Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹9.2 L
Closing Date
10 Jun 2026, 11:00 amClosed
Superintending Engineer, Drainage Circle, Ballia
Superintending Engineer, Drainage Circle, Ballia
the reconstruction of the damaged V.R.B. on the Dohrighat Sahayak Main Canal in District Ballia.
2026_UPIDC_1157080_2
04/SE/2026-27
Open Tender
Civil Works
Item Wise
270 days
B
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,954
₹9.2 L
Yes
Superintending Engineer, Drainage Circle, Ballia
22 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling of R.C.C.work including stacking of dismental material with all charges etc complete. | 106 | cum | - | - |
| 2 | Dismentaling of Brick work in cement Mortar including stacking of dismental material with all charges etc complete. | 437.26 | cum | - | - |
| 3 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal including all lead & lift etc complete. | 2,740.09 | cum | - | - |
| 4 | Centering and shuttering for P.C.C M-10 work including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. | 172.74 | cum | - | - |
| 5 | Laying P.C.C. M-10 work in with coarse sand FM.>2 and stone grit size 20.0 mm to 40 mm. for foundation including all cost of materials,T&P and labour etc complete. | 131.38 | Sqm | - | - |
| 6 | Centering and shuttering for R.C.C M-20 & R.C.C M-25 work including all cost of materials,T&P labours and other accessories required for proper completion of work with all charges. | 4,730.44 | Sqm | - | - |
| 7 | Laying R.C.C. work in M-20 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. | 2,201.99 | cum | - | - |
| 8 | Laying R.C.C. work in M-25 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. | 290.73 | M.T | - | - |
| 9 | Reinforcement 10 mm to 20mm bar with carriage, cutting, bending, and placing in position including cost of binding wire,labours,T&P etc all complete. | 60.45 | Job | - | - |
| 10 | Dewatering Work Running of 5 H.P. genrator set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work. | 570 | cum | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.53 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.85 MB
BID2.pdf
Tender Documents • 1.51 MB
BOQ_2168215.xls
BOQ • 0.32 MB
corri03.pdf
PDF • 0.36 MB
corri02.pdf
PDF • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .