Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹28.0 L
EMD Value
₹28,000
Closing Date
13 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Und Irrigation Division, Jamnagar
Pipe Replacement at Road Crossing RBMC Minor Canals of Und-II Irrigation Scheme.
360201
14 of 2026-27
Open
Civil Works
Works
Jamnagar
7 documents required · 7 mandatory
₹1,500
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹28,000
27 Oct 2026
27 Oct 2026
27 Oct 2026
13 Nov 2026
27 Oct 2026
120 days
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : UND-II IRRIGATION SCHEME
Pipe Replacement at Road Crossing RBMC Minor Canals of Und-II
Irrigation Scheme.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Dismantling stone / brick masonary & stacking 23.00 Cum. 616.00
of useful and unuseful material from the
dismantled materials as directed etc. complete.
(A) In Cement Mortar.
2 Excavation in all sort of strata and formations 1081.00 Cum. 83.00
incl. depositing the unuseful excavated stuff as
and where directed incl. sorting and stacking
useful materials as directed upto 30 mt lead
and all lift etc. complete incl. dewatering.
(Depth 0 to 3.0 Mt.) (For all type canal &
foundation trenches of C.D. Works)
(A) IN OVER BURDEN HARD MURRUM.
3 Dismantling the existing RCC pipes including 240.00 Rmt. 127.00
sorting out and stacking of the useful material
(Pipe) measurable condition upto lead 200 mt.
as directed under the specification.
(ii) 450 mm to 600 mm diameter.
4 Providing, cutting, bending, binding and fixing 5.12 M.T. 58581.00
in position as per drawing M.S. Steel Bar
reinforcement for R.C.C. works and anchor bars
incl. cost of black annealed 16 to 18 BWG M.S.
Wire etc. complete with all lead and lift.
5 Providing, supplying at site, laying and fixing in 240.00 Rmt. 2214.00
position under ground, R.C.C. Hume Pipe of NP-
2 class of BIS standard incl. filling the joints
with cement mortar 1:1 with providing
necessary collar set complete with inclusive of
testing with working pressure and all lead and
lift. (G) 900 mm dia.
6 Prov. & Laying in position "NOMINAL MIX" 394.00 Cum. 4452.00
cement concrete using cement, sand and
crushed aggregate by mass and machine mix for
C.C. work incl. necessary formworks centering
scaffolding compaction by mechanical vibrator,
curing as directed with all lead & lift etc.
(E) Concrete grade 1:1.5:3 and MSA-20mm.
7 Back filling with selected earth brought from 550.00 Cum. 141.00
out side borrow area or from excavated useful
material including watering ramming,
consolidation with pneumatic temping and all
lead and lift etc. complete.
Total 2797303=72
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 27,97,303=72 Estimated Amount Rs. 27,97,303=72
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
SBD Und-II RBMC.pdf
Tender Notice No.14.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .