Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC BXMPS0586H | L1 | Accepted-AOC President, secretary and committee members
Approved all bidders as per committee resolution number 1(6) dated 02/09/2025 | |
| 2 | L2₹4.8 L+₹4,465 (0.93%)Rejected-Finance 275 THURUTHY LAKSHAMVEEDU COLONY ANGANWADY ROAD TILE PAVING WARD 7 | THRISSUR | KERALA | 679105 | L2 | Rejected-Finance President, secretary and committee members as per committee resolution number 1(6) dated 02/09/2025 |
| Sl No | Description | Qty | Unit | SOJAN N GEORGE L1 | BASIL P VARGHES L2 |
|---|---|---|---|---|---|
| 1.00BUILDING | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 10.44 | cum | 250 ₹2,610 Lowest | 250 ₹2,610 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.61 | cum | 7,800 ₹20,358 Lowest | 7,850 ₹20,488.5 |
| 1.00 | OD155016/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 12 | cum | 3,500 ₹42,007 Lowest | 3,700 ₹44,407.4 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 4.08 | sqm | 350 ₹1,428 Lowest | 350 ₹1,428 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 8,500 ₹8,466 Lowest | 8,500 ₹8,466 Lowest |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 5.35 | cum | 7,000 ₹37,429 Lowest | 7,000 ₹37,429 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 24.87 | sqm | 340 ₹8,455.8 Lowest | 340 ₹8,455.8 Lowest |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 36.8 | sqm | 150 ₹5,520 Lowest | 150 ₹5,520 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 45.08 | kg | 150 ₹6,761.25 Lowest | 150 ₹6,761.25 Lowest |
Tender Value
₹5.1 L
EMD Value
₹12,691
Closing Date
25 Aug 2025, 5:00 pmClosed
SHEHANA C A
ASSISTANT ENGINEER OKKAL GRAMA PANCHAYAT OKKAL
219/26 Construction of SHE GYM in ward 10
2025_LSGD_787366_1
10/AE/LSGD/OKL/25-26
Open Tender
Civil Works - Others
Item Rate
240 days
OKKAL
219/26 Construction of SHE GYM in ward 10
7 documents required · 7 mandatory
₹1,120
₹12,691
18 Oct 2025
16 Aug 2025
29 Aug 2025
16 Aug 2025
25 Aug 2025
16 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1294867.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .