Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹49.7 Cr
EMD Value
₹79.2 L
Closing Date
10 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Managing Director, MPYPIL
Transport Department, Vallabh Bhawan-II, First Floor, Bhopal, Madhya Pradesh
RFP for Selection of Master System Integrator for Designing Development Integration Testing Operations and Maintenance of the Intelligent Transport Management System for Madhya Pradesh Yatri Parivahan and Infrastructure Limited
2026_TMPYP_549624_1
MPYPIL/RFP/2026/14
Open Tender
Info. Tech. Services
PPP-BoT-HAM
Madhya Pradesh
As per RFP
2 documents required · 2 mandatory
₹20,000
₹79.2 L
Bhopal Madhya Pradesh
17 Nov 2026
17 Nov 2026
11 Dec 2026
17 Nov 2026
10 Dec 2026
5 Dec 2026
17 Nov 2026 - 25 Nov 2026
25 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ITMS:
Complete ITMS Software development/ implementation, Documentation, UAT, Go-Live with all the required features and functionalities as per scope of RFP including but not limited to implementation cost, manpower, license, recurring charges, continuous development and all the components of Intelligent Transport Management System (ITMS) with all major and minor module and sub modules (AVLS, DMS, AFCS, ETIM, PIS, Master management, Mobile Application, OPRS, CCC, IMS, GRMS, IVRS, Helpdesk, BI Tool, GIS Map, SLA Tool, AI Chatbot, and all other required systems and applications to fulfil project need | 1 | Lumpsum | - | - |
| 2 | Integration:
Integration of all the project components as per requirement of RFP which include but not limited to (Existing ITMS, L3 certification, Payment Gateway, NCMC integration, Vahan, Sarathi, RTO, WhatsApp, SMS, Email, passenger counting and integration with any other envisaged system/application as required in the project. | 1 | Lumpsum | - | - |
| 3 | Hardware Integration:
Hardware Integration (all the in bus hardware integration as per the scope of RFP including VLTD, OBU, ETIM, Passenger counting system, DC and DR system, CCC hardware and other hardware comes as part of the project) | 1 | Lumpsum | - | - |
| 4 | CCC
PRI Lines for Helpdesk and all CCC applicable
Helpdesk solution with required number of user/operator licenses (Min. 100), IVRS facility, helpdesk User interface, helpdesk operator headphones, IP Phones, workstation application and other accessories.
ILL (MSI to procure bandwidth (MBPS) as per requirement) for all the CCC and DC,DR
Any other component required to cater to the scope of work | 1 | Lumpsum | - | - |
| 5 | DC - DR
Setup and Configuration of DC and DR as per requirement.
Note: DC and DR Infrastructure shall be provided by MPYPIL/ State Data centre | 1 | Lumpsum | - | - |
| 6 | Security Audit
During phase wise deployment, complete project go-live and yearly security audit etc.as required in the project. | 1 | Lumpsum | - | - |
| 7 | Insurance
As required in the project | 1 | Lumpsum | - | - |
| 8 | Capacity building, training, data collection, survey, documentation, technical resources etc. | 1 | Lumpsum | - | - |
| 9 | Other Components:
Any other components, system, solution as required in the project as per the scope of RFP | 1 | Lumpsum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
ITMSRFP.pdf
Tender Documents • 5.68 MB
BOQ_661152.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .