall
have to be accepted by the contractor and disputes if any raised shall not be
entertained the balance materials also will have to returned by the contractor
within one month from the date of completion of work otherwise Company is
not liable to accepted at a of date.
(31) The contactor will not be allowed to transfer materials from one work to another
without written permission of the field officer justifying the reasons for such
(32) Any rules framed or instructions issued regarding contractor by the Company or
its representative after awarding this contract shall also form part of this
contract and will be binding to the contractor.
(33) On completion of work contractor will inform the Dy. Engineer and Dy. Engineer
will see that if any rectifications are to be carried on that work will intimate the
contractor 15 days in writing from the date of receipt of the letter from the
contractor giving him time limit of 7 days to carry out the rectifications pointed
out. If the contractor fails to do the rectification, addition, or alterations etc.
within the above time limit of 7 days then the same will be got done through
other agency or Dept. Labour at the risk and cost or the contractor without
giving any further notice or any intimation. No complaint will be entertained
from the contractor in this regards and amount will be recoverable with 15 %
supervision charges.
(34) 25 % more charges are to be paid for the work carried out in Cyclone.
(35) Earthling certificate must be taken from the Line Staff and it is to be submitted
along with the final bill.
(36) The Bidder must having a GST Registration Number, unregistered
contractors are not allowed for the Bid.
(37) Taxes and Duties:
Bought out items/services from vendors/sub-suppliers/service providers:
All levies, GST etc. payable on equipment/material components/Services, sub-
assemblies, raw materials and any other items used for the bidder's
consumption or dispatched directly to the owner from its sub-supplier shall be
included in the Bid price and any such taxes, duties levies additionally payable
shall be to bidders account and no separate claim on this behalf shall be
entertained by the owner.
(38) RATE & TAXES :
The rates quoted are inclusive of all rates & taxes as per prevailing law and
rules & regulation. Income Tax as per Government Rules will be deducted from
your bill. GST on services will be leviable / Payable as per prevailing rate of
Govt. and GST on service portion has to be demanded at the time of putting of
the bill with tax. Afterwards there is no responsibility of DGVCL for payment of
the same. For GST on material portion is including of all taxes.
Signature of the contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
7.1 Notice Umarpada PIC.pdf
2 Bid Document pic.pdf
3 TENDER GENERAL TERMS AND CONDITIONS.pdf
4 umarpada TECHNICAL SPECS FOR PIC and TC MAINTENANCE.pdf
(5) umarpada TECHNICAL SPECIFICATIONS FOR Erection.pdf
(7) DRAWING SMC FUSE BOX.pdf
9 PIC EARTHING Tech Specification.pdf
NecessaryDocuments.pdf
SCH B UMARPADA PIC SIGN.pdf
PIC ERTHING Drawing GPRD 16 AND 17 (1).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .