| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹6.4 L (4.84%)Admitted-Finance | ₹1.4 Cr+₹6.4 L (4.84%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K SARAVANAN L1 | P. Jaisankar L2 |
|---|---|---|---|---|---|
| 1.00 | Strengthening the road from Keerambur - Maruvathur km 0/0-4/360 Clearing the light jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete Km 0/0-4/360 | 6,170.42 | Sqm | 4.1 ₹25,298.72 Lowest | 5 ₹30,852.1 |
| 2.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m and all labour charges etc complete. Km 0/0-4/360 | 5,381.75 | Sqm | 15.3 ₹82,340.78 Lowest | 20 ₹1,07,635 |
| 3.00 | Earth work excavation in all soils such as hard grvelly soil, hard stiff clay, Stiff black cotton soil, Earth mixed with small size of boulders, with initial lead and initial lift including all labour charges etc complete. Km 0/0-4/360 | 1,044.52 | Cum | 89.5 ₹93,484.54 Lowest | 95 ₹99,229.4 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-1/0 | 447 | Cum | 1,745.58 ₹7,80,274.26 Lowest | 1,850 ₹8,26,950 |
| 5.00 | Km 1/0-2/0 | 390.33 | Cum | 1,745.58 ₹6,81,352.24 Lowest | 1,850 ₹7,22,110.5 |
| 6.00 | Km 3/0-4/0 | 467.39 | Cum | 1,745.58 ₹8,15,866.64 Lowest | 1,850 ₹8,64,671.5 |
| 7.00 | Km 4/0-4/360 | 165.75 | Cum | 1,745.58 ₹2,89,329.89 Lowest | 1,850 ₹3,06,637.5 |
| 8.00 | Providing ,laying and spreading U.S. Gravel soling including cost and conveyance of all materials to site , labour and all other incidental charges etc complete., Km 0/0-1/0 | 129.78 | Cum | 280.01 ₹36,339.7 Lowest | 300 ₹38,934 |
| 9.00 | Km 1/0-2/0 | 116.02 | Cum | 280.01 ₹32,486.76 Lowest | 300 ₹34,806 |
| 10.00 | Km 2/0-3/0 | 134.61 | Cum | 280.01 ₹37,692.15 Lowest | 300 ₹40,383 |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
1 Mar 2021, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening of 1 road in Thuraiyur Block in Tiruchirappalli District under Scheme Component of Pooled Assigned Revenue 2020-21 Additional Package No.1
2021_RDTN_198035_1
E1/0685/2020 Dated 19.02.2021
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.3 L
DRDA Tiruchirappalli
9 Sept 2021
24 Feb 2021
1 Mar 2021
24 Feb 2021
1 Mar 2021
24 Feb 2021
25 Feb 2021
Amount
Strengthening the road from Keerambur - Maruvathur km 0/0-4/360 Clearing the light jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete Km 0/0-4/360
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m and all labour charges etc complete. Km 0/0-4/360
Earth work excavation in all soils such as hard grvelly soil, hard stiff clay, Stiff black cotton soil, Earth mixed with small size of boulders, with initial lead and initial lift including all labour charges etc complete. Km 0/0-4/360
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-1/0
Providing ,laying and spreading U.S. Gravel soling including cost and conveyance of all materials to site , labour and all other incidental charges etc complete., Km 0/0-1/0
Applying Prime coat over Un primed WBM surface at 7Kg / 10 sq.m Km 0/0-4/360
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp Km 0/0-4/360
Providing and laying open graded premix carpet with seal coat 20 mm consol-idated thickness using 0.18 Cum of 13.2 mm IRC size machine crushed HBG metal and 0.09 Cum of 11.2 mm IRC size machine crushed HBG metal with 14.6 Kgs of bitumen for premixing per 10 Sqm. metre of premix carpet and 0.09 Cum of 6.75 mm IRC HBG size machine crushed HBG metal with 9.80 Kg. of bitumen per 10 Sqm. of seal coat including cost and conveyance of all materials from approved sources to worksite and stacking them to standard departmental gauge for pre-measurement including bitumen which will be supplied by the department at the departmental section store at Panchayat Union Office including conveyance of bitumen from section stores to worksite and the cost of the same will be recovered from the contractors bill at the rates specified in the special condition appended herewith including heaking and mixing the materials using mini hot mix plant for premix carpet including all labour charges for spreading the same finishing to specifications, grades and cross section and consolidation by power roller including heating and sparying the bitumen for seal coat over finished permix carpet surfaces and spreading the 6.75 mm IRC chips uniformly over the surface and rolling with power roller rolling including hire and fuel charges for mini hot mix plant. power roller and all other tools and plants employed 'including all other incidental charges etc., complete. Km 0/0-1/0
Construction of Retaining Wall at ch 1500-1521.20 Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - .
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. - .
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing .
Cost, supply and erection of steel centering for sides and soffits of all labours charges etc complete and conveyance of all materials to site and all labour charges etc
Provision for Weeb Holes
Construction of 1.50m Span RCC at ch 5m Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - .
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. - .
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing .
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle - .
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle .
Suplying filling and placing HYSD bar reinforcement (Fe 415) in Super structure complete as per drawings and technical specifications as per clause 1002.1010 and 1202 for MORD
CC 1:2:4 MIX using 20mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete .
Reinforce cement concrete 1:1 5:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc., .
Construction of 3.00m Span RCC at ch 1340m Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - .
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. - .
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing .
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle - .
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle .
Suplying filling and placing HYSD bar reinforcement (Fe 415) in Super structure complete as per drawings and technical specifications as per clause 1002.1010 and 1202 for MORD
CC 1:2:4 MIX using 20mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete .
Reinforce cement concrete 1:1 1/2:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc., .
Providing Weep holes in brick masonry stone masonry Plain/reinforced concrete abutment, wind wall, return wall with 100mm dia AC Pipe
Back filling behind abutment, wing wall and return wall complete as per drawings & technical specification clause
Construction of 3.00m Span RCC at ch 3745m Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - .
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. - .
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing .
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle - .
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle .
Suplying filling and placing HYSD bar reinforcement (Fe 415) in Super structure complete as per drawings and technical specifications as per clause 1002.1010 and 1202 for MORD
Reinforce cement concrete 1:1 1/2:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc., .
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck slab
Providing and fixing Tar Paper for bearing Betweel Bed block & Deck slab
Providing Weep holes in brick masonry stone masonry Plain/reinforced concrete abutment, wind wall, return wall with 100mm dia AC Pipe
Gravel filling between body wall including cost and conveyance of gravel labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer
Construction of 3.00m Span RCC at ch 4110m Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - .
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. - .
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing .
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle - .
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle .
Suplying filling and placing HYSD bar reinforcement (Fe 415) in Super structure complete as per drawings and technical specifications as per clause 1002.1010 and 1202 for MORD
Reinforce cement concrete 1:1 1/2:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc., .
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck slab
Providing and fixing Tar Paper for bearing Betweel Bed block & Deck slab
Providing Weep holes in brick masonry stone masonry Plain/reinforced concrete abutment, wind wall, return wall with 100mm dia AC Pipe
Gravel filling between body wall including cost and conveyance of gravel labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer
Provision for KM Stones etc
Provision for HM Stones etc
Provision for Name Board etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P. Jaisankar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.74 MB
BOQ_236539.xls
BOQ • 0.27 MB
TechBid1.pdf
Tender Documents • 0.30 MB
PriceBid1.pdf
Additional Documents • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .