Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC BADECHHINA ALMORA | ₹3.3 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹3.4 L+₹6,745.30 (2.02%)Rejected-AOC ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | ₹3.4 L+₹6,745.30 (2.02%) | L2 | Rejected-AOC L2 |
| 3 | L2₹3.4 L+₹8,621.62 (2.59%)Rejected-AOC DURGA CITY CENTER BHOTIYA PAARAW HALDWANI DISTT NAINITAL | NAINITAL | UTTARAKHAND | 244715 | ₹3.4 L+₹8,621.62 (2.59%) | L2 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | GURUKRIPA ENGINEERS AND CONTRACTORS L2 | M/S HARINANDAN JOSHI L1 | MAA JAGDAMBA TRADERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of Top Channel Holding Clamp for SP-23 Pole | 36 | Nos | 170 ₹6,120 | 168 ₹6,048 Lowest | 169 ₹6,084 |
| 2.00 | Supply of Stay Clmap S/E for SP-23 with N&B | 8 | Nos | 255 ₹2,040 | 252 ₹2,016 Lowest | 253 ₹2,024 |
| 3.00 | Supply of Bracing Clamp Bottom fot SP-23 with N&B | 16 | Nos | 290 ₹4,640 | 287 ₹4,592 Lowest | 289 ₹4,624 |
| 4.00 | Supply of Bracing Clamp Top fot SP-23 with N&B | 16 | Nos | 263 ₹4,208 | 260 ₹4,160 Lowest | 262 ₹4,192 |
| 5.00 | Supply of Stay Clamp For Sp 23 with N&B Double end | 23 | Nos | 325 ₹7,475 | 320 ₹7,360 Lowest | 322 ₹7,406 |
| 6.00 | Supply of AKM-16 Earth Wire Clamp SP-23 with N&B | 40 | Nos | 290 ₹11,600 | 286 ₹11,440 Lowest | 290 ₹11,600 |
| 7.00 | Guarding of LT/11KV Line | 1 | Spn | 2,500 ₹2,500 | 2,450 ₹2,450 Lowest | 2,470 ₹2,470 |
| 8.00 | Excavation of Pit for Pole | 19.25 | CBM | 255 ₹4,908.75 | 250 ₹4,812.5 Lowest | 255 ₹4,908.75 |
| 9.00 | Dismantling of SP-21/SP-23 Single pole | 4 | Nos | 1,000 ₹4,000 | 990 ₹3,960 Lowest | 995 ₹3,980 |
| 10.00 | Erection of 11 KV Stay Set | 66 | Job | 520 ₹34,320 | 500 ₹33,000 Lowest | 503 ₹33,198 |
Tender Value
₹3.4 L
EMD Value
₹13,500
Closing Date
16 Apr 2025, 3:00 pmClosed
EE, EDD Almora
Laxmeshwar, Almora
Repairing of 11 KV Line of Jageshwar Feeder from Sokhiyathal to Boda with supply of decentralised material under EDD Almora
2025_UPCL9_81938_1
66/2024-25/EDD(A)
Open Tender
Electrical Works
Item Wise
365 days
EDD Almora
As per tender document
2 documents required · 2 mandatory
₹295
EE, EDD Almora
₹13,500
27 Aug 2025
25 Mar 2025
17 Apr 2025
1 Apr 2025
16 Apr 2025
1 Apr 2025
Amount
Supply of Top Channel Holding Clamp for SP-23 Pole
Supply of Stay Clmap S/E for SP-23 with N&B
Supply of Bracing Clamp Bottom fot SP-23 with N&B
Supply of Bracing Clamp Top fot SP-23 with N&B
Supply of Stay Clamp For Sp 23 with N&B Double end
Supply of AKM-16 Earth Wire Clamp SP-23 with N&B
Guarding of LT/11KV Line
Excavation of Pit for Pole
Dismantling of SP-21/SP-23 Single pole
Erection of 11 KV Stay Set
Grouting of Pole
Grouting of Stay Set
Erection of Earthing Rod
Erection of Single SP-23 Pole
Cartage of Petty Material, 51-70 Km
Back Cartage of Petty Material, 71-100 KM
Erection of SP-23 Double Pole
Fabrication of Steel
Headload Cartage SP-21/23 Pole (1-3KM)
Laying of 3P 4W LT Line (Rabbit)
Dismantling of 11 KV Line (Rabbit)
Cartage SP-21/23 Pole, 51-70 KM
Muffing of Pole
Headload Cartahe of Material (1-3 Km)
Spreading, Stringing, Sagging Earth Wire
GURUKRIPA ENGINEERS AND CONTRACTORS (BID ID -373999)
MAA JAGDAMBA TRADERS (BID ID -374573)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .