| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹22.6 CrAccepted-AOC B 1 E 27 MOHAN COOPERATIVE INDUSTRIAL ESTATE MATHURA ROAD NEW DELHI 110044 INDIA | SOUTH EAST | DELHI | 110044 | ₹22.6 Cr | I | Accepted-AOC Highest ranked bidder |
| 2 | II₹21.2 CrRejected-Finance 401 4TH FLOOR CAPITAL PARK IMAGE GARDEN LANE HI TECH CITY MADHAPUR HYDERABAD TELANGANA 500081 INDIA | HYDERABAD | TELANGANA | 500081 | ₹21.2 Cr | II | Rejected-Finance Refer Tender Committee Min. |
| 3 | Rejected-Technical | - | - | Rejected-Technical Please refer MOM |
Tender Value
₹27.1 Cr
EMD Value
₹25 L
Closing Date
24 Aug 2021, 3:30 pmClosed
Chief Engineer (Procurement)
MPRDC Bhopal
Procurement of Services for Designing, Development, Implementation and Maintenance of Road Asset Management System (RAMS) for MPRDC and MPPWD
2021_ADBRD_151668_1
515
Open Tender
Consultancy
1825 days
All MP
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹25 L
MPRDC Bhopal
31 Jan 2022
19 Jul 2021
24 Aug 2021
19 Jul 2021
24 Aug 2021
13 Aug 2021
29 Jul 2021
Amount
Total Price for Part A: Project Implementation Cost
Total Price for Part B: Operations & Maintenance and Change Request Handling Cost
Total Price for Part C: Data Collection and Survey Cost
Total Price for Part D: RAMS Cell/Maintenance Support Manpower Support Cost
Description of Work / Item(s)
Amount
Part A. Project Implementation Cost - Commercial Bid for supply, installation, commissioning, training, data digitization, etc.
A1: Implementation Cost - Bid Price for Equipment, Materials, Other items, Software, Application Development/Customization till Go-live, Etc
A2: Implementation Cost - Bid Price for User Trainings
A3: Implementation Cost - Bid Price for Data Digitization
Total Price for Part A. Project Implementation Cost - Commercial Bid for supply, installation, commissioning, training, data digitization, etc.
Description of Work / Item(s)
Amount
A1: Implementation Cost - Bid Price for Equipment, Materials, Other items, Software, Application Development/Customization till Go-live, Etc
Application Development/Customization
RAMS Application Development/ Customization Cost in case of CoTS
Hardware Components for DC
Rack Server
Storage
Tape loader
Tape media
L3 Managed Network Switch
CAT6 - Ethernet Cable (Qt 350 Meters each bundle)
Firewall/ UTM
Access Points
Network Rack
UPS (20 KVA and 3 Hours Backup) with Batteries
Other items (pls provide lumpsum price)
Software Components for DC
GIS Application Software
Server Operating System
Backup System
Antivirus
Server Management Software
Application Development and Associated tools
Other items (pls provide lumpsum price)
RAMS Cell Hardware
Workstation
Desktop
Laptops
UPS (10 KVA and 1 Hours Backup) with Batteries
Monitors 24 Inch
Multifunctional Colour LaserJet
Plotter
MS Office Suit 2019 or better with MS Access
MS Office Suit 2019 or better
Antivirus
Other items (pls provide lumpsum price)
The Total value of A1: Implementation Cost - Bid Price for Equipment, Materials, Other items, Software, Application Development/Customization till Go-live, Etc
Description of Work / Item(s)
Amount
A2: Implementation Cost - Bid Price for User Trainings
Project Orientation Conference
RAMS Operational Training
Super user Training
Core Application Training
Road Surveys and Data Analysis Training
Routine Maintenance Planning and Budgeting
Any other training as proposed by bidder (quote lumpsum amount)
The Total value of A2: Implementation Cost - Bid Price for User Trainings
Description of Work / Item(s)
Amount
A3: Implementation Cost - Bid Price for Data Digitization
Road Master Data
Work done in last 5 years
Any other as proposed by bidder (pls provide lumpsum price)
The Total value of A3: Implementation Cost - Bid Price for Data Digitization
Description of Work / Item(s)
Amount
Part B. Operations & Maintenance and Handling of Change Requests for a period of 5 Years
Total cost for Operations & Maintenance of the entire project for a period of 5 Years
* Cost of handling application level changes/ modifications and or enhancements requested for 1000 Man hours during O&M phase (after Go-Live)
The Total value of Part B. Operations & Maintenance and Handling of Change Requests for a period of 5 Years
Description of Work / Item(s)
Amount
Part C. Data Collection and Survey Cost
GIS Survey & Mapping through DGPS, Road Inventory along with Linear, Geometry & Spatial Referencing with ROW imaging as per detail mentioned in S.No. 1 under clause “6.12.9. Survey Detail” in Section 6.
Pilot Survey of Roads and bridges through Drone as per detail mentioned in S.No. 2 under clause “6.12.9. Survey Detail” in Section 6.
Road condition survey using laser based Advanced Network Survey Vehicle as per detail mentioned in S.No. 3 under clause “6.12.9. Survey Detail” in section 6.
For Single Lane Road
For more than Single Lane
For Four Lane and above
Road roughness survey using roughness measuring systems (Class3) such as calibrated bump integrator or accelerometer or any other suitable equipment of standard nature as per IRC standard as per detail mentioned in S.No. 4 under clause “6.12.9. Survey Detail” in Section 6.
For Single Lane Road
For more than Single Lane
For Four Lane and above
Pavement condition/structural strength using FWD and data processing and compilation in PMS as per detail mentioned in S.No. 5 under clause “6.12.9. Survey Detail” in Section 6.
Pavement Composition, sub-grade CBR, soil classification and data processing and compilation in PMS as per detail mentioned in S.No. 6 under clause “6.12.9. Survey Detail” in Section 6.
Culvert Inventory/condition and compilation in BMS as per detail mentioned in S.No. 7 under clause “6.12.9. Survey Detail” in Section 6.
General Bridge Inventory and compilation in BMS as per detail mentioned in S.No. 8 under clause “6.12.9. Survey Detail” in Section 6.
Detailed Bridge Inventory and Condition Survey along with compilation in BMS as per detail mentioned in S.No. 9 under clause “6.12.9. Survey Detail” in Section 6.
Seven Days Traffic Data Collection as per detail mentioned in S.No. 10 under clause “6.12.9. Survey Detail” in Section 6.
Three Days Traffic Data Collection as per detail mentioned in S.No. 10 under clause “6.12.9. Survey Detail” in Section 6.
Axel Load Survey as per detail mentioned in S.No. 11 under clause “6.12.9. Survey Detail” in Section 6.
Road Safety survey as per detail mentioned in S.No. 12 under clause “6.12.9. Survey Detail” in Section 6.
The Total value of Part C. Data Collection and Survey Cost
Description of Work / Item(s)
Amount
Part D. Manpower Support Cost - Manpower deployment in RAMS Cell/CCC/Maintenance Support
Key Professionals
Team Leader cum Road Asset Management Specialist
Highway Engineer cum Pavement Management System Specialist
Sr. Bridge Engineer cum Bridge Management System Specialist
Road Data Acquisition and Data Interpretation Specialist
Road Safety Engineering Specialist
Support Professionals
Highway Engineer/ Pavement Engineer/ Bridge Engineer/ Quantity Surveyors
Survey and Road Data Collection Expert
Sr. System Analyst
GIS Expert
DBMS Expert
Functional Domain Experts
Road and Bridge Management Expert (2x24)
Public Financing Expert
RAMS Application Support Manpower
Operation Manager
Assistant Operation Manager (2x60)
The Total value of Part D. Manpower Support Cost - Manpower deployment in RAMS Cell/CCC/Maintenance Support
LEA Associates South Asia Pvt. Ltd
LEA Associates South Asia Pvt. Ltd
LEA Associates South Asia Pvt. Ltd
SATRA SERVICES AND SOLUTIONS PRIVATE LIMITED
SATRA SERVICES AND SOLUTIONS PRIVATE LIMITED
SATRA SERVICES AND SOLUTIONS PRIVATE LIMITED
LEA Associates South Asia Pvt. Ltd
SATRA SERVICES AND SOLUTIONS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid