| 1 | L1₹2.8 LAccepted-AOC P O PURUWALA TEHSIL PAONTA SAHIB DISTT SIRMOUR 173025 H P | PAONTA SAHIB | SIRMOUR | HIMACHAL PRADESH | 173025 | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹3.3 L+₹45,330.88 (16.2%)Rejected-Finance VPO DHAULAKUAN PAONTA SAHIB HIMACHAL PRADESH | PAONTA SAHIB | HIMACHAL PRADESH | L2 | Rejected-Finance L2 BIDDER | |
| 3 | L3₹4.3 L+₹1.5 L (53.7%)Rejected-Finance 6A GAU KRIPA MOHKAMPUR PHASE 1 INDUSTRIAL AREA DELHI ROAD MEERUT UTTAR PRADESH 250002 | MEERUT | UTTAR PRADESH | 250002 | L3 | Rejected-Finance L3 BIDDER | |
| 4 | Rejected-Technical CHIYAMIMYANA PO KANSAR TEHSIL PAONTA SAHIB SIRMOUR HP | SIRMAUR | SIRMAUR | HIMACHAL PRADESH | - | Rejected-Technical NOT QUALIFIED |
Tender Value
Refer Docs
EMD Value
₹4,788
Closing Date
7 Oct 2023, 11:00 amClosed
Resident Engineer
Giri Power House Division HPSEBL Girinagar
Repair and overhauling of 132kV Isolators at 132or33kV Substation Giri Nagar
2023_HPSEB_79238_1
REGPHD/DB-18/2023-24-44
Open Tender
Repair and Maintenance Works
Item Rate
61 days
220/132kv s/stn Girinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹4,788
13 Oct 2023
25 Sept 2023
7 Oct 2023
25 Sept 2023
7 Oct 2023
25 Sept 2023
Amount
O/M of 132/33kV Substation Giri Nagar
Repair and overhauling of 132kV Isolators outdoor horizontal mounting centre rotatinng double break three phase gang operated 1600A Danke Control make. The scope of work includes rectification of problem of advance/delayed movement and locking mechanism of isolator blades for individual phases, providing and applying corrosion protection kit on male and female contacts after cleaning contact's surface and providing a layer of anti-static coating to prevent pitting, corrosion and carbon deposition due to arcing on contacts, providing and applying contact lubricating kit Cyclo/Sprayjet or equivalent make on gear mechanism after cleaning and lubricating of all the static and moving/rotational metal contacts with non-conductive spray to remove rust and reduce friction between moving parts of gear mechanism and finally testing for simultaneous operation of all three poles/blades and smooth operation of gear mechanism to the entire satisfaction of Engineer-in-charge for the following islators at 132/33kV Substation Giri Nagar:- 1. 132kV Solan-1st : Bus-A, Bus-B & Line Isolator = 3 No. 2. 132kV Solan-2nd : Bus-A, Bus-B & Line Isolator = 3 No. 3. 132kV Gondpur : Line Isolator = 1 No. 4. 132kV Bay of 220/132kV 100MVA Transformer-1 : Bus-A & Bus-B Isolators = 2 No. 5. 132kV Bay of 220/132kV 100MVA Transformer-2 : Bus-A & Bus-B Isolators = 2 No.
Replacement of damaged horizontal Isolator Coupling rod of 132 kV Bus-A Isolator and worn out driving mechanism worm of Solan-1st Circuit at 132/33kV Substation Giri Nagar
Replacement of misaligned vertical Isolator Coupling rod, rod holding channel support and worn out driving mechanism worm of 132 kV Line Isolator of 132kV Giri-Paonta feeder at 132/33kV Substation Giri Nagar
Replacement of worn out driving mechanism worm of 132 kV Bus-A Isolator of 220/132kV 100MVA Transformer-2 at 132/33kV Substation Giri Nagar
M/S GUPTA ELECTRICALS
ANUSHREE ELECTRICAL ENGINEERS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .