Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
| 3 | Accepted-Technical | Accepted-Technical Accept |
| 4 | Accepted-Technical | Accepted-Technical Accept |
| 5 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
29 May 2026, 4:00 pmClosed
Executive Engineer REW Kargil
Executive Engineer REW Kargil
Construction of Community Hall ay Bakartsay Hemiling
2026_RDD_18941_1
e-Tender- 05 of REW Kargil UTL of 2026-27
Open Tender
Civil Works - Buildings
Percentage
Zanskar
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,960
Executive Engineer REW Kargil
₹3.9 L
2 Jun 2026
15 May 2026
30 May 2026
16 May 2026
29 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. a, All kinds of Soil (60%) | 529.16 | cum | 201.67 | ₹1,06,715.7 |
| 2 | b, Ordinary Rock(40%) | 530.16 | cum | 371.45 | ₹1,96,927.93 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding1.5 mtr in width) and for shafts, wells, cesspits and thelike not exceeding 1 sqm on plan, depth upto 1.5mtr.including disposal of excavated earth up to 1 mtr fromcutting edge, disposed earth is to be leveled and neatly dressed.a, All kinds of Soil (60%) | 531.16 | cum | 431.41 | ₹2,29,147.74 |
| 4 | b, Ordinary Rock(40%) | 532.16 | cum | 954.5 | ₹5,07,946.72 |
| 5 | Providing and laying Soling Stone hand packed /Pitching tightly. | 68.42 | cum | 820.2 | ₹56,118.08 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto 1:4:8 (1Cement :4 coarsesand (zone-III) derived fromnatural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 18.7 | cum | 5,539.82 | ₹1,03,594.63 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4graded stone aggregate 20 mm nominal size derived from natural sources | 160.68 | cum | 8,091.51 | ₹13,00,143.83 |
| 8 | Providing and fixing up to floor five level precast cement concrete Solid Blocks. Including hoisting and setting in position with cement mortar 1:3 (1 cement: 3 coarse sand), including Cost of required centering, shuttering complete job.1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) including carriage. | 198.24 | cum | 13,120 | ₹26,00,908.8 |
| 9 | Stone/Earth Filling into the plinth with hand packed tightly.including carriagea, Earth filling = 60% | 174.06 | cum | 237.8 | ₹41,391.47 |
| 10 | b, stone/filling = 40% | 116.04 | cum | 820.1 | ₹95,164.4 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.77 MB
BOQ_45247.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .