Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹4.3 L
Closing Date
31 Mar 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Proposed construction of New Bridge at km 21/30-32 in between TEL - VJA stations in GNT - TEL section
489-DRM-W-GNT-Tid-2846
489-DRM-W-GNT-Tid-2846
Open
Works - General
9 Months
Guntur, Andhra Pradesh
₹0
₹4.3 L
31 Mar 2026
9 Mar 2026
17 Mar 2026
118 items across 8 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 30,62,718.67 | ||
| — | 24.00 | — | — | ||
| Exploratory drilling of boreholes down to required depth, drilling of 150mm dia. boreholes in all type of soils except hard rock & large boulders (boulder core more than 30cm) including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion/chiselling tool for advancing through occasional seams of hard strata to be employed, where necessary in Dry area. 0m to 10m | — | — | — | 25,560 | |
| — | 4.00 | — | — | ||
| Taking out 100mm dia. & 450mm long undisturbed samples of soil from bore holes, including provision of air tight containers for packing and, labeling incl. transporting the samples to laboratory. Piston sampler shall be used for extracting undisturbed samples where necessary. Samples shall be collected as per IS:2720. | — | — | — | 551.24 | |
| — | 1.00 | — | — | ||
| Conducting laboratory Tests on collected soil samples as per relevant IS code Atterberg Limits | — | — | — | 535.18 | |
| — | 1.00 | — | — | ||
| Conducting laboratory Tests on collected soil samples as per relevant IS code Tri-axial Test | — | — | — | 2,006.91 | |
| — | 120.00 | — | — | ||
| Providing portable fencing along running track where work is to be done in close vicinity of track, maintaining during execution of work and removing after completion of the work as per direction of the Engineer. Fencing shall consist of self supporting steel angles of size 50mm x 50mm x 6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23m x 0.23m x 0.23m placed at c/c distance of 2m along track. 12mm dia rods in three horizontal layers shall be tack welded with angle posts. Note : Released material will be property of the contractor after completion of work. Cost of cement required for CC blocks shall be paid separately. With provision of painting verticals & horizontals with red luminous paints / strips of 30cm each with a gap of 30 cm. | — | — | — | 13,724.4 | |
| — | 19.00 | — | — | ||
| Supply and laying of quarry dust including consolidation, supply of all materials, labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media. | — | — | — | 23,191.78 | |
| — | 37.00 | — | — | ||
| Supply and laying of coarse sand including consolidation with all labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media. | — | — | — | 73,429.46 | |
| — | 2822.00 | — | — | ||
| Centering and shuttering including strutting, propping etc. and removal of form for : All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level | — | — | — | 17,10,103.78 | |
| — | 375.00 | — | — | ||
| Providing and applying two coats of coal tar or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer. | — | — | — | 62,238.75 | |
| — | 788.00 | — | — | ||
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. All kinds of soils | — | — | — | 1,49,428.44 | |
| — | 143.00 | — | — | ||
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. Soft rock (not requiring blasting) | — | — | — | 55,441.1 | |
| — | 20.00 | — | — | ||
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. Hard rock (requiring blasting) | — | — | — | 14,163.4 | |
| — | 972.00 | — | — | ||
| Providing and fixing Weep Holes in Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge. | — | — | — | 2,25,280.44 | |
| — | 268.00 | — | — | ||
| Supplying of stone boulders weighing not less than 35 kg each at specified bridge locations. | — | — | — | 2,68,924.6 | |
| — | 221.00 | — | — | ||
| Providing Boulder Backing behind wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra. | — | — | — | 73,833.89 | |
| — | 47.00 | — | — | ||
| Laying Pitching with Stone Boulders supplied by Railway with voids filled with spalls on slopes, laid over prepared filter media including boulder apron laid dry in front of toe of embankment as per drawings and technical specifications. Note: Filter media to be paid under relevant item. | — | — | — | 19,079.18 | |
| — | 2.00 | — | — | ||
| — | 2.00 | — | — | ||
| Providing cast in-situ plaques for bridge foundations details of size 45cmx45cmx5cm in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm deep notch over abutment & piers, engraving the letters & figures with CM 1:3 and finished smooth including painting letters and figures with 2 coats of black enamel and plaque with white enamel with all labour, tools, cement, paint, curing etc. as a complete job. | — | — | — | 2,296.44 | |
| — | 2.00 | — | — | ||
| Providing Flood Level Gauges on abutments and piers, made by 20mm thick 1:4 cement plaster for a width of not less than 300mm, duly engraving markings & figures in metres, divided into 10 parts commencing from under-side of girders towards bed, painting markings & figures with black enamel paint in three coats on white background including painting HFL Mark in white by side of gauge with year of occurrence with all Contractor's materials, labour, tools, scaffolding and supports, lead & lifts, curing etc. complete as per approved drawing and as directed by the Engineer in- charge excluding cost of cement which shall be paid extra. | — | — | — | 993.36 | |
| — | 200.00 | — | — | ||
| Providing and inserting nipples of size 12 to 20 mm dia. with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary after completion of grouting. | — | — | — | 12,290 | |
| — | 400.00 | — | — | ||
| Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra). Cement Sand Mortar (1:1) Grout with 20% anti-shrinkage compound w.r.t. cement. | — | — | — | 44,728 | |
| — | 200.00 | — | — | ||
| Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra). Epoxy Grout | — | — | — | 2,46,908 | |
| — | 900.00 | — | — | ||
| Hour | HP | — | — | ||
| Dewatering of natural or accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. | — | — | — | 36,522 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
2846MasterDocument01WorksGCC2022withACS10.pdf
ATTACHMENT
2846-MasterDocument02WorksGCC2022withACS10.pdf
ATTACHMENT
SplConditionsforBridgeworks.pdf
ATTACHMENT
sitelaboratoryestablishmentbycontractor.pdf
ATTACHMENT
29.12.2025_PrescribingUniformDefectLiabilityPeriodDLP_maintenanceperiodunderIRGCCandEPCContractsofBridge_ROB_RUBsworks.1.PDF
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .