Loading…
Loading…
Tender Value
₹12.3 Cr
EMD Value
₹12.3 L
Closing Date
6 Oct 2026, 6:00 pm
Executive Engineer Sipu Project Division, Palanpur
Construction Of New Bituminous Road At Sipu Main Canal Ta. Deesa Dist: B.K.
341564
Notice No.14 of 2026-27
Open
Civil Works - Roads
Works
Banaskantha
16 documents required · 15 mandatory · 1 optional
₹18,000
Executive Engineer Sipu Project Division Palanpur
₹12.3 L
3 Sept 2026
3 Sept 2026
3 Sept 2026
6 Oct 2026
3 Sept 2026
BILL OF QUANTITIES
Name of Work :- Construction Of New Bituminous Road At Sipu Main Canal Ta.
Deesa Dist: B.K.
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
1 Clearing and grubbing road land including uprooting
rank vegetation grass bushes,shrubs,sapling and trees
girth up to 300 mm removal of stumps of trees cut 11.40 Hector 28455.090
earlier and disposal of unserviceable materials
(C) By mechanical means in area of light jungle
2 Box cutting the road surface to proper slope and
camber for making a base for road work including
removing the excavated stuff and depositing on the
road side slope as directed upto 50Mt.lead.
3 Earthwork for embankment including breaking clods,
dressing with all lead and lift (excluding watering and
consolidation) (A) From Borrow pits within 3.0 Km
4 Rolling & Watering of Earth work in layers with
vibratory roller including filling in depressions which 21541.00 Cu.M. 22.960
occur during the process.
5 Construction of granular sub-base by providing well
graded material, (Metal 25.60 mm to 53 mm 35%, B.T.
Kapachi 25.60 mm to 4.75 mm 45% & Coarse sand
below 2.38 mm 20% }spreading in uniform layers
with motor grader on prepared surface, mixing by mix 12398.00 Cu.M. 1481.900
in place method with rotavator at OMC, and
compacting with smooth wheel roller to achieve the
desired density, complete as per Technical
Specification Clause 401. Grading I
6 Providing and laying W.B.M. of M.C. metal of size
mm to 63 mm size including 0.12 Cu.M. Stone
screening & 0.08 Cu.M. stone dust as filler including
spreading, watering & consolidation by vibratory
roller 80KN to 100KN static weight.
75 mm thick compacted each.
7 Providing and laying, spreading and compacting
mm thick graded stone aggregate to Wet Mix
Macadam (W.M.M.) specification including premixing
the material with water at OMC in mechanical mix
plant carriage of mixed material by tipper to site, 11115.00 Cu.M. 1550.090
laying in uniform layers with mechanical means Paver
Finisher in sub-base /base course on well prepared
surface and compacting with vibratory roller to
achieve the desired density.
8 Providing and laying bituminous grout base course
37.5 mm thick using asphalt Grade VG-30 for tack coat
at the rate of 4.0 Kg. / 10 Sq.Mt. on WBM surface and
2.50 Kg. / 10 Sq.Mt. on BT surface using B.T. stone
aggregates as per required gradation with the asphalt
of VG-30 grade at the rate of 1.99 % i.e. 19.90 Kg. /
M.T. by weight by mix including heating and mixing in
drum mix plant, transporting the mix spreading the
same by paver finisher and consolidation by vibratory
roller including cost of all materials, fuel labours, tools
and plant etc. using contractors own drum mix plant
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
9 Providing and laying 37.5 mm thick bituminous
macadam with B.T. Aggregates as per M.O.R.T.& H
gradation and Asphalt @ 2.50 Kg / 10 Sq mt for tack
coat on BT surfae, asphalt grade VG-30 {60/70} for
mixing @ 35.00 Kg. / M.T. i.e. 3.5% by total weight
including heating the aggregates and asphalt by
continuous batching of drum mix plant and spreading 5879.00 M.T. 3322.140
the same by paver finisher and consolidation with
vibratory roller 80 to 100 KN static weight including
providing all materials, equipments, tools and plant,
oil, kerosene, firewood, labour charges etc. comp.
using contractor's own machineries, drum mix plant
and paver finisher etc. complete.
10 Providing and laying 20mm thick Mixed seal surfacing
using stone chipping and aggregates as per M.O.R.T.&
H gradation and bitumen grade VG-30 for mixing at
the rate of 51 Kg. / M.T. i.e. 5.1 % by total weight of
mix, including heating & mixing the asphalt and
aggregates by continuous batching of drum mix plant
and spreading the same by paver finisher and 3135.00 M.T. 4019.750
consolidation with vibratory roller and flushing sand
@ 0.30 Cu.M. / 100 Sq.Mt. including providing all
materials equipments, tools and plant, oil, kerosene,
firewood, labour charges etc. comp. using contractor's
own machineries, drum mix and paver finisher etc.
11 Providing and laying asphalt painting on BT surface
with Bitumen grade VG-30 at the rate of 5 kG/10 sqm.
By mechanical sprayer and spreading the stone dust
on prepared surface at the rate of 0.03 Cum/ 10 Sqm.
Etc. complete and rolling with PTR roller and brushing
12 Providing hard side shoulder of 100 mm thick for
embankment using quarry spall with all lead and lift
and including watering and rolling and consolidation
of sub grade in layers at OMC to required dry density
including filling depression which occur during the
process using vibratory roller of 80 KN to 100 KN
(selected quarry spall having CBR value not less than
13 Providing and fixing ordinary Kilometer stone of
approved hard stone as per I.R.C. type design in C.C.
1:4:8 including painting and lettering etc. complete
(For O.D.Road,V.R.)
14 Providing and fixing 5th Kilometer stone of precast
C.C. 1:2:4 including necessary reinforcement as per
I.R.C. type design in C.C. 1:4:8 including 3.00 No. 1935.150
painting,lettering etc. complete (For N.H., S.H. and
15 Providing and fixing hectometer stone as per I.R.C.
type design including painting, lettering etc. complete. 76.00 No. 116.080
(I) Fixing in earth
16 Road Marking with Hot applied thermoplastic paints
with Reflectorising glass beads on Bitumin surface.
Providing & Laying a hot applied Thermoplastic 3800.00 Sq.Mt. 367.720
compound 2.5 mm thick including refflectorising glass
beads @ 250 gms. Sqm. Area thickness of 2.5 mm is
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
excluding of Surface applied glass beads as per IRC
:35-2015. The finished surface to be level , uniform
and free from streaks and holes Zebra patta / bump
patta lane / center line / edges/ Cut patta. The white
colour marking should provide leminance coefficient
on cermend road shallbe min. 130 mcd/m2/lux and
Ashphalt road shall be minimum 100 mcd/m2/lux
during the service life during the dry time. The
marking should should meet the performance criteria
for night time / reflectivity, wet reflectivitiy and skid
reasistance as mentioned in the section-15 of IRC 35 -
2015. Warranty for Retro Reflectivity Two Year
17 Cat Eye / Road Stud / RPM: Providing & fixing Raised
Pavement Markers made of polycarbonate and ABS
moulded body and reflective panels with Micro
prismatic lens (No Glass bead lens) capable of
providing total internal reflection of the light entering
the lens face and shall support a load of 13635 kgs.
tested in accordance to ASTM D 4280 Type H and
complying to Specifications of Category A of MORTH
Circular No RW/NH/33023/10-97 Ð DO III Dt 11.06.
1997. The height, width and length shall not exceed 20 4222.00 No. 217.400
mm, 130 mm and 130 mm and with minimum
reflective area of 13 Sqcm on each side and the slope
to the base shall be 35 +/- 5 degree. The body of the
marker should having finger grip for easy and
accurate placement and application with epoxy /
bituminous Adhesive as recommended by the
manufacturer of the marker. The color of the marker
should be as per the IRC 35-2015 and as directed by
Engineer-in- Carge.
Rupees Twelve Crore Thirty Four Lakh Seven Thousand Three Hundred Fifty One Paise Twenty
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1. The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change
as per actual mix design the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Sr. Divisional Accounts Officer Executive Engineer
Sipu Canal Sub Div. No 2 Sipu Project Division Sipu Project Division
Dantiwada Palanpur Palanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BID SECURITY (BANK GUARANTEE).pdf
SBD Sipu Canal Road.pdf
BOQ SBD Sipu Canal Road.pdf
Nivida No.14.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .