| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC | ₹4.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 Cr+₹3.4 L (0.82%)Rejected-Finance | ₹4.2 Cr+₹3.4 L (0.82%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹4.4 Cr+₹24.7 L (5.87%)Rejected-Finance GROUND FLOOR SSK ENCLAVE SSK ENCLAVE DEEVAR ROAD PERUMANOOR KOCHI KERALA 682015 | ERNAKULAM | KERALA | 682015 | ₹4.4 Cr+₹24.7 L (5.87%) | L3 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | S AND C MULTICOMMERCIALS PVT. LTD L3 | TK Jose L2 | Addon Facility Services L1 |
|---|---|---|---|---|---|---|
| 1.00 | PART (A)
Complete upkeeping of offices, residential building and toilets in TELK by Sweeping, wet cloth moping, cleaning of sanitary fittings, floor and wall tiles, cleaning of premises of toilets etc. as detailed below by deploying a minimum of 8 trained Women labourers including cost of labour and material.
Please refer 'Detailed Specification of Work under BOQ Part - A (Annexure - A). Total 610 working days are considered during two years period.
(Lump Sum rate per day for undertaking the above scope of work deploying a minimum of 8 trained Women labourers including cost of labour and material shall be quoted here). | 610 | Lump Sum rate per day | 58,90,160 ₹69,50,388.8 | 48,80,000 ₹57,58,400 Lowest | 60,14,173 ₹60,14,173 |
| 2.00 | PART (A)
Supply of special labour for closing leakages of roof of factory buildings, office & residential buildings using tar felt, roofing compound & leak proofing materials including changing of hook bolts & washers, asbestos & polycarbonate sheets and repairing & painting of gutters & down water pipes with Al/AC sheets & MS plates etc. complete as and when required.
Necessary materials will be supplied by the company free of cost.
(Rate per man day shall be quoted here) | 1,400 | Rate per day | 18,31,200 ₹21,60,816 Lowest | 24,38,800 ₹28,77,784 | 22,66,740 ₹22,66,740 |
| 3.00 | PART (A)
Factory and factory office cleaning, shop arrangement, loading and unloading of materials, movement of materials to different locations etc. by deploying a minimum of 10 Men in the first shift on every working day on a full time basis as a lump sum work :-
Total 610 working days are considered during two years period.
Lumpsum rate per day for undertaking the above work by deploying a minimum of 10 Men in the first shift on every working day.
(Lumpsum rate per day for undertaking the above scope of work deploying a minimum 10 trained Men in the first shift shall be quoted here) | 610 | Lump Sum Rate per day | 84,05,800 ₹99,18,844 | 74,42,000 ₹87,81,560 | 75,42,040 ₹75,42,040 Lowest |
| 3.10 | PAR (A)
Factory and factory office cleaning, shop arrangement, loading and unloading of materials, movement of materials to different locations etc. by deploying a minimum 3 Men in the second shift on every working day on a full time basis as a lump sum work :-
Total 610 working days are considered during two years period.
Lumpsum rate per day for undertaking the above work by deploying a minimum of 3 Men in the second shift on every working day.
(Lumpsum rate per day for undertaking the above scope of work deploying minimum 3 trained Men in the second shift shall be quoted here) | 610 | Lump Sum Rate per day | 25,12,590 ₹29,64,856.2 | 23,42,400 ₹27,64,032 | 23,31,054 ₹23,31,054 Lowest |
| 3.20 | Supervisors on every working day on full time basis for supervising all employess under this contract including Part A and Part B | 610 | Lump Sum Rate per day | 15,60,380 ₹18,41,248.4 | 7,93,000 ₹9,35,740 | 4,88,000 ₹4,88,000 Lowest |
| 4.00PART B Labour Charges in the case of additional labourers to be supplied in order to meet urgent works and that not covered under 1.00, 2.00, 3.00 & 3.10. The bidders shall quote only the rate of labour on daily wage rate and overtime rate, night shift etc. against Sl.No. 4.11 to 4.14, 4.21 to 4.23, 4.31 to 4.33, 5.10 to 5.40, 6.10 to 6.40, 7.10 to 7.40, 8.10 to 8.40, 9.10, 9.20, 10.10, 10.20, 11.10 to 11.30, 12.10 to 12.30. | ||||||
| 4.10Man Labourers | ||||||
| 4.11 | a) During day shift
(Rate per day for man labour shall be quoted here) | 4,600 | Rate per day | 59,93,800 ₹70,72,684 | 56,12,000 ₹66,22,160 | 58,90,024 ₹58,90,024 Lowest |
| 4.12 | b) During night shift
(Rate per day for man labour shall be quoted here) | 10 | Rate per day | 13,570 ₹16,012.6 | 12,800 ₹15,104 | 5,000 ₹5,000 Lowest |
| 4.13 | c) Overtime after Duty shift on working days
(Rate per hour for man labour shall be quoted here) | 2,000 | Rate per hour | 3,94,000 ₹4,64,920 | 4,84,000 ₹5,71,120 | 3,61,920 ₹3,61,920 Lowest |
Tender Value
Refer Docs
EMD Value
₹4.3 L
Closing Date
21 Feb 2025, 4:30 pmClosed
SMRM
TELK,ANGAMALY
Biennial Contact for House Keeping of TELK Campus
2025_TEKL_731891_2
TELK/C AND M/FSC/HK/335/2025
Open Tender
Miscellaneous Works
Item Wise
730 days
TELK, ANGAMALY
Please refer Tender documents.
2 documents required · 2 mandatory
₹25,000
Yes
₹4.3 L
Yes
26 Sept 2025
14 Feb 2025
24 Feb 2025
14 Feb 2025
21 Feb 2025
14 Feb 2025
PART (A) Complete upkeeping of offices, residential building and toilets in TELK by Sweeping, wet cloth moping, cleaning of sanitary fittings, floor and wall tiles, cleaning of premises of toilets etc. as detailed below by deploying a minimum of 8 trained Women labourers including cost of labour and material. Please refer 'Detailed Specification of Work under BOQ Part - A (Annexure - A). Total 610 working days are considered during two years period. (Lump Sum rate per day for undertaking the above scope of work deploying a minimum of 8 trained Women labourers including cost of labour and material shall be quoted here).
PART (A) Supply of special labour for closing leakages of roof of factory buildings, office & residential buildings using tar felt, roofing compound & leak proofing materials including changing of hook bolts & washers, asbestos & polycarbonate sheets and repairing & painting of gutters & down water pipes with Al/AC sheets & MS plates etc. complete as and when required. Necessary materials will be supplied by the company free of cost. (Rate per man day shall be quoted here)
PART (A) Factory and factory office cleaning, shop arrangement, loading and unloading of materials, movement of materials to different locations etc. by deploying a minimum of 10 Men in the first shift on every working day on a full time basis as a lump sum work :- Total 610 working days are considered during two years period. Lumpsum rate per day for undertaking the above work by deploying a minimum of 10 Men in the first shift on every working day. (Lumpsum rate per day for undertaking the above scope of work deploying a minimum 10 trained Men in the first shift shall be quoted here)
PAR (A) Factory and factory office cleaning, shop arrangement, loading and unloading of materials, movement of materials to different locations etc. by deploying a minimum 3 Men in the second shift on every working day on a full time basis as a lump sum work :- Total 610 working days are considered during two years period. Lumpsum rate per day for undertaking the above work by deploying a minimum of 3 Men in the second shift on every working day. (Lumpsum rate per day for undertaking the above scope of work deploying minimum 3 trained Men in the second shift shall be quoted here)
Supervisors on every working day on full time basis for supervising all employess under this contract including Part A and Part B
PART B Labour Charges in the case of additional labourers to be supplied in order to meet urgent works and that not covered under 1.00, 2.00, 3.00 & 3.10. The bidders shall quote only the rate of labour on daily wage rate and overtime rate, night shift etc. against Sl.No. 4.11 to 4.14, 4.21 to 4.23, 4.31 to 4.33, 5.10 to 5.40, 6.10 to 6.40, 7.10 to 7.40, 8.10 to 8.40, 9.10, 9.20, 10.10, 10.20, 11.10 to 11.30, 12.10 to 12.30.
Man Labourers
a) During day shift (Rate per day for man labour shall be quoted here)
b) During night shift (Rate per day for man labour shall be quoted here)
c) Overtime after Duty shift on working days (Rate per hour for man labour shall be quoted here)
d) Overtime on Sundays and other Holidays (Rate per hour for man labour shall be quoted here)
Women labourers
a) During day shift (Rate per day for woman labour shall be quoted here)
b) Overtime after Duty shift on working days (Rate per hour for woman labour shall be quoted here)
c) Overtime on Sundays and other Holidays (Rate per hour for woman labour shall be quoted here)
Women Special labourers
a) During day shift (Rate per day for woman labour shall be quoted here)
b) Overtime after Duty shift on working days (Rate per hour for woman labour shall be quoted here)
c) Overtime on Sundays and other Holidays (Rate per hour for woman labour shall be quoted here)
Painter labourer/Labour for pruning of trees/ Fabrication/ Slinging of materials (work at below 4 m height)
a) During day shift (Rate per man day shall be quoted here)
b) During night shift (Rate per man day shall be quoted here)
c) Overtime after Duty shift on working days (Rate per man hour shall be quoted here)
d) Overtime on Sundays and other Holidays (Rate per man hour shall be quoted here)
Special men labourer/Painter /pruning of trees/ Fabrication removal of cobweb (Work at 4m height to 6m height & depth)
a) During day shift (Rate per man day shall be quoted here)
b) During night shift (Rate per man day shall be quoted here)
c) Overtime after Duty shift on working days (Rate per man hour shall be quoted here)
d) Overtime on Sundays and other Holidays (Rate per man hour shall be quoted here)
Painter/Fabrication (work at below 6 m height)
a) During day shift (Rate per man day shall be quoted here)
b) During night shift (Rate per man day shall be quoted here)
c) Overtime after Duty shift on working days (Rate per man hour shall be quoted here)
d) Overtime on Sundays and other Holidays (Rate per man hour shall be quoted here)
Mason/carpenter/removal of sewage block
a) During day shift (Rate per man day shall be quoted here)
b) During night shift (Rate per man day shall be quoted here)
c) Overtime after Duty shift on working days (Rate per man hour shall be quoted here)
d) Overtime on Sundays and other Holidays (Rate per man hour shall be quoted here)
Gardener
a) During day shift (Rate per man day shall be quoted here)
b) Overtime on Sundays and other Holidays (Rate per man hour shall be quoted here)
Labour for closing leakages & Fabrication at the roof
a) Overtime after Duty shift on working days (Rate per man hour shall be quoted here)
b) Overtime on Sundays and other Holidays (Rate per man hour shall be quoted here)
Labour for Cob web removal from plant ceilings /cleaning of crane cabin
a) During Day shift (Rate per man day shall be quoted here)
b) Overtime after Duty shift on working days (Rate per man hour shall be quoted here)
c) Overtime on Sundays and other Holidays (Rate per man hour shall be quoted here)
Labour for Cob web removal above 6m height
a) During day shift (Rate per man day shall be quoted here)
b) Overtime after Duty shift on working days (Rate per man hour shall be quoted here)
c) Overtime on Sundays and other Holidays (Rate per man hour shall be quoted here)
TK Jose (BID ID -2117386)
S AND C MULTICOMMERCIALS PVT. LTD (BID ID -2108685)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .