| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC SREENILAYAM MANNADI P O | IDUKKI | KERALA | 685501 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹15.7 L+₹1.1 L (7.81%)Rejected-AOC | L2 | Rejected-AOC Second Lowest |
Tender Value
₹17.4 L
EMD Value
₹43,400
Closing Date
22 Oct 2020, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer KIP RB Division No II PulamonKottarakkara PIN 691531
SDRF Rectification of RB Main Canal for arresting severe leakage
2020_Irrig_391902_1
10/ET/KIP/RB/DnII/2020-21
Open Tender
Civil Works - Canal
Item Rate
60 days
Malamekkara
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,290
Yes
Executive Engineer KIP RB Division No II Kottarakk
₹43,400
Yes
6 Jan 2021
14 Oct 2020
30 Oct 2020
14 Oct 2020
22 Oct 2020
14 Oct 2020
Amount
Scheme 1- From Ch.53178 m to 53197m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge.
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the worketc complete as per specification and as per the direction of Engineeer-in -Charge
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staffetc complete as per specification and as per the direction of Engineeer-in -Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17597/2020_2021/P2 : Cement concrete 1:4:7 using 20mm Broken Stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials, labour charges, watering, curing etc complete as per specification and as per the direction of Engineeer-in -Charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineeer-in -Charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 2-From Ch.53197 m to 53216m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17597/2020_2021/P2 : Cement concrete 1:4:7 using 20mm Broken Stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials, labour charges, watering, curingetc complete as per specification and as per the direction of Engineeer-in -Charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 3-From Ch.53216 m t0 53283 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17597/2020_2021/P2 : Cement concrete 1:4:7 using 20mm Broken Stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials, labour charges, watering, curing etc complete as per specification and as per the direction of Engineeer-in -Charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 4- From ch. 53283m to 53295m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17597/2020_2021/P2 : Cement concrete 1:4:7 using 20mm Broken Stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials, labour charges, watering, curing etc complete as per specification and as per the direction of Engineeer-in -Charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 5-From Ch.53295 m to 53307m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17597/2020_2021/P2 : Cement concrete 1:4:7 using 20mm Broken Stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials, labour charges, watering, curing etc complete as directed by the departmental officers.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineeer-in -Charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 6- From Ch.53307m to 53319m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17597/2020_2021/P2 : Cement concrete 1:4:7 using 20mm Broken Stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials, labour charges, watering, curing etc complete as per specification and as per the direction of Engineeer-in -Charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour chargesetc complete as per specification and as per the direction of Engineeer-in -Charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 7- From Ch.53319 m to 53335 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17597/2020_2021/P2 : Cement concrete 1:4:7 using 20mm Broken Stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials, labour charges, watering, curing etc complete as directed by the departmental officers.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineeer-in -Charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 8- From Ch. 53335 m to 53354 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc complete as per specification and as per the direction of Engineeer-in -Charge
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17597/2020_2021/P2 : Cement concrete 1:4:7 using 20mm Broken Stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials, labour charges, watering, curing etc complete as per specification and as per the direction of Engineeer-in -Charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour chargesetc complete as per specification and as per the direction of Engineeer-in -Charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 9- From Ch.53354 m to 53817 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17597/2020_2021/P2 : Cement concrete 1:4:7 using 20mm Broken Stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials, labour charges, watering, curing etc complete as per specification and as per the direction of Engineeer-in -Charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineeer-in -Charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 10-From Ch.53817 m to 53836m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17600/2020_2021/P2 : Providing and laying in position cement concrete 1:4:7 using 20mm nominal size broken stone to lines and levels for bed and sides and shoulder of canal including all cost and conveyance of materials ,labour charges ,watering,curing etc. complete as per specification or as directed by the departmental officers at site.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineeer-in -Charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 11-From Ch.53836 m to 53855m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17602/2020_2021/P2 : Canal lining in cement concrete 1:4:7 using 20mm nominal size broken stone to lines and levels for bed, sides and shoulders of canal including all cost and conveyance of materials, labour charges, watering, compacting, curing etc. complete as per specification and as directed by the departmental officers.( based on DAR Item 4.1.5)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineeer-in -Charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 12-From Ch.53855 m to 53875 m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17602/2020_2021/P2 : Canal lining in cement concrete 1:4:7 using 20mm nominal size broken stone to lines and levels for bed, sides and shoulders of canal including all cost and conveyance of materials, labour charges, watering, compacting, curing etc. complete as per specification and as directed by the departmental officers.( based on DAR Item 4.1.5)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineeer-in -Charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
Scheme 13-From Ch.53875 m to 53895
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc complete as per specification and as per the direction of Engineeer-in -Charge
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per specification and as per the direction of Engineeer-in -Charge
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)etc complete as per specification and as per the direction of Engineeer-in -Charge
od17602/2020_2021/P2 : Canal lining in cement concrete 1:4:7 using 20mm nominal size broken stone to lines and levels for bed, sides and shoulders of canal including all cost and conveyance of materials, labour charges, watering, compacting, curing etc. complete as per specification and as directed by the departmental officers.( based on DAR Item 4.1.5)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineeer-in -Charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.etc complete as per specification and as per the direction of Engineeer-in -Charge
M R PUSHPAKUMAR
Bidder Name
R.Rajendran Pillai
M R PUSHPAKUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_557534.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .