Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC | ₹2.9 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹2.9 CrRejected-AOC | ₹2.9 Cr | L2 | Rejected-AOC Rejected |
| 3 | L3₹2.9 CrRejected-AOC | ₹2.9 Cr | L3 | Rejected-AOC Rejected |
| 4 | L4₹3.0 CrRejected-AOC | ₹3.0 Cr | L4 | Rejected-AOC Rejected |
| 5 | L5₹3.5 CrRejected-AOC | ₹3.5 Cr | L5 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
16 Jan 2020, 3:00 pmClosed
AGM(TnC)
Panchpatmali Bauxite Mines, NALCO, Damanjodi-763008, Koraput
Technological cleaning of spilled bauxite at CnC and cable belt corridor and assistance for mechanical maintenance at Nalco Mines, Damanjodi
2019_NALCO_529206_1
TnC/MINES/CnC/R-1160
Open Tender
Miscellaneous Services
730 days
Panchpatmali Bauxite Mines, Nalco
Applicable(Ref. Tender Doc)
3 documents required · 3 mandatory
₹2,000
Yes
NALCO
₹3.5 L
Yes
26 Feb 2020
20 Dec 2019
18 Jan 2020
20 Dec 2019
16 Jan 2020
20 Dec 2019
Amount
Supervision & collection of spilled bauxite in & around crusher house ( Stream-1 & 2) starting from ROM hopper to tension tower, dribble chute and cleaning of spillage bauxite dust at angle station of cable hauled conveyor in all working days i.e. 365 days in a year.
i) Dry season (October to May): Deployment of minimum of 06(Six) USW in each shift i.e. A, B & C at Mines. 01(One) USW at Angle station in each shift i,e A,B&C shift and one supervisor(SSW) in A,B,& C shift each at Mines.
ii) Monsoon season (June to September): Deployment of minimum of 07(Seven) USW in each shift i.e.A,B&C shift at Mines .01(One) USW at Angle station in each shift i.e. A,B&C shift. 01(One) supervisor (SSW) in each shift at mines i.e. A, B&C shift in Mines.
De-dusting of equipments, cleaning of floors & staircase and house keeping at different levels of crusher house building & drive house including supervision.
Collection of spillage bauxite along the cable belt conveyor corridor including supervision.
Supply of task force for bauxite handling system to take care exigencies like jamming of chuts due to wet bauxite or failure of inter lock, jamming of boulders in crusher chutes, flooding of conveyors and cleaning of excess/flooding ore on cable belt conveyor during monsoon.
Assistance for mechanical maintenance works
i. SW (Welder cum Gas cutter)
ii. USW
M/S SUSANT KUMAR BINOD
PREM PATRA TURUK
Hems Corporation
S.V.ENGINEERING
B N CHOUDHURY
M/s K.C. MUDULI
M/s. D B PATNAIK
M/S RITESH ENGINEERING WORKS
HARI BANDHU BISWAL
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid