| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAccepted-AOC | ₹24.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.3 LRejected-AOC | ₹25.3 L | L2 | Rejected-AOC L2 |
| 3 | L3₹25.6 LRejected-AOC | ₹25.6 L | L3 | Rejected-AOC L3 |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | ARVIND SINGH L3 | Naveen Prakash L2 | GURUDEV SINGH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). 5.3 | 7.35 | Cu-m | 7,600 ₹55,860 | 7,500 ₹55,125 | 7,455 ₹54,794.25 |
| 2.00 | Centring and shuttering including strutting,ropping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers 5.9.5 | 42 | Sq-m | 700 ₹29,400 | 700 ₹29,400 | 607 ₹25,494 |
| 3.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more 5.22.6 | 1,183.7 | Kg | 90 ₹1.1 L | 90 ₹1.1 L | 88 ₹1.0 L |
| 4.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) 6.4.2 | 27.48 | Cu-m | 7,800 ₹2.1 L | 7,600 ₹2.1 L | 7,508 ₹2.1 L |
| 5.00 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) 13.1.2 | 269.04 | Sq-m | 320 ₹86,092.80 | 300 ₹80,712 | 274 ₹73,716.96 |
| 6.00 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube 10.26 | 2,222.44 | Kg | 180 ₹4.0 L | 180 ₹4.0 L | 162.2 ₹3.6 L |
| 7.00 | Finishing walls with Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) 13.46.1 | 401.52 | Sq-m | 160 ₹64,243.20 | 150 ₹60,228 | 132 ₹53,000.64 |
| 8.00 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture 13.48.3 | 200.22 | Sq-m | 145 ₹29,031.90 | 150 ₹30,033 | 140 ₹28,030.80 |
| 9.00 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured | 297 | Sq-m | 580 ₹1.7 L | 600 ₹1.8 L | 568 ₹1.7 L |
| 10.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction MISCELLANEOUS 1-2 | 101.25 | Cu-m | 490 ₹49,612.50 | 500 ₹50,625 | 438 ₹44,347.50 |
Tender Value
₹28.6 L
EMD Value
₹75,000
Closing Date
6 Dec 2025, 12:00 pmClosed
EE RWD Uttarkashi
EE RWD Uttarkashi
Boundary wall, ramp, roof grouting work, leveling of the front ground and construction of soak pit in Government Ayurvedic Hospital, Chaptadi distirct uttarkashi
2025_RES_89003_1
tender 01/998 date 15-11-2025
Open Tender
Civil Works - Buildings
182 days
Naogaon
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
EE RWD Uttarkashi
₹75,000
24 Apr 2026
20 Nov 2025
6 Dec 2025
20 Nov 2025
6 Dec 2025
20 Nov 2025
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). 5.3
Centring and shuttering including strutting,ropping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers 5.9.5
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more 5.22.6
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) 6.4.2
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) 13.1.2
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube 10.26
Finishing walls with Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) 13.46.1
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture 13.48.3
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction MISCELLANEOUS 1-2
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction MISCELLANEOUS 1-4
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction MISCELLANEOUS 1-3
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) MISCELLANEOUS 1-5
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 (Hand mixed) MORD 11-4-3-2
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204. 12-9
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_105584.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
tenderdocument998.pdf
Tender Documents • 5.72 MB
BOQ_105584.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid