Loading…
Loading…
Tender Value
₹20.0 L
EMD Value
₹20,000
Closing Date
1 Sept 2026, 6:00 pm3d left
Dy.Minicipal Commissioner - West Zone
Construction of khambhati kuva in different places at Stadium ward in west zone (ARC-1). (Re-Tender)
337871
2/26-27 (T.N.35)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹20,000
22 Aug 2026
22 Aug 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
2. Tender Estimated Cost
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (Rs.20,000.00)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.900.00
6. Time-Limit 12 months (excluding monsoon)
7. Validity Period 120 Days
8 Eligibility Criteria Register “E-1” class in PWD in Govt. R&B/CPWD/AMC or
equivalent registration with any other state Govt. or
(i) Last Date of Submission of the
a) In Sealed cover in duplicate copies by Registered Post A.D,or by
(ii) Mode of Sending Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only. It
Schedule of Quantities and Rates shall not be submitted Physically.
10 Date of Opening Dt 02-09-2026 , 15:00 PM
Submission of EMD. Tender fee and other Documents during office hours:
Place of Submission & Opening of
11. On Dt.02-09-2026 &12:00 pm West Zone, 2nd Floor, A.M. Office, Dr.
Tender Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
12 Penalty Due to Delay of work
Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
13 Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or major
of part thereof of any amount, the contractor shall be bound to start the
Time permitted to start parts of
14 works within 48 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation as
above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500
per day (for tenders amounting above 10 Lakhs and upto 30 Lakhs), (3)
Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make contractor
responsible to be black listed unless and otherwise justified properly in
writing / binding within 15 days of last notice of
The staff of the contractor shall wear safety jackets,
hoes, helmets etc. while on duty and any violation will attract
fine of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out
he works without proper precautions/safety measures as
equired will attract a fine of Rs. 5,000/- for each incident.
16 Defect &Liability Period The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case
of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards
the expenses, if any, Incurred by him in rectification, removal or re-
execution. The Defects Liability period shall be as under(a) for all
works costing upto Rs. 50,000 ( amount put to tender), the period
shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the
certified date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period
shall be 12 months from the certified date of completion which
should include one monsoon.
(d) For building works, the period specified in (a), (b) or (c) above
OR elapse of monsoon period following the certified date of
completion, whichever is later. For the purpose of deciding the
monsoon period, the 30th September may be treated as the last
17 Time permitted to start parts of Whenever a work is allotted by Engineering staff, whether minor
work or major of part thereof of any amount, the contractor shall be
bound to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in 48 hours of
intimation as above by contractor the contractor shall be levied
penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above
Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by contractor
shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of
last notice of penalty.
18 Compensation for Delay 10% of Remaining work (As per Circular)
19 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part
Of Tender And The Same As to be Attached Along With The Tender
20 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
21 GST GST will be paid extra by AMC/Authority at prevailing rate to the
22 Contractor has to provide more than one number of gangs as per the works alloted and in case of non
provinding of gangs and machinery at all sites at given time shall be treated as delayed by contractor and
penalty shall be levied on per day delay as mentioned below (the amount shall be as instructed earlier
based on the tender amount)
23 Paripatra no.-92,dt.20.01.2025 excavation ,barricating etc. SOP to follow up by contractor.
Contractor's Sign Addl.C.E.(west zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (WEST
ZONE)TENDER FORM
Name of Work :- Construction of khambhati kuva in different places at Stadium
ward in west zone (ARC-1). (Re-Tender)
Sr.no Qty. Item Rate per Amount
Extra rate over item of excavation of earth for excavation of
asphalt pavement/RCC of thickness up to 0.20 meter
1 including demolishing the asphalt carpet,metal,soiling
/cutting reinforcement etc.comp. with stacking the material
as directed. (based on previously approved rate by CE sir
a 50 up to 0.20 meter thickness (By Manual) 71.42 Smt
Up to 0.30 meter (By any type of Breaker Machine or
b 280 R.C.C.Cutter machine including cost of operator, fuel, & 178.57 Smt
transportation etc complete.
0.30 meter & above (By any type of Breaker Machine or
c 100 R.C.C.Cutter machine including cost of operator, fuel, & 312.50 Smt
transportation etc complete.
Refilling the pipeline trencheds incl. ramming, watering,
2 consolodating desposal of surplus stuff as directed within a
radius of 3 km. (GWSSB SOR 2021-22)
300 Refilling as directed 22.00 Cmt
--do-- with selected soil brought from outside including all
0 lead 175.00 Cmt
Conveyance charge of earth,lime,murrum, building
rubbish,manual garbage,sludge ,excavated rock,fly ash,
3 900 aggregate of any kind etc. comp. up to 5Km. lead (SOR 2015- 125.33 Cmt
16, P-589 - Item code- 3.2.1)
Providing and supplying ISI Standard RCC pipes (of sulphate
resisting Cement )in standard lengths of following class and
diameter suitable for rubber ring joints (socket and spigot)
including all taxes,insurance, transportation,treight
charges,octroi,inspection charges, loading,unloading,
conveyance to departmental stores, stacking etc. complete
(GWSSB SOR 2021-22)
Class NP3 Test pressure 0.7 Kg/Sq.Cm
160 300 mm dia 755.00 Rmt
30 450 mm dia 1361.00 Rmt
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of
following diameters in proper position , grade and alignment
at all level as directed by Engineer-in- charge including
conveyance from stone to site of work, labour giving
hydraulic testing as per ISI code. (GWSSB SOR 2021-22)
160 300 mm dia 119.00 Rmt
30 450 mm dia 171.00 Rmt
Constructing Slab Type M.H. Chamber Of The Following Size
Including Excavation, Refilling, Brick Bats Cement Concrete
(1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
10 C.M., finished 15 mm thick cement plaster inside &
outside (Only for shaft) In Cm 1:3, Finishing With Cement
Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C
6 At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In
Cc1:1.5:3 of thickness 15 C.M.,Including Cantering &
Reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm
dia.)But Excluding The Cost Of Manhole Seat Cover
Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear, M.H.
length should be parallel to the flow) (Based on Drainage
1.00 to 2.00 meter depth, (Slab at Ground level) (for pipe dia
2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.)
2 (for pipe dia <=300 mm) 11395.54 No
Constructing Slab type M.H. Chamber of the following size
including excavation, refilling, brick bats cement concrete
(1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
10 C.M., finished 15 mm thick cement plaster inside &
outside (Only for shaft) in CM 1:3, finishing with cement
slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c
at 35 cm staggered in masonary CM 1:5, RCC Slab in CC
7 1:1.5:3 of thickness 23 C.M., including Cantering &
reinforcement (double jalli at 15 C.M. c/c bothway 12 mm
dia.) but excluding the cost of Manhole seat cover
etc..completed. of Size 1.00 X 1.40 meter (Inside Clear,
M.H.length should be parallel to the flow, for pipe dia <=
mm) (Based on Drainage SOR 2009-10)
2 1.00 to 2.00 meter depth, (Slab at Ground level) 10177.68 No
2 2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.) 19258.04 No
Making connection to the ex. M.H.in running sewer incl.
Dewatering and other required machinery etc. of following
8 dia pipes at any convenient time. All damaged work shall be
well repaired as per instructions. etc..complete. (Based on
Drainage SOR 2009-10)
10 a.150 mm to 300 mm dia. 1339.28 No
Cutting the pipes of following dia coming in the new M.H.in
running sewer including cutting bars, including removing
debris /silt from the M.H. and carting at a suitable distance
9 etc..complete as directed. No payment for M.H. work will be
made until pipe is not cut completely in all respect. (Based
on Drainage SOR 2009-10)
10 150 mm to 300 mm dia. 1133.92 No
Constructing Bombay Pattern Type Catch Pit of size 0.60 x
0.60 depth up to 1 mt including excavation, B.B.C.C. (1:5:10),
23 cms thick brick maso. wall in the prop. of CM (1:6) with
10 10 mm thick IPS flooring in the prop M15 at bottom and 15 3125.00 No
mm thick cement plaster inside the catch pit in the
proportion of CM (1:3) with out jali etc. comp. as directed.
(As per R.A. Based on Building SOR 2015-16)
CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x
11 10 600mm clear opening etc. comp. As directed by engineer in 1383.92 No
charge. (Based on Central Store Rate)
Structural steel work riveted, bolted or welded in built up for
all type sections, inframed work, including cutting, hoisting,
fixingin positionand applying apriming
coat of approved steel primer all complete as per the
structural designsand directions of Engineer in charge.
Providing Fabricating and fixing MS Grating Jali for
Machinehole having 65 X 65 X 8 mm MS Angle with
Horizontal and Vertical 65 X 10 mm MS Flate with 50 mm
13 2 Spacing at equal distance. Work includes with oilpaint and 13000.00 No.
Transportation on site work comp. as per Instruction by
Engg. incharge.
Raising of Existing manhole item includes,cutting of existing
road surround by Manhole by diamond cutter machine
dismantling of road in confined area by breaker machine and
14 2 carting of dismantal material.item also included necessarey 6830.35 No.
brick work to raise the manhole at road level in CM 1:3 item
also included fixing of Manhole frame at exact
road level by using MaserEmaco S 488 trowable fibre
reinforced thixotropic repair mortal material Laying of
concrete made form Master Emaco 5 346 flowable micro
concrete material in desired thickness and laying of hot
bitumanous material in Upper layer and compaction of hot
bitumanious material by palte compactor machine .Rate also
included necessary plaster at inside of manhole in CM
1:3 in 20 MM thickness on raised brickwork.
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the excavated
stuff upto 50 Meter lead.(B) Dense or Hard soil( R&B
15 240.00 Ahmedabad city SOR 2023-24 item code:-4B001) 259.14 Cum
Excavation for foundation for depth from 1.5 m to 3.0 m
ncluding sorting out and stacking of useful materials and
16 240.00 disposing off the excavated stuff upto 50 Meter lead.(B) 280.05 Cum
Dense or Hard soil( R&B Ahmedabad city SOR 2023-24
itemcode:-04B002B)
Excavation for foundation for depth from 3.0 m to 5.0 m
including sorting out and stacking of useful materials and
17 200.00 disposing off the excavated stuff upto 50 Meter lead.(B) 300.96 Cum
Dense or Hard soil( R&B Ahmedabad city SOR 2023-24 item
Extra for additional depth more than 5.0 m forexcavation for
foundation including sorting out andstacking of useful
materials and disposing off theexcavated stuff upto 50 m
lead.(B) Dense or Hard soil( R&B Ahmedabad city SOR 20.91 Cum
2023-24 item code:-04004B pg 47)
Filling available excavated earth (excluding rock) in trenches,
plinth, sides of foundations etc. in layers not exceeding
cm. in depth, consolidating each deposited layer by ramming
19 200.00 and watering etc. complete. (Building SOR 2021- 129.10 Cum
22, Item Code 4006, 4.12)
Providing and laying cement concrete 1:4:8 (1- Cement:
Coarse aggregate: 8-Hand broken stone aggregates 40 mm
nominal size) and curing complete excluding formwork in (A)
Foundation and plinth. (Building SOR 2023-24, Item Code
Providing and laying controlled cement concrete M- 200 for
curing complete excluding cost of formwork and
reinforcement for reinforced concrete work in (C)Slabs,
landing, shelves, Balconies, Weather sheds, lintels, beams,
girders, and cantilevers, up to floor two level (Building SOR
Providing TMT Bar FE500D reinforcement for R.C.C. work
including bending, binding and placing in position complete
22 1200.00 upto floor two level. (Building SOR 2023-24, Item Code 75.46 KG
Providing Formwork of ordinary timber planking so as to give
a rough finish including centering, shuttering, strutting and
roping etc. Height of propping and centering elowupporting
floor to celling not exceeding 4 Mt. and removal of the same
for in-situ reinforced concrete and plain concrete work in (B)
Flat surfaces such as soffits of slabs, landings and like(1)
Floor etc. upto 200 mm thickness.
(Bullding SOR 2023-24, Item Code 09001B1A, 9.8)
Providing Formwork of ordinary timber planking so as to give
a rough finish including centering, shuttering, strutting and
proping etc. Height of propping and centering below
supporting floor to ceiling not exceeding 4 Mt. and removal
24 200.00 of the same for in-situ reinforced concrete and plain 259.88 Smt
concrete work in (G) Sides and soffits of beam, haunchings,
cantilevers, girders, bracings, and lintels not exceeding
Mts. in depth. (Building SOR 2021-22, Item Code 09001H2A,
Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg/Sq. cm. in foundations
and plinth in cement mortar 1:6 (1 cement :6 fine sand) for
25 200.00 conventional type bricks. (Building SOR 2023-24, Item Code 3981.21 Cum
Providing F.R.C. Mh Seat Cover Incl. Carting To The Work Site
26 Etc. Comp. Directed.
(C) Frc Medium Duty Chamber Seat Cover (Frc) Cover 706 X
556 X 50 Mm Rectangular Cover Frame Size 600 X 450 Mm
10.00 Clear Opening Outer Size 816 X 666 X 100 Mm 990.00 Nos
Providing and filling Pre filter a mixture of 20 mm - 40 mm
gravels surrounding the precast filter systemsystem, {SOR
27 2.00 GWSSB (Electro Mechanical) (2022-23) Section "A"annexure- 2029 Cmt
Providing, supplying & fixing to wall ceiling and floor 6.0 kg.
F/Cm2 working pressure polythelene pipes of the following
outside dia. Low density. Complete with special flange
empression type fittings. Wall clips etc. incl. making good
the wall ceilling and floor.(140 mmDia)
Contractor's Sign Addl.C.E.
Mobil No: - (west zone)
AMCFinancedept.circular No –41,Dt.08/02/2022
(A) GuaranteesissuedbyfollowingbankswillbeacceptedasSD/EMDonpermanentbasis.
(1) AllNationalizedBanks
(B) GuaranteesissuedbyfollowingbankswillbeacceptedasSD/EMDfortheperioduptoMarch-
31,2022.Thevaliditycut-
offdateintheGRiswithrespecttothedateofissueofBankGuaranteeirrespectiveofthedateoftermin
ationofBankGuarantee.GuaranteesissuedorAuthorizedbyAhmedabadBranchOnly.
(1) CommercialBanks:
(5) KotakMahindraBank
(6) IndudIndbank
(8) TamilnaduMercantileBank
(9) UjjivanSmallFinancebank
(10) AUSmallFinanceBank
(11) FedaralBankBank
(12) EquitasSmallFinancebank
(13) BandhanBank
(14) StandardCharteredBank
(2) Co-Operative&RuralBanksofGujarat
1. TheMehsanaUrbanCo-operativeBankLtd
2. TheAhmedabadMercantileCo-OperativeBankLtd
3. NutannagrikSahakariBankLtd
4. TheKalupurCommericalCo-operativeBankLtd
5. RajkotNagarikSahakariBankLimited
6. TheGujaratStateCo-OperativeBank
8. SaurashtraGraminBank
SealandSignatureoftheBidder AddlCityEngineer
TERMS&CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS
(ITB)(B)GENERALTERMS&CONDITIONS(C)FINACI
ALTERMS&CONDITIONS
(D)MAINCONDITION/FETURESOFTHEWORK
AHMEDABADMUNICIPALCORPORATIONTERMS&CONDITION
(A)INSTRUCTIONSTOBIDDERS(ITB)
1. ProcedureforSubmissionofTender
a). TheBiddershouldquotethepricebidintenderformbeforescheduletimeTenderDocument,tenderfee
&EMD(Draft/DD)andallotherenclosuresasaskedintender.
b).The bidder shall submit the following Tender documents physically in hard copy in
twoseparate envelope (marked as “original” and other marked as “Duplicate”) in schedule
timeby RPAD/ Speed Post/ Hand Delivery in duplicate. The Bid envelopes shall be
marked asfollows:-
TenderDocument
Registrationcertificateofclass
c).TheenvelopeshallbeaddressedtotheEmployeratthefollowingaddress:
Asst.Manager(Admin)WestZone,
2ndFloor,Dr.RamanbhaiPatelBhavan,Usmanpura,A
hmedabadMunicipalCorporation,
W.Z.Office,Ahmedabad-380013
d).Bearthefollowingidentification:
“TOBEOPENEDONLYINPRESENCEOFTHEEVALUATIONCOMMITTEE”
e).Indicatethenameandaddressofthebidder.
Iftheouterenvelopeisnotsealedandmarkedasabove,theEmployerwillassumenoresponsibilityforthemisplacemen
torprematureopeningofthebid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to beinitialed
g)AllTheBidDocumentEssentiallyNeedstobeProperlybinded/steppled
2. AssessmentofSubmission
The Employer will open the technical bid of physically submitted document of all the
bidsreceived for the package (except those received late) containing the sealed Tender
volumeandother enclosuresthenannounce thenames
ofbiddersinthepresenceofbiddersortheirrepresentativeswhochoosetoattendonthedateandtime
mentionedintheNITIntheeventofspecified dateofbidopening being declared as aholiday for the
Employer,theTenderwillbeopenedattheappointedtimeandlocationonthenextworkingday.
In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first.
TheEmployer at the opening will announce bidder’s names, , the presence/or absence of
EMD,the amount andvalidity ofEMD furnishedwith eachbid,isvalidregistration andsuchother
details,astheEmployermayconsiderappropriate.
TheEmployerwilldeterminewhetherthebidisaccompaniedbytherequiredEMD.
IftheEMDfurnisheddoesnotconformtotheamountandvalidityperiodasspecifiedintheInvitationfor
Bid and has not been furnished in theform,the bid shallbe rejected bytheEmployerasnon-
responsiveandtheTendervolumewillbereturnedtothebidder.
SubjecttoconfirmationoftheEMDbytheissuingbank,theTendervolumeaccompaniedwithvali
dEMDwillbetakenupforfurtherevaluation.Incase,theBankdoes not confirmtheEMD, thebid shall
be rejected as non-responsive and no furtherevaluation carried out.
Thetendervolumewillfurtherbeexaminedtodeterminewhetherthebidhasbeenproperlysigne
d,meetstheeligibilityandqualificationcriteria,hastherequiredavailablebid capacity, is
accompanied by the requisite certificates, undertaking and other
relevantinformationspecifiedinthebiddocumentsandissubstantiallyresponsivetotherequirement
of the bidding documents and provides any clarification for ascertaining
thecorrectnessoftheinformation/details.
If theTender volumeisnot substantially responsive,it will berejectedby
theEmployerandwillnotsubsequentlybemaderesponsivebycorrectionormodificationorwithdraw
alofthenonconformingdeviationorreservation.
3. EvaluationandComparisonofTendervolume
TheEmployerwillevaluateandcompareonlythoseTendervolumeswhicharedetermined to be
substantially responsivein accordance with Clause 2 and qualified
forawardofContractinaccordancewithClause5(GeneralTermsandCondition).
4. ProcedureforTenderOpening
Received copies of tender in physical form with in schedule time, will be open on scheduledate and
time. In the event of specified date of bid opening being declared bidders
whoqualifythecriteriathenbidderbidwillbeconsideredforopeningofpricebid.
The Employer will award the Contract to the bidder whose bid has been determined to
besubstantiallyresponsivetothebiddingdocumentsandwhohasofferedthelowestEvaluated Bid
Price, provided that such bidder has been determined to be (i) eligible
inaccordancewiththeprovisionsofClause3(GeneralTermsandCondition);and(ii)qualifiedinaccorda
ncewiththeprovisionsofClause5(GeneralTermsandCondition).
6. NotificationofAward
Prior to expiration of the period of bid validity prescribed by the Employer, the
Employerwillnotifythesuccessfulbidderbycable/faxandconfirmedbyregisteredletterthathisbid
has been accepted. This letter shall name the sum which the Employer will pay theContractor in
consideration of the execution, completion and maintenance of the Works bytheContractor
asprescribedbytheContract.
ThenotificationofawardwillconstitutetheformationoftheContract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular
afterreceiving letterofIndent.Timelimitofworkwill commencefromthedateof
issueofworkorder.
8. ClarificationofBids
To assist in the examination, evaluation and comparison of bids, the Employer may, at
hisdiscretion,askanybidderforauthenticationthecorrectnessoftheinformation/detailsfurnishedb
yhiminhisbid.SuchrequestbytheEmployerandtheresponsebybiddershallbeinwritingorbycable/fa
Subject to aboveclause,nobiddersshall contact theEmployer onany matter relating
tohisbidfromthetimeofbidopeningtothetimecontractisawarded.
Any effort by the bidder to influence the Employer in the Employer’s bid evaluation,
bidcomparisonorcontractawarddecisionsmayresultintherejectionofhisbid.
Information relating to the examination,clarification,evaluation and comparison ofbidsand
recommendations for the award of a contract shall not be disclosed to bidders or anyother
persons not officially concerned with such process until the award to the
successfulbidderhasbeenannounced.AnyeffortbyabiddertoinfluencetheEmployer'sprocessingof
bidsor awarddecisionsmayresultintherejectionofhisbid.
Thebidder is advised to visit and examine theSite of Works and its
surroundingsandobtainforitselfonitsownresponsibilityallinformationthatmaybenecessaryforpre
paring the bid and entering into a contract for construction of the Works. The costs
ofvisitingtheSiteshallbeatthebidder’sownexpense.
ThebidderandanyofitspersonneloragentswillbegrantedpermissionbytheEmployertoenter
itspremisesandlandsfor thepurpose ofsuchinspection,but only upontheexpress condition
that the bidder, its personnel and agents, will release and indemnify theEmployer and its
personnel and agents from and against all liability in respect thereof
andwillberesponsiblefordeathorpersonalinjury,lossofordamagetopropertyandanyotherloss
,damage,costsandexpensesincurredasaresultoftheinspection.
CheklistforsubmitionofTechnicalBid.
validRegistrationCopy.
AHMEDABADMUNICIPALCORPORATIONTERMS&CONDITION
(C) GENERALTERMS & CONDITIONS
The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites
Tenderdocument for the construction of works (as definedin these documents,hereinafter
referred toas"theWorks") detailedinthetablegivenintheIFB.
TheWorksconsistof:“asAbove"
1.1 TheexpenditureontheseWorkswillbemetbyAHMEDABADMUNICIPALCORPORATION.
3. EligibleBidders
Thisinvitationforbidsisopentobidderswhohasnecessarybidcapacityandwhomeetthefollowingreq
Abiddershallnotbeunderadeclarationofineligibilityforcorruptorfraudulentpractice.
Thebiddersshallhavearegistrationwith StatePWD,and/orCPWD for "D" classand or
equivalent.If contractor is not registered with AMCin the relevantclass,onaward of
contract he shall be required to register himself with AMC within 3 month'stime.
BiddersshallprovidesuchevidenceoftheircontinuedeligibilitysatisfactorytotheEmployer,as the Employer
shall reasonably request.Subject to Submition of Succsesful Submition as perClause–IIofR.&B.
4. EligibleMaterial,EquipmentandServices
At the Employer'srequest,thebidder having offeredthelowest evaluated financialbidmay be
required to provide evidence of the origin of materials, equipment, and services to
thesatisfaction oftheEmployer.
For purposes of Sub Clause 4.1, "origin" means the place where the materials are
mined,grown, produced or manufactured; similarly for equipments and from where the
services areprovided.
5. QualificationoftheBidder
TobequalifiedforawardofContract,biddersshall:
a)Submitawrittenpowerofattorney authorizing thesignatoryofthebidto commit thebidder; and
General information
Allindividual firms mustcompletetheinformation in this form.Nationality information
shallbeprovidedforallowner(s)orapplicant(s)thatarepartnershiporindividuallyownedfirms.
2 HeadofficeaddressWithContactno.:
3 Localofficeaddress(ifany)WithContactno.:
……………………………………………………………………………………4Telephone/ContactWithname:
5 E-mailaddress:
6 Placeofincorporation/registration:
7 Yearofincorporation/registration:
Additionalinformationregardinglitigation,debarment,arbitration,etc.
AuthorisedSignetureBidder
Disqualification
EventhoughtheBidders may meet theabovecriteria,they are subject to bedisqualified
foranyofthefollowingreasons:
a) Misleadingorfalserepresentationintheforms,statementsandattachmentssubmittedandinclud
ed in document.
b) Record ofpoor performance such as abandoning the work, rescinding of contract
forwhichthe reasons are attributable to the non-performance of the contractor, consistent
history oflitigationawardedagainsttheapplicantorfinancialfailureduetobankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing
d) Thebidderfill(tender)inpercentagerateaboveorbelowandtotalamount(bothinfiguresandwords
)onlyinE-Tender(Online)NottofillinhardcopyofTenderdocuments
Debarment/Blacklisting
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for
theirmisleadingorfalserepresentationsintheformsstatementsetc.fortheperiodtobedecidedbytheEmployer
6. OneBidperBidder
Each bidder shall submitonly onebidpercontractpackage either by himselfor as apartner in
a joint venture. A bidder who submits or participates in more than one bid for
acontractpackagewillbedisqualified.
7. BiddingDocuments
Thebidder isexpectedtoexaminecarefully thecontentsofalltheabovebiddocuments.Failures to comply with
the requirements of bid documents will be at the bidder's own risk.Pursuant to Clause 16, bids which are
not substantially responsive to the requirements of thebidding documentswillberejected.
8. LanguageofBid
Thebid,andallcorrespondence anddocuments relatedto thebidexchangedbetweenthebidder and the
Employer shall be written in the English language. Supporting documents
andprintedliteraturefurnishedbythebiddermaybeinanotherlanguageprovidedtheyareaccompanied by an
accurate translation ofthe relevant passages in the English
language,inwhichcase,forpurposesofinterpretationofthebid,theEnglishtranslationshallprevail.
Unless stated otherwisein thebidding documents, the Contract shall be for the
wholeworksasdescribedinbiddingdocuments,basedonthepercentagerateamountintheBillofQua
ntitiessubmittedonlinebythebidder.
The bidder shall fill (tender) in percentage rate above or below and total amount (both
The bidder shall fill (tender) in percentage rate above or below and total amount (both
infiguresandwords)foroverallitemsoftheWorksprovidedintheBillofQuantities
10. BidValidity
Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for
bidsubmissionspecified in Clause.TheEmployeras non-responsiveshall reject abid
validforashorterperiod.
Inexceptionalcircumstances,priortoexpiryoftheoriginalbidvalidityperiod,theEmployermayr
equestthebidderstoextendtheperiodofvalidityforaspecifiedadditionalperiod.Therequestan
dtheresponsestheretoshallbemadeinwritingorbyfax. A bidder may refuse the request
without forfeiting his bidder agreeing to the requestwill not be required or permitted to
modify his bid but will be required to extend thevalidityofhisBidSecurity
fortheperiodoftheextension,andincompliancewithClause2(FinancialTerms&Conditions) in
11. FormatandSigningofBid
The bidder shall prepare two copies of the documents comprising the bid as described
inInstructionsto Bidders.
Thebid shall betypedor written inindelibleink andshall besignedby a person
orpersonsdulyauthorizedtosignonbehalfofthebidder.
The bid shall contain no alterations, omissions or additions, except those to comply
withinstructionsissuedbytheEmployer,orasnecessarytocorrecterrorsmadebythebidder,inw
hichcasethepersonorpersonssigningthebidshallinitialallsuchcorrections.
Allwitnessesandsuretiesshallbepersonsofstatusandprobityandtheirfullnames,Occupat
ionsandaddressesshallbeprintedbelowtheirsignatures.
12. DeadlineforSubmissionofBids
BidsmustbereceivedbytheEmployerattheaddressspecifiedabovenotlaterthanthetimeanddatespecifiedinth
Any bid received by the Employer after the deadline for submission of bids will be returnedunopened to
14. SigningofAgreement
AtthesametimethattheEmployernotifiesthesuccessfulbidderthathisbidhasbeenaccepted, the Employer
will direct him to submit the Performance Security andattend
theEmployer'sofficeonadatedeterminedbytheEmployerforsigningtheFormofAgreement.
15. Theselectionprocesswilllayhighemphasisontheabilityandcompetencyofcontractorstodohigh
qualityworkwithinthegiventimeschedule.
16. The onus of providing, all necessary company / project related information, in
appropriatemanner and medium, so as to demonstrate the competency of the bidder and to
allow properevaluation,willrestentirelyontheBidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry
oforiginalandextendedtimelimit.
18. LegalCondition:-
CorruptorFraudulentPractices
TheEmployerwillrejectaproposalforawardifhedeterminesthattheBidderrecommendedfor
awardhasengagedincorruptor fraudulentpractices incompeting forthecontract inquestion.
TheEmployer will declarethefirm ineligible,either indefinitelyor for a stated period of time, to be
awarded a contract by AHMEDABAD
MUNICIPALCORPORATIONifitatanytimedeterminesthatthefirmhasengagedincorruptorfraudulentprac
ticesincompetingforthecontract,orduringexecution.
“corruptpractice”meansbehavioronthepartofofficialsinthepublicorprivatesectorsbywhic
htheyimproperlyandunlawfullyenrichthemselvesand/orthosecloseto them,or
induceothers to do so,by misusing theposition in which they areplaced,and it includes
the offering,giving,receiving, or soliciting of anythingof value
toinfluencetheactionofanysuchofficialintheprocurementprocessorincontractexecution;
“fraudulentpractice”meansamisrepresentationoffactsinordertoinfluenceaProcurement
process or theexecutionofacontract tothedetriment
oftheBorrower,andincludescollusivepracticeamongbidders(priortoorafterbidsubmission)
designed to establish bid prices at artificial non-competitive levels and to deprive
theBorrowerofthebenefitsoffreeandopencompetition.
MunicipalCommissionerreservestherightstoreduce/increasethescopeofworkandcontractwit
houtassigninganyreasonthereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to
materialmisrepresentation or provided fraudulent information / statement, the said Bidder
will beliablefordisqualification/rejectionatanystage.
Prooffor fulfillmentof eligibility criteriashould besubmitted along withTendervolume.If the
Tender volume is submitted without valid documents and without proof of
eligibilitycriteriaitwillberejected.
ThosewhodonotmeetwiththeeligibilitycriterianeednotsubmittheTenderdocument.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in
anyrespectorareconditionaltenders,willberejected.
ContractorshallberesponsibletoobeyallLabourLaws,EnvironmentalandSafetyLaws.(the
existing laws as well as framed from time to time). Any penalties laid due
toviolationofsuchlawsshallbedirectlydeductedfromthecontractor'soutstanding.
19. AdministrativeConditions:-
SafetyandSignage
Contractor has toarrange for the completesafety ofthepersons working for project, usersof the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fibercones,
traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site.Necessary
florescent marking on traffic signs to be provided so that it should be visible
atnight.Duringnightworkinghourssafetyinchargepersonnelshallbeprovidedwithflorescent
jackets. This shall be Provided at no extra cost by the bidder under
attachéwithspecifiedinthetenderdocumentsunderpayableiteme.
LiaisonwithlocalauthorityforelectricalconnectionsfortheAMC
Thecontractorisresponsibleforliaisonwithlocalauthorityforchangeinsupplyconnectionornewco
nnectiononbehalfofAMC.ItincludesfillingthenecessaryapplicationtopowerSupplyCompany,fo
llowupandgettingthesupply,fillingthenecessary test reports to the power supply company. All
official fees including
securitydepositsandotherexpensesshallbeofinitiallypaidbythecontractor.AMCmaysupportto
get the temporary connection and may at its diseretien get the same converted
topermanent connection at thesameofAMC if desired do,and contractorshallas noextra
cost support the same. In this case AMC my be as the remaining cost subject
20:-CONTINGENTFEE:
The Contractor warrants that he has not employed any person to solicit or secure
thecontractuponanyagreementfora commission,percentage,brokerage orcontingentfee.
Breach of this warranty shall give the Municipal Commissioner the right to cancelthe
contract or to take any other measure as the Municipal Commissioner may deem
fit.Thewarranty doesnotapply tocommissionspayableby
thecontractortoestablishcommercialorselling agentforthepurposeofsecuringbusiness.
No officer, employer of theMunicipal Corporation beadmitted to any share or part
ofthiscontractortoanybenefitthatmayrisetherefrom.
21:-OVERPAYMENTANDUNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises
outoforunderthisContractagainstthecontractorthesamemaybedeductedbytheMunicipalCorporation
fromanysumthendueorwhichatanytimethereaftermaybecome due to the contractor under this
contract and failing that under anyother contractwith the Municipal Corporation or from any sum
due to the contractor with the MunicipalCorporation (which may be available with
MunicipalCorporation), or from his
retentionmoney,orheshallpaytheclaimondemand.TheMunicipalCorporationreservestherighttocarry
outpostpaymentauditandtechnicalexaminationofthefinalbillincludingallsupportingvouchers,abstrac
TheMunicipalCorporation further reserves the rightto enforcerecovery ofany overpayment when
detected not withstanding the fact that the amount of the final bill may beincludedby
If as a result of such audit and technical examination any over payment isdiscovered inrespectof
any work doneby theContractor or alleged to have beendone by himunderthecontract,it shall
berecovered by theMunicipalCorporation fromthe contractor byway of all the means prescribed
above or ifany under payment is discovered by theMunicipal Corporation, any amount due to the
contractor under this contract or
underpaymentmaybeadjustedagainstanyamountthendueorwhichmayatanytimethereafterbecomed
uebeforepaymentismadetothecontractorfromhimtotheMunicipalCorporationonanyothercontractac
countwhatsoever.
If, at any time, there should be evidence of any lien or claim for which ownermight havebecome
liable and which is chargeable to the contractor, the owner shall have the right toretain out of
anypayment then due or thereafter tobecome due an amount sufficient tocompletely indemnify
theowner againstsuchlien or claimor if suchlienor claimbevalid theowner may be orbecomedueand
payableto thecontractor.Ifany lien orclaimsremaining,unsettledafter all payments
aremade,thecontractorshallrefundorpay to theowner all money that thelatter may be compelled to
payin discharging suchlienorclaimincludingallcostandreasonableexpenses.
Contractorshallnotsub-lettheworkwithoutpermissionoftheauthority.
JointventureandsubcontractingshallnotbeallowedunderthistenderADDEND
Addendumorcorrigendumconveyinganychangeorcorrectioninrespectoftheworkshallformthepartofthecon
tractdocuments.Thefullconsiderationshallbegiventosuchaddendumorcorrigendumbeforesubmissionoften
derdulyfilledinbythecontractor.Therefore,thecontractorsshallhavetokindlyreferthetenderforsuchaddendu
morcorrigendumpublishedbyAMCthroughitswebsitewww.amc.nprocure.com&www.nprocure.com48
hourspriorto thedeadlineofsubmissionofthetender.Tenderersshall verify the number of addendum issued
and enclose the same with the tender documents
,failingwhichthetendersshallbeliableforrejectionandnoanycomplaintinrespecttothisshallbeentertainedun
deranycircumstances.
SealandSignatureoftheBidder
Addl.CityEngineerD
ate: (WestZone)
AHMEDABADMUNICIPALCORPORATIONTE
(C)FINACIALCONDITION
1. CostandCurrenciesofBidding
ThebiddershallbearallcostsassociatedwiththepreparationandsubmissionofhisbidandtheEmployerwillin
nocaseberesponsibleorliableforthosecosts.
CurrenciesofBidandPayment
TheratesandthepricesshallbequotedbythebidderentirelyinIndianRupees
Allpaymentsincludingadvances,ifany,shallbemadeinIndianRupees.
2. EarnestMoneyDeposit :-
Bank guarantees (and other instruments having fixed validity) issued as surety for the
bidshallbevalid for28daysbeyondthevalidity ofthebid.
TheEMDoftheunsuccessfulbidders,exceptforL1,L2andL3bidders,willbereturnedaspromptlya
sEarlyaspossibleasbutnotlaterthan28daysaftertheexpirationoftheperiodofbidvalidity.
The EMD of the successful bidder, along with second and third lowest tenders, will
bereturnedwhenthebidderhasfurnishedtherequiredperformancesecurityandsignedtheagreeme
EarnestMoneyDepositmaybeforfeited
a) ifthebidderwithdrawshisbidduringtheperiodofbidvalidity;
b) inthecaseofasuccessfulbidder,ifthebidderfailswithinthespecifiedtimelimitto
i) FurnishtherequiredPerformanceSecurityor
ii) SigntheAgreement.
3. (A)SecurityDeposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI)
thesuccessfulbiddershalldelivertotheEmployer,aInitialSecurityDepositShallbesubmitted asper C.E.
Circular.inthe formof aBankGuarantee/DD/Locle
MICRchequeforanamountequivalentto5%(fivepercent)oftheContractPrice.
Failure of the same shall make the contractor liable for any penalty as decided by AMC.
Atpresent a policy is framed by Audit department of AMC to charge 4% interest for the
balanceperiodanddiscontinuityperiod.
TheSecurity Depositto be provided by the successful bidder inthe form of
abankguaranteeasperformatshallbeissuedasperMemorendumofwork.
Retention@2%ofthevalueofworkdonewillbedeductedfromeachRAbill.Itwillbereleasedalongwit
hreleaseofpaymentofFinalBill.
4. ApprovedBank:-AsperAnnexer-I
5. Noadvanceformachineryormaterialswillbegiven.
6. Mobilizationadvancewillnotbegiven.
7. QuantitiesinB.O.Q.mayvaryuptoanyextentandcontractorshallnotclaimanyextrarateforthesam
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended
timelimit.&AsperAMCRule
9. Tax,DutiesonMaterials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT(exculding
GST)etc. on materialprocurementor any other component forthe works fromany
sourceshallbebornebythecontractors.
AsperconstructionworkswelfarecessAct–1996non-
refundableonepercentoftenderamountshallbedeductedagainstworkswelfarecess.
SealandSignatureoftheBidder
Addl.CityEngineerDat
Generalterms&conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or
equivalentregistration with any other stateGovt. or institutions. Copy of registration shouldbe
attachedwithtender document.Tenderer whowas not registredin AMC must be get registred in
panelofapprovedAMCcontractor.
2. AbookletofFORMB-1ofGujaratStateRoads&BuildingDepartment/WaterResources
Department with the correction slips made up to 15-08-1999 may be referred. (onlyEnglish
version) Clause No. -2 liquidated damages for delay shall be overrule by
A.M.C.’sM.C.circularno.-9 dt.18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed
/"approved"bytheEngineering incharge.
4. Wherever areferenceto any Indian standard appears in the specifications,it shall
betakentomeanasreferencetothelatesteditionofthesameofforceonthedateofagreement.
5. In"Modeofmeasurement"inthespecificationswhereveradisputearisesintheabsence of
specific mention for a particulars point / aspect, the same in the relevant
IndianStandardsshallbereferredto.
6. Allmeasurementandcomputations,unlessotherwisespecifiedshallbecarriedoutnearest
tothefollowinglimits:-
i) Length,widthanddepth,Height 0.01Meter
ii) Areas 0.01Sq.mts.
iii) Cubiccontents 0.01Cu.mts.
Inrecordingdimensionsofwork,thesequenceoflength,widthandheight(Depth)orthicknessshallbefollowed.
7. Definiteparticularscoveredintheitemsofwork,thoughnotmentionedorelucidateinitsspecif
icationsshallbedeemedtobeincludedtherein.
8. ApprovalofthesamplesofvariousmaterialsgivenbytheEngineerinchargeorAMC'sConsultan
tshallnotabsolvethecontractorfromtheresponsibilityofreplacingdefectivematerialsbroughtonsite
ormaterialsusedintheworkfounddefectiveatalaterdate.Thecontractorshallhavenoclaimtoanypay
mentorcompensationwhatsoeveronaccountofanysuchmaterialsbeingrejectedbytheEngineerinc
9. Thecontractor’sratefortheitemofworkshallbefortheworkcompletedinallrespect.
10. AllmaterialsincludingthoseofelectricalshallbegotapprovedbytheEngineerincharge/Archit
ectbeforeusingtheminthework.
11. Materials as andwhen rejected bytheEngineer
inchargeorAMC'sConsultantshallberemovedfromthesiteofworkwithin24hours.
12. Allworkshallbecarriedoutinamannerasperstandardengineeringpractice.
13. Alltools,templates,machineryandequipment forcorrect executionoftheworkaswell as for
checking lines, levels, alignment of the works & all precautionary measures
duringexecutionshallhavetobekeptinsufficientnumbersandingoodworkingconditionatthesiteoft
hework.Allexcavatedtrenchshallbekeptcoveredwithbarricadeandcautiontap.
14. SpecialmodesoftheconstructionnotadoptedingeneralEngineeringpractice,ifproposed to
be adopted by the contractor shall be considered only if the contractor providedsatisfactory
evidence that such special mode of construction and completion of work to therequired
strength and quality. Acceptance of the same by the Engineer in charge shall
nothowever,absolve the contractor from theresponsibility of any adverseeffect and
concordanceofadoptingthesameinthecourseofexactionorcompletionofthework.
15. The contractor shall be responsible for observing the rules and regulation imposed under
the"MinorMineralAct",andsuchotherlawsandrulesprescribedbytheGovernmentfromtimetotime.
16. All necessary safety measures and precautions (incl. those laid down in the
variousrelevant Indian Standard) shall be taken to engrave the safety ofmen, materials and
machineryontheworkandalso oftheworkitself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking
tothequantumofactualworkforwhichnoanyclaimshallbeentertainedbyA.M.C.
18. ContractorshallhavetoexecuteextraitemifrequiredorasperneedofAMC.
19. The work in general shall be carried out as per standard specifications of the
relevantitems to be executed & as per the instruction of Engineer in charge & as per the
guidance ofAMC'sConsultantforthisproject.
20. Thegeneralterms&conditionsofthecontractshallbeapplicable&shallbebindingonthe
contractor.The contract agreement shall have to be executed betweenAMC &
theagencytowhichworkis awardedfor execution.
21. ForTenderamountingbelow10lakhLOIshallbeissueswithin3daysafterreceivedofsanctione
dtenderandresolution.Within10dayscontractorhastosubmitSDandafterreciveing SD Work order
shall be issue to contractor and the time limit shall be start from
thedateofissueofthewrittenworkordertothecontractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received
ofsanctionedtenderandresolution.Within15dayscontractorhastosubmitSDandafterreciveing SD work
order shall be issue to contractor and the timelimit shall be start from
thedateofissueofthewrittenworkordertothecontractor.
Security Deposit of5% ofsanctionedtender amountshallbedepositedby pay order/demand draft /
cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractorshallhaveto sign
contractpaper with AMC.The contractor shall be fined 4% of
interestperyearfordelayinsubmissionofS.Dandshallbedeductedfromcontractor’sbill.
22. In case of any ambiguity in specifications mentioned in this tender, the
interpretationgivenbyM.C.OrHisDesignetedOfficerwillbefinalandbindingtotheContractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing
orspecification and the Engineer -in-charge shall make such corrections and interpretations
asnecessarytofulfilltheintentoftheplantsandspecifications.
24. ThequantitiesofitemsinBOQ(BillofQuantities)mayvaryincaseofnecessityarises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the
MunicipalCorporation.willbepayablebythecontractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or
labourshallbepaid.
27. Contractoris requestedtoseethesitephysically beforetendering.Heis also
requestedtoquotetherateskeepinginviewofallthepointsmentionedinrelevantpagesoftenderdocu
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of
pipedwater for the construction of the works and provide a satisfactory supply of potable water
fordrinking, washing, sanitation and cleaning down. The contractor will be responsible for all
thecosts where applicable of connection, meter installation, water consumed, water required
fortestingpurposes,disconnectionandthelaying,maintenancesandultimateremovalofanydistribut
ionsystemaroundthesite.
29. Electricity: Electric supply will be made available at the site by the Contractor and
thecontractormustmakehisownarrangementswiththeCorporationandElectricitySupplyAuthoritie
sand with other contractorsto connect and to takeasupply from such services,paying
allcostsinconnection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site
forpurposeoftheworkandshallpaysuchchargesasisfixedbytheappropriatesupplyAuthorities.
In casethereis any delay in supply ofpower siteof any interruption or fault in thepowerduring the work.
No compensation shall be paid for idle labor staff, machineries and for use ofdiesel operatingsets
etc.asthecasemaybe.
30. Tendersshallsubmitallthevalid/certifieddocumentsinsupportoftheirinitial/eligibility
criteria mentioned abovealong with thebid.They shall havealso to
submittheincometaxclearancecertificateandsolvencycertificate.
31. No advance such as secured advance machinery advance, mobilization advance or
materialsadvancewillbegiven.
32. ThecontractorshallgettheelectricalworksexecutedthroughtheauthorizedGovernmentapprovedli
censedelectricalpersonorfirminappropriatecategoryinaccordancetocontractualprovisions.
33. Theelectricalworksshallbecarriedoutstrictlyinaccordancewiththedirectivesissued
byEngineerin charge.
34. Contractorsshallnothaveanydisputeorclaimforanykindofcompensations
(i) Ifthequantitystipulatedinthetenderitemsvariesorthescopeofworkchanges&there
bytotalamountofworkincreases/decreases.
(ii) Iftheworkgetsdelayed/postponedforsomeadministrative/technicaldecisionwhatsoever.
35. In case ofany dispute,decision ofMunicipalCommissioner shallbe final and
bindingonthecontractors.
36. Tenderswhichdonotfulfillalloranyofconditionsoraresubmittedincompleteinanyrespect will be
rejected. Municipal Commissioner reserves the right to increase/decrease thescope of work. No
any claim to that effect shall be entertained. The Municipal
Commissioneralsoreservestherighttorejectanyorallthetenderswithoutassigninganyreasonthereo
37. Thecontractorsarerequestedtoquotetheirratesconsideringabovetenderconditions.
38. Thecontractorshallhavetoexecutethecontractagreementafterreceivedworkorder.
Even though in special case, If work is not started because of monsoon or any otherspecial
reason (like site is not available and due to unavoidable circumstances arise),afterevaluation of situation
the actual date of starting of work will be consider after approval ofDy.M.C.(West zone)
39. TheContractorshallnotclaimforincreaseordecreaseinthequantityoftheBOQitemorthescopeofwor
40. TheR.Abill/finalbillpaymentshallbemadeasperthelatestA.M.Cpolicy/circularfortheworkdonebyth
41. Conditionaltenderswillnotbeaccepted.
Signatureofcontractorwithseal
AdditionalCityEngineer(W.Z)Date
AhmadabadMunicipalCorporation
AHMEDABADMUNICIPALCORPORATIONENGGNIERI
GENERALSPECIFICATION
Timelimit for thework shall be12 months excluding monsoon after theorder to start the works.Progress
ofworkshouldbeinproportiontotimelimit.ThedetailsofreinforcementofR.C.C.workshallbeasperdesignandi
nstructionsofAdd.CityEngineerandhisorderwillbeconsideredfinal.
The contractor shall have to maintain account of steel, cement and other materials that may
bebroughtbyhimonsite.Thisaccountshallberegularlymaintainedandkeptopenforinspectionby Municipal
Staff.Watering ofall the items shallbe as per instructions otherwiseno payment shall be made to
contractors. Mixing of concrete shall be done by concrete mixermachine.Arrangements
ofbindingvibrator forR.C.C.worksifrequiredshallhavetobemadeby thecontractor.
Thecontractorshall beremain responsible for Workmen’s compensation ifany accident.The
contractor shall arrange for barricading at night and arrangement of Pagi at night to directthetraffic.
Heshall beresponsible for any damage to public.If any incident happen, duringtheexecution ofwork.In
case of dispute for unseen or overlooked items thedecision of theDy. City Engineer shall be final.The
contractor shall have to give site clean of all rubbishduring thework andat thetimeofcompletion
ofworkandhand over thesitewith finalfinishing of the work as directed.All therejected materials shall
beremoved from sitewithin24hoursbycontractoratthisriskandcost.Debrisshallhavetocartdailyfromsite.
Formixingmortareitherformasonryorforplasterorforanyotherpurposecontractorshallhavetopreparet
hroughofbiggersizeandmixthemortarintherequiredproportion.Inon case he shall be allowed to mix the
mortar either on floor or any finished surfaces.
Thecontractorshallhavetomakehisownarrangementforwaterrequiredforthework.
If any extra item crops up during the progress of work the same shall be carried out by thecontractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based
onlatestSORorifitemisnotavailableinSORthanbasedoncurrentmarketrates.IncaseofextraitemdecisionofAd
d.CityEngg.shallremainfinalregardingrate.
Ifin the interest ofthe Corporation it isnecessary to changeeither any siteor thedesign
oftheproposeworkthecontractorshallcarryoutthesameathisquotedrateswithoutchargesany extra and the
contractor will have to carry out the works and he will be paid at the
ratequotedbyhim.Noclaimforextrarateforsubsequentchangesinsiteanddesignisentertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the
contractorsshallhavetopreparethemeasuresboxesaccordingtothismeasure.
Octroi exemption passes shall not be given for any materials required for the work.
ContractorwillbefullyresponsibleforcomplianceofthevariousprovisionsundercontractAct.1970andtheRule
sframedthetounder.
Thetender for the work shall remain open for aperiod (180) days from the date of opening ofthe tenders
for this work and that the tenderer shall not be allowed to withdraw on modify theoffer on his own
during the period. If any tenderer withdraw or makes any modifications oraddition in the terms and
conditions of his tender not acceptable to the Municipal CorporationtheMunicipalCorporation
shallwithoutprejudicetoany rightorremedy be at liberty toforfeitin
fullthesaidearnestmoneyandblacklistthecontractor.
Ifworkisnotstartedwithinspecifiedtimelimitthepenaltyasperrule&tenderconditiondelay of start shall be
recovered separately from the immediate bills payable to the
contractor.Contractorhastomakehisownarrangementforprocurementofsteelandcement.
Contractorsshouldnotethefollowingconditionscarefully:-
i) Conditionaltendershallnotbeaccepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to
iii) In case of tender downloaded from website, tender fee & EMD should be submitted
informofdemanddraft
iv) Condition of Form - B1 Standard Specification of material & code of practice will
beapplicable.FormB1canbeisavailableinwebsite.Specificationshallbeasper'R&BDept.-
Govt.ofGujaratbookletsofBuildingWorks&andRoadWorksSpecificationspublishedbyGujaratBo
okDepot,Sector-21.Gandhinagar.
CONTRACTOR'SSIGNATURE ADDL.CITYENGINEER
&STAMP (WestZone)
AHMEDABAD MUNICIPAL CORPORATION ENGINEER DEPARTMENT
TECHNICAL SPECIFICATION
Name of Work :- Construction of khambhati kuva in different places at Stadium ward in
west zone (ARC-1). (Re-Tender)
General Technical Specification Section
Following technical specifications shall be applicable to the relevant items of BOQ
Item No. 1:- Extra rate over item of excavation of earth for excavation of asphalt pavement/RCC of thickness up to 0.20 meter
including demolishing the asphalt carpet,metal,soiling /cutting reinforcement etc.comp. with stacking the material as directed.
(based on previously approved rate by CE sir
Work As Directed By Engineer in charge.
The rate shall be for a unit of smt.
Item No. 2:- Refilling the pipeline trencheds incl. ramming, watering, consolodating desposal of surplus stuff as directed within
a radius of 3 km. (GWSSB SOR 2021-22)
The rate shall be for a unit of cmt.
Item No. 3:- Conveyance charge of earth,lime,murrum, building rubbish,manual garbage,sludge ,excavated rock,fly ash,
aggregate of any kind etc. comp. up to 5Km. lead (SOR 2015-16, P-589 - Item code- 3.2.1)
The rate shall be for a unit of cmt.
Item No. 4:- Providing and supplying ISI Standard RCC pipes (of sulphate resisting Cement )in standard lengths of following class
and diameter suitable for rubber ring joints (socket and spigot) including all taxes,insurance, transportation,treight
charges,octroi,inspection charges, loading,unloading, conveyance to departmental stores, stacking etc. complete (GWSSB SOR
The rate shall be for a unit of rmt.
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in proper position , grade and alignment at all level
as directed by Engineer-in- charge including conveyance from stone to site of work, labour giving hydraulic testing as per ISI code.
The mode of payment for this item shall be on Rmt. Basis.
Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation, Refilling, Brick Bats Cement Concrete (1:5:10) of
thickness 15 C.M., CC Channel (1:2:4) of thickness 10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) In
Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C At 35 Cm Staggered Masonary In Cm
1:5, Rcc Slab In Cc1:1.5:3 of thickness 15 C.M.,Including Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm
dia.)But Excluding The Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear, M.H. length should be
parallel to the flow)
The mode of payment for this item shall be on No Basis.
Constructing Slab type M.H. Chamber of the following size including excavation, refilling, brick bats cement concrete (1:5:10) of
thickness 15 C.M., CC Channel (1:2:4) of thickness 10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) in
CM 1:3, finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in masonary CM 1:5,
RCC Slab in CC 1:1.5:3 of thickness 23 C.M., including Cantering & reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.)
but excluding the cost of Manhole seat cover etc..completed. of Size 1.00 X 1.40 meter (Inside Clear, M.H. length should be parallel
to the flow, for pipe dia <= 800 mm)
The mode of payment for this item shall be on No Basis.
Making connection to the ex. M.H.in running sewer incl. Dewatering and other required machinery etc. of following dia pipes at
any convenient time. All damaged work shall be well repaired as per instructions. etc..complete.
The mode of payment for this item shall be on No. Basis.
Cutting the pipes of following dia coming in the new M.H.in running sewer including cutting bars, including removing debris
/silt from the M.H. and carting at a suitable distance etc..complete as directed. No payment for M.H. work will be made until
pipe is not cut completely in all respect.
The mode of payment for this item shall be on No. Basis.
Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including excavation, B.B.C.C. (1:5:10), 23 cms
thick brick maso. wall in the prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and 15 mm thick
cement plaster inside the catch pit in the proportion of CM (1:3) with out jali etc. comp. as directed.
The mode of payment for this item shall be on No. Basis.
CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc. comp. As directed by engineer in charge.
The mode of payment for this item shall be on No. Basis.
Structural steel work riveted, bolted or welded in built up for all type sections, inframed work, including cutting, hoisting, fixingin
positionand applying aprimingcoat of approved steel primer all complete as per the structural designsand directions of Engineer
The mode of payment for this item shall be on Kgs Basis.
Providing Fabricating and fixing MS Grating Jali for Machinehole having 65 X 65 X 8 mm MS Angle with Horizontal and Vertical 65 X
10 mm MS Flate with 50 mm Spacing at equal distance. Work includes with oilpaint and Transportation on site work comp. as per
Instruction by Engg. incharge.
The mode of payment for this item shall be on No. Basis.
Raising of Existing manhole item includes,cutting of existing road surround by Manhole by diamond cutter machine dismantling of
road in confined area by breaker machine and carting of dismantal material.item also included necessarey brick work to raise the
manhole at road level in CM 1:3 item also included fixing of Manhole frame at exact road level by using MaserEmaco S
trowable fibre reinforced thixotropic repair mortal material Laying of concrete made form Master Emaco 5 346 flowable micro
concrete material in desired thickness and laying of hot bitumanous material in Upper layer and compaction of hot bitumanious
material by palte compactor machine .Rate also included necessary plaster at inside of manhole in CM 1:3 in 20 MM thickness on
raised brickwork.
The mode of payment for this item shall be on No. Basis.
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated
stuff upto 50 Meter lead.(B) Dense or Hard soil( R&B Ahmedabad city SOR 2023-24 item code:-4B001)
The mode of payment for this item shall be on cmt. Basis.
Excavation for foundation for depth from 1.5 m to 3.0 m ncluding sorting out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(B) Dense or Hard soil( R&B Ahmedabad city SOR 2023-24 item code:-04B002B)
The mode of payment for this item shall be on cmt. Basis.
Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off
the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil( R&B Ahmedabad city SOR 2023-24 item code:-04B003B)
The mode of payment for this item shall be on cmt Basis.
Extra for additional depth more than 5.0 m forexcavation for foundation including sorting out andstacking of useful materials and
disposing off theexcavated stuff upto 50 m lead.(B) Dense or Hard soil( R&B Ahmedabad city SOR 2023-24 item code:-04004B pg
The mode of payment for this item shall be on cmt Basis.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm. in
depth, consolidating each deposited layer by ramming and watering etc. complete. (Building SOR 2021-22, Item Code 4006, 4.12)
The mode of payment for this item shall be on cmt Basis.
Providing and laying cement concrete 1:4:8 (1- Cement: 4 Coarse aggregate: 8-Hand broken stone aggregates 40 mm nominal size)
and curing complete excluding formwork in (A) Foundation and plinth. (Building SOR 2023-24, Item Code 05004A, 5.3.3)
The mode of payment for this item shall be on cmt Basis.
Providing and laying controlled cement concrete M- 200 for curing complete excluding cost of formwork and reinforcement for
reinforced concrete work in (C)Slabs, landing, shelves, Balconies, Weather sheds, lintels, beams, girders, and cantilevers, up to
floor two level (Building SOR 2023-24, Item Code 05024CA, 5.8.2)
The mode of payment for this item shall be on cmt Basis.
Providing TMT Bar FE500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor
two level. (Building SOR 2023-24, Item Code 05014C,)
The mode of payment for this item shall be on Kg Basis.
Providing Formwork of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and roping
etc. Height of propping and centering elowupporting floor to celling not exceeding 4 Mt. and removal of the same for in-situ
reinforced concrete and plain concrete work in (B) Flat surfaces such as soffits of slabs, landings and like(1) Floor etc. upto 200 mm
thickness. (Bullding SOR 2023-24, Item Code 09001B1A, 9.8)
The mode of payment for this item shall be on smt Basis.
Providing Formwork of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and proping
etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 Mt. and removal of the same for in-situ
reinforced concrete and plain concrete work in (G) Sides and soffits of beam, haunchings, cantilevers, girders, bracings, and lintels
not exceeding 1.0 Mts. in depth. (Building SOR 2021-22, Item Code 09001H2A, 9.1)
The mode of payment for this item shall be on smt Basis.
Brick work using common burnt clay building bricks having crushing strength not less than 35 kg/Sq. cm. in foundations and plinth
in cement mortar 1:6 (1 cement :6 fine sand) for conventional type bricks. (Building SOR 2023-24, Item Code 06002BA, 6.13)
The mode of payment for this item shall be on cmt Basis.
Providing F.R.C. Mh Seat Cover Incl. Carting To The Work Site Etc. Comp. Directed.
The mode of payment for this item shall be on nos Basis.
Providing and filling Pre filter a mixture of 20 mm - 40 mm gravels surrounding the precast filter systemsystem, {SOR GWSSB
(Electro Mechanical) (2022-23) Section "A" annexure-A Page 6}
The mode of payment for this item shall be on cmt Basis.
Providing, supplying & fixing to wall ceiling and floor 6.0 kg. F/Cm2 working pressure polythelene pipes of the following outside
dia. Low density. Complete with special flange empression type fittings. Wall clips etc. incl. making good the wall ceilling and
floor.(140 mmDia)
The mode of payment for this item shall be on cmt Basis.
The colour and workmanship shall be in accordance with the Code of Practice for painting, and as specified in the drawings or as
directed by the Engineer
Materials: Synthetic enamel paint shall conform to IS.
The materials required for work of painting work shall be obtained directly from approved manufacturers or approved dealer and
brought to the site in maker's drums, kegs etc. with seal unbroken.
All materials not in actual use shall be kept properly protected, lids of containers shall be kept closed and surface of paint in open
or partially open containers covered with a thin layer of turpentine to prevent formation of skin. The materials which have
become stale or flat due to improper and long storage shall not be used. The paint shall be stirred thoroughly in its container
before pouring into small containers. While applying also the paint shall be continuously stirred in smaller container. No left over
paint shall be put back into stock tins. When not in use, the containers shall be kept properly closed.
If for any seasons, thinning is necessary, the brand of thinner recommended by the manufacturer shall be used.
The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and grease shall be thoroughly removed before
painting is started. No painting on exterior or other exposed parts of the work shall be carried out in wet, damp of otherwise
unfavorable weather and all the surfaces shall be thoroughly dry before painting work is started.
Brushing operations are to be adjusted to the spreading capacity advised by the manufacture of particular paint. The paint shall
be applied evenly and smoothly by means of crossing and laying off. The crossing and laying off consists of covering the area over
with paint, brushing the surface hard for the first time over and then brushing alternately in opposite directions two or three
times and then finally brushing lightly in direction at right angles to the same.
In this process, no brush marks shall be left after the laying off is finished. The full process of crossing and laying off will
constitute one coat.
Each coat shall be allowed to dry completely and lightly rubbed with very fine grade of sand paper and loose particles brushed off
before next coat is applied. Each coat shall vary slightly in shade and shall be got approved from Engineer-in-charge before next
coat is started.
Each coat except the last cost shall be lightly rubbed down with sand-paper of fine pumice stone and cleaned of dust before the
next coat is applied. No hair marks from the brush or clogging of paint puddles in the corners of panels angles of mouldings etc.
shall be left on the work.
Approved best quality brushes shall be used.
Mode of measurements & payment :
Any type of C.C. Central verges curbs surface shall be measured under this item.
All the work shall be measured not in the decimal system as executed subject to the following limits unless otherwise stated
(a) dimensions shall be measured to the nearest 0.01 metre.
(b) Areas shall be worked out to the nearest 0.01 Sq. metre.
No deductions shall be made for openings not exceeding 0.5 sq. mt. each and no addition shall be made for painting to beadings,
mouldings, edges, jambs, soffits, etc. of such opening.
The different surfaces shall be grouped into one general item, areas of uneven surface being converted into equivalent
plain areas in accordance with the mode of measurement for payment.
The rate shall be for a unit of one SMT.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Seal and Signature of the Bidder Add.CityEngineer(West Zone)
Amdavad Municipal Corporation
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl –vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj
fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb
<&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu
mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk
ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu
ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf
duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh
fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe
mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
16. mœh xuLzhbtk ” dwsht< mhfth ©e lt ©b,ftiNÕg rJftm ylu htusdth
rJCtd,mraJtjg,dtk^eldh lt XhtJ ¢btkf: LED/WRT/e-file/11/2024/0293/M2
Dt.15.02.2024” bwsc awM<vKu ybj fhJtltu hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto ctœ
24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu ftbdehe
fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb NY
fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk vwKo fhJtbtk
lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall
be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form
a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through
its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 35.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].