Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹14.7 Cr
EMD Value
₹3.8 L
Closing Date
29 Jan 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Chief Engineer (P&C)
Supply, erection, testing & commissioning of 66kV M/C Line on ACSR Panther Conductor for (1) LILO of existing 66kV Gandhidham B - FTZ Line to proposed 220kV Padana Substation D/C line on M/C tower and (2) LILO of existing 66kV Mithirohar IFFCO line top to 220kV Padana Substation D/C line on M/C tower having route length of 9.595rkm under KSY under Anjar circle.
260559
ACE(P&C)/Contract/E-404/TL/66kV/S&E
Open
Electrical Works
Works
Vadodara
29 documents required · 22 mandatory · 7 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹3.8 L
6 Jan 2026
6 Jan 2026
6 Jan 2026
29 Jan 2026
6 Jan 2026
Sr. No. Description of Works - SAC Code 9954 Amount in Rs.
PART -A Supply of Materials
Erection of Line
TOTAL F.O.R. COST WITHOUT GST
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL END COST WITH GST
I am / we are willing to carry out this service package of works contract stated above at GST 18% (in figure)
______ % (in words _____ %) below / above the estimated TOTAL END COST for all the items stated there
The amount of tender works out with above % (in figure) for TOTAL END COST Rs. _____________ (in
I / we confirm that our above quoted rates are ON firm price basis; except supply of tower materials (including
nut-bolts) for which Price variation will be applicable.
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better
economical management and for the ease of Accountancy but the entire Contract, is to be assessed under GST Law,
as the Works Contract Service, which is, as per the provisions of Section 2(30), read with, Section 2(119), further read
with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar provisions, applicable
under the UTGST Act, 2017and the IGST Act, 2017 and the entire activity, would be subjected to levy of Tax, at the
rate of 9% CGST + 9% SGST or 18% IGST, under the GST Law. However, Classification Codes for different segments
or portions of the Works Contract, may be specified separately, in the Supplies, with a final common Classification
Code of Works Contract Service.
2) The Bidder is hereby conveyed that only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is
relavant for the purpose of contract since the contract is works contract and any separation in the works is for better
management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency
purpose which shall have no bearing on price or taxation payment.
Signature of Authorized Representative of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
FOR REFERENCE ONLY
Supply, erection, testing & commissioning of 66kV M/C Line on ACSR Panther Conductor for (1) LILO of existing 66kV Gandhidham B - FTZ Line to proposed 220kV Padana Substation D/C line on M/C
tower and (2) LILO of existing 66kV Mithirohar IFFCO line top to 220kV Padana Substation D/C line on M/C tower having route length of 9.595rkm under KSY under Anjar circle.
Route length - 9.595 kM
Unit Freight, Unit
Description of Supply with Detail Specification of HSN / SAC code FOR Total Cost
Packing & Insurance FOR Unit Rate
Sr. No. Service Package - Works Contract for identification Unit Quantity Unit Rate (Excl. GST)
Forwarding Charges in in Rs.
(SAC Code: 9954) only in Rs.
A Supply of Materials
A.1 Tower Materials
A.2 ACSR Panther Conductor KM 0.00 195373.00 2867.20 1228.80 199469.00 -
A.3 SR Insulators
A.3.1 66kV, 90kN Suspension & Tension Nos. 364 1472.00 11.20 4.80 1488.00
A.4 Insulator hardware for ACSR Panther Conductor
A.4.1 Single Suspension Nos. 336 1385.00 16.80 7.20 1409.00
A.4.2 Double Suspension Nos. 12 3907.00 34.30 14.70 3956.00
A.4.4 Double Tension Nos. 24 4378.00 51.10 21.90 4451.00
A.4.6 Mid Span Joint Nos. 64 615.00 6.30 2.70 624.00
A.4.7 Vibration Damper Nos. 672 506.00 10.50 4.50 521.00
A.4.8 Repair Sleeve Nos. 12 210.00 6.30 2.70 219.00
A.5.1 48 Fibre (DWSM) OPGW fibre Optic cable kM 9.595 172341.00 2140.60 917.40 175399.00
Installation Hardware set * & accessories for above
OPGW i.e. all cable fittings & accessories like suspension
clamps, tension clamps, vibration dampers, earthing
clamps, down lead clamps, in-line splice enclosures etc.
including; Pigtails FC-PC type)
a) Fibre Optic Approach Cable -
500 Mtrs - For 400KV S/S
(with installation hardware like ties/
clips / cleats, conduits, ducts,
supports, fittings, accessories etc).
(Any variation in quantities shall be absorbed by
TOTAL COST PART - A WITHOUT GST
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL COST PART - A WITH GST
ERECTION PORTION
FOR REFERENCE ONLY
Supply, erection, testing & commissioning of 66kV M/C Line on ACSR Panther Conductor for (1) LILO of existing 66kV Gandhidham B - FTZ Line to
proposed 220kV Padana Substation D/C line on M/C tower and (2) LILO of existing 66kV Mithirohar IFFCO line top to 220kV Padana Substation D/C
line on M/C tower having route length of 9.595rkm under KSY under Anjar circle.
Route length - 9.595 kM
Description of Supply with Detail Specification of FOR Total Cost
SN Service Package - Works Contract Unit Quantity Unit Rate (Excl. GST)
(SAC Code 9954) in Rs.
B ERECTION OF LINE
The work of detail survey, preparation and
submission of profiles in 6 copies (PLSCAD as well
Detail scope of Work :-
(a) Fixing of tower as per actual requirement, site
condition and plotting of line on profile having
standard details i.e. span length, lat-long (co-
ordinate), chainage, weight and wind span, all
dimensions, scale, legends, tower spotting data
etc. as per requirement and along with all require
(c) Preparation and submission of tower schedule
as per standard require details with all the Major -
Minor crossing details in profile drawing and tower
schedule, along with due care of clearance as per
prevailing standards i.e., for all electric line with
pole, all type of track, river, pond, nala, road, canal
(d) Details of Right of Way in profile drawing. i.e.
Building, Temple, Well etc.
(g) Plotting line on TIKKA-MAP (Revenue Land
map) - Required TIKKA-MAP will be provided by
Importantly, any work other than mentioned will
align with the specific requirements outlined by the
Engineer-in-Charge.
Note : The survey report will be submit with sign
Check Survey along with plotting of line route on
village (tika) map with Coordinates including
2 detailed survey, preparation of profiles and revision kM 9.595 10859.00
in original route alignment, if any and as per
instruction of EIC.
Excavation excluding back filling, but including
shoring, shuttering, dewatering, tree cutting for -
tower footings etc. for:-
3 a) Normal soil either dry or wet / Sandy soil. CMT 1472.43 384.00
b) Black Cotton Soil either dry or wet. CMT 1719.36 763.00
d) Black cotton submerged / marine soil where
dewatering is necessary.
Installation of steel reinforcement in concrete
foundation including supply of GETCO Approved
M.S. bars, binding wire. Work also includes their
4 cutting, bending, shaping and binding with binding MT 165.239 120022.00
wire and fixing in position of TMT bars as per
drawing before the concrete work and as per
instruction of the EIC
Stub-setting with prop or template including back-
filling, during back filling dispose of excess soil and
levelling of site is to be done as per instructions of
EIC but excluding excavation and concreting etc.
for all types of towers/extensions except special
towers. (Weight of stub, cleat & template with Bolt
& Nuts of stub & template shall be counted)) up to
6 mtr extension. (SOR Part-A -6)
Concreting of foundation by M20/M15/M25 mixture
including shoring, shuttering, compaction,
dewatering etc. for normal tower / tower with
extension upto 25mtr.
After completion of concrete work, curring -
6 (watering to concerte) is to be done as per
instruction of EIC.
(Rates are inclusive of supply of GETCO approved
Grounding of towers with pipe type earthing
including excavation and back filling, with supply of
all materials like 32mm dia heavy duty 3 mtr. long
G.I. Pipe, 50 x 6 mm G.I. flat, GI bolt-nuts, with GI
spring washer, salt, charcoal etc. as per drawing
and as per instruction of EIC.
Erection of super structure upto 6 meter extension
including tree cutting, fixing of tower accessories,
attachments except ACD /DP /NP /CIP /PP and
excluding tack welding of bolts as per instruction of
EIC. This includes taking delivery of tower
materials and bolt-nuts from GETCO’s stores etc.
for normal, extension & special towers at
destination and keeping them in safe custody and
transporting the same to erection site.
Fixing of Anti-climbing devices including supply of
barbed wire as per drawing and as per instruction -
Fixing of DP / NP / PP / CIP including supply of
plates and supply of G.I. bolts-nuts & tack welding
10 as per drawings and as per instruction of EIC.
(II) For M/C Loc. 54 7268.00
Tack welding of nuts upto approx. 10 mtrs. height
OR two bottom-most panel from ground level at
11 three places on the nuts diametrically and applying Per Bolt 25500 23.00
zinc rich paint immediately after tack welding and
as per instruction of EIC.
Complete Installation of OPGW cable (24/48
fibres) including laying, providing required
hardwares, in line splices to be encased in Fibre
Optic Splice Enclosures, Laying and termination of
a fibre optic approach cable required to connect
Overhead Fiber Optic Cable (OPGW) between the
final iin line splice enclosure on the gantry/tower
and the Fibre Optec Distribution panel (FODP) to
be installed within the building at both the
substation ends as per technical specifications
Link up of OPGW Cable including all related
activities as per inst. Of EIC.
Stringing of ACSR/ AAAC 12 (Twelve) conductors
for double circuit including laying, jointing,
tensioning, clamping with armour rods, hoisting of
14 insulator string fixing of jumpers, dampers etc. & rkm 9.595 292256.00
with required tree cutting on entire length for
adequate clearances / safe charging of line, as per
instruction of EIC.
Termination and connection for making LOOP-IN-
LOOP-OUT arrangement with existing line during
specified outage including restringing of existing
conductors OR dismantalling / new stringing for
making LILO arrangements with existing line or for
15 Job work 1 153786.00
change over line as per approved LILO
arrangement in profile as per instruction of EIC in
COLD CONDITION and dismentalled materials to
be credited to near by GETCO's store or sub
station as per inst. of EIC.
Work of Painting of Line name, Location No., two
coat Painting Color code of desired length and
telephone no. on Tower Leg with letter of Gujarati
16 language using ISI marked Paint as per instruction per loc 54 1038.00
of EIC including Supply of paints and other require
a)All four legs - For 4 Nos. of Line (M/C)
TOTAL COST PART - B, SCHEDULE 01 WITHOUT GST
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL COST PART - B, SCHEDULE - 01 WITH GST
1) While calculating the weight of stub-setting, the weight of stub, cleat & templetes shall also be added in stub weight.
2) Red oxide & zinc rich paint shall be applied after tack welding of nuts.
3) The above rates are with supply of cement by the contractor.
4) The rate indicated above includes taking delivery of all stringing materials from Board / Contractor store at destination keeping them in safe custody
and transporting the same to erection site.
5) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical management and for the
ease of Accountancy but the entire Contract, is to be assessed under GST Law, as the Works Contract Service, which is, as per the provisions of
Section 2(30), read with, Section 2(119), further read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar
provisions, applicable under the UTGST Act, 2017and the IGST Act, 2017 and the entire activity, would be subjected to levy of Tax, at the rate of 9%
CGST + 9% SGST or 18% IGST, under the GST Law. However, Classification Codes for different segments or portions of the Works Contract, may be
specified separately, in the Supplies, with a final common Classification Code of Works Contract Service.
6) The Bidder is hereby conveyed that only only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant for the purpose of
contract since the contract is works contract and any separation in the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose which shall have no
bearing on price or taxation payment.
7) If condcutor provided by GETCO, Contractor has to retuned back empty steel drums at GETCO's store immediately on complition of stringing work
as per instruction of EIC. If fail to submit in given time period the necessary action will be imposed by concered authority.
8) The rate indicated above includes taking delivery of all stringing material from contractor store/ GETCO’s store keeping them in safe custody and
transporting the same to erection site.
9) For any crediting of material related work, agency has to submit the original gate pass copy / CR copy with required documents as per inst. and as
per requirement of EIC or when demanded.
Signature of Authorized Representative
of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21.EMD BG Format.pdf
6. MAAT LA Networth Form.pdf
7.AL59 PANTHER & MOOSE_R5.pdf
8.Amendment- Structure weight.pdf
9.Foundation Volume-E-404.pdf
10.HW and ACCS PANTHER CONDUCTOR.pdf
11.ON - Ammendment for ROW clause Tender Copy.pdf
12.OPGW (48F) specs final-R2-11.09.2023 final.pdf
13.R1 - STEEL DRUM.pdf
14.R5 - ACSR cond MOOSE ZEBRA PANTHER DOG -PRINT Copy.pdf
15.R5 May 24- Silicon Rubber - Print Copy.pdf
16.Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
17.SUPPLY & ERECTION OF 66KV MULTI CIRCUIT LINES.pdf
18.TOWER MATERIAL-66KV MC LINE-PANTHER-final.pdf
19.Lat Long-E-404.pdf
20.Tower Wt-MC -E-404.pdf
21.EMD BG Format.pdf
22.Form of LD undertaking 1A.pdf
23.Form of LD undertaking 1B.pdf
25. ERECTION Circular-2.pdf
26.ONLINE SCHEDULE TECH - E-404.pdf
27.Online Schedule-QR-E-404.pdf
28.Public Procurement Circular of GOI.pdf
29.SD cum PBG Format.pdf
30.Letter for CBuD.pdf
31.RoW policy 2021.pdf
32. ERECTION Circular-1.pdf
33. STD FQP TR LINE JUNE-2014.pdf
34.PIPE TYPE EARTHING 1.pdf
35.PIPE TYPE EARTHING 2.pdf
36.PIPE TYPE EARTHING 3.pdf
37.Safety regulation for transmission line.pdf
38.TTR Validity ammentment -2.pdf
39.DOUBLE TENSION HARDWARE PANTHER.pdf
40. SINGLE SUSPENSION HARDWARE.pdf
41.DOUBLE SUSPENSION PAN HARDWARE.pdf
42.SINGLE TENSION HARDWARE PANTHER.pdf
4.L-2 Schedule.pdf
2. TL Amend -I Part-I LILO Gandhidham B FTZ at 220KV Padana E-404.pdf
43..Joint venture agreement.pdf
5.Price Bid-E-404.pdf
44.4R DAMPER FOR ACSR ALL COND.-Model.pdf
45.0036 - G - DSN PAN-Model.pdf
46.132KV DOUBLE TENSION HARDWARE FOR ACSR PANTHER CONDUCTOR Model (1).pdf
47.132KV SINGLE SUSPENSION HAEDWARE FOR PANTHER ACSR Model (1).pdf
48.132KV SINGLE TENSION HARDWARE PANTHER (ACSR) Model (1).pdf
49PREFORMED ARMOUR ROD SUITABLE FOR ASCR CONDUCTOR-Model.pdf
50.REPAIR SLEEVE-Model.pdf
51.TUBULAR COMPRESSION JOINT-Model.pdf
1.Part-1 Tender Spec-LILO Gandhidham B FTZ line at 220KV Padana -E-404.pdf
3.Tender Notice LILO Gandhidham B FTZ at 220KV Padana E-404.pdf
52.File and Drawing List-E-404.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .