Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
2 Mar 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ER. D.K Kaith
EXECUTIVE ENGINEER PWD(RnB) DIVISION SAMBA
Please refer to BOQ
2021_PWDJK_117370_9
41 OF 2020-21 dated 18-02-2021
Open Tender
Civil Works
Item Rate
30 days
Samba
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PWD(RnB) DIVISION SAMBA
Exempted
8 Mar 2021
19 Feb 2021
3 Mar 2021
20 Feb 2021
2 Mar 2021
20 Feb 2021
90 days
Amount
Earth work in excavati..;n by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed 2.35.1 All kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with, a) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) with all leads and lift carriage complete.
b) 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with all leads and lift carriage complete.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement-All work upto plinth level.1.1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) with all leads and lift carriage complete.
Reinforcement for RCC work including straightening, cutting bending placing in position and binding all complete.
Centring and shuttering including strutting, propping etc. and removal of form work for:- a) Foundations, footings, bases of Columns.
b) Suspended floors, roofs, landings, balconies and access platform.
c) Edges of slabs and breaks in floors and walls Under 20 cm wide
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete, 50 mm thick with 20mm nominal size stone aggregate, with all leads and lift carriage complete.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Supply and laying of River Bed Materials of max. size 75mm leveling dressing watering consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete.
Pardeep Kumar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .