| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 L+₹450 (0.09%)Rejected-AOC | ₹5.1 L+₹450 (0.09%) | L2 | Rejected-AOC L2 |
Tender Value
₹5.7 L
EMD Value
₹14,363
Closing Date
25 Sept 2024, 3:30 pmClosed
Executive Engineer
O/o.Executive Engineer,RIQCL,EKM
KIIFB Improvements to Kambilichungam Peruvemba road in Palakkad District Topographical inventory survey and subsoil investigation work Investigation Work
2024_PWD_691415_1
PWD/DE/TR/14915/2024_3_1_1/1
Open Tender
Civil Works - Others
Item Rate
60 days
kambilichungam-Peruvemba palakkad
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,270
Yes
₹14,363
Yes
4 Nov 2024
18 Sept 2024
27 Sept 2024
18 Sept 2024
25 Sept 2024
18 Sept 2024
Amount
Topographical Survey Markings
OD112931/2024-2025:Providing and fixing RCC pillars for DGPS control points of size 0.3 m x 0.3 m,0.5 m long, 0.1 m above ground level and 0.4 m below GL casted in M20 Grade concrete reinforced with 4 nos of 8 mm dia longitudinal bars and 6mm dia stirrups @ 0.15m c/c, firmly fixed in position by means of PCC of 0.1m wide and 0.4 m deep around the pillars in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint`
OD112932/2024-2025:Providing and fixing RCC pillars at every 250 m interval along the road, of size 0.15 m x 0.15 m, 0.45 m long, 0.15 m above ground level and 0.3 m below GL casted in M20 Grade concrete reinforced with 4 nos of 8 mm dia longitudinal bars and 6 mm dia stirrups @ 0.15 m c/c, firmly fixed in position by means of PCC of 0.075 m wide and 0.3 m deep around the pillars in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint
DGPS Survey, fly level ,Total station, Inventory
56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations).
OD112933/2024-2025:To carry out DGPS survey to establish primary control points - it includes observation of raw data by using dual constellation GNSS receiver, processing, net work, adjustment and submission of data in WGS 84 datum and UTM/TM projection system including traverse report ( One intervisible pair per 5 Km)
OD112934/2024-2025:To carry out Traverse to establish horizontal control traverse stations on the proposed road stretch running through from one DGPS station at every 2.50 km using electronic total station instrument at maximum of 250 m imnterval with an accuracy of 1 in 20000 which includes submission of hard and soft copies as per IRC standards
OD112935/2024-2025:Fly levelling to shift levels from given Bench mark value to next Bench mark station to horizontal traverse station and available permanent structures all along the road for the elevation purpose by closed circuit which includes submission of the hard and soft copies as per IRC Standards
OD112936/2024-2025:Total station surveying and preparation of site plan, Cross sections and Longitudinal sections are to be collected at 15 m intervals, The levels shall be taken at closer intervals at the curve portions, intersections and change in elevations, the intervals also shall be modified as per IRC : SP -19 - Plain built up area with hindrance to line of sight due to buildings/structures.(ref 56.12.b)
OD112938/2024-2025: Data for inventory survey upto 12 meter wide road for survey work of collecting road inventories and recording in prescribed format attached based on chainage marking including marking chainage at 50 m interval and taking details such as existing carriageway width,shoulder width,type of shoulder,width and location of approach road, details of existing drains, culverts and bridges as given in the format attached, pavement conditions(details of potholes,raveling,fog seal,slurry seal edge damage etc)road safety measures (details of road sign, crash barriers,guard stones,delineator post,hazard markers etc)and all other existing retaining structures in road including documentation charges etc as per direction of the officers at site
56.15.a:Hydraulic Velocity Calculation - River.
56.14.a:Cross sectional details - River.
Bore hole
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
OD115055/2024-2025:Shifting or Transporting of all boring plant and equipment's for road works from one borehole location to another with a distance more than 300 m.(For existing road )
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.7:Conducting standard penetration test in bore hole at any depth.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
OD113135/2024-2025:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.(including check list , lab test results with required graph, Bearing Capacity calculations)
Paul Alias
Bidder Name
RITECH SURVEYING AND ENGINEERING LLP
Paul Alias
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1076585.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .