Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78.8 LAdmitted-Finance | -41.10% | ₹78.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 CrAdmitted-Finance | +8.96% | ₹1.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.5 CrAdmitted-Finance | +9.99% | ₹1.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.5 CrAdmitted-Finance AT LAMTIBAHAL PS BRAJRAJNAGAR DIST JHARSUGUDA PIN 768230 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768230 | +11.11% | ₹1.5 Cr | L4 | Admitted-Finance |
Updated dates
Tender Value
₹1.3 Cr
EMD Value
₹1.7 L
Closing Date
13 Mar 2026, 6:00 pmClosed
Staff officer Civil Chirimiri Area
Office of the Staff officer Civil Chirimiri Area
Resurfacing of internal coal transportation road at Vijaywest and Rani Atari UG mine of Rani Atari Sub Area
2026_SECL_353809_1
SECL/CHRM/ Dy. GMC/25-26/e-Tender/86 dt. 20.02.2026
Open Tender
Civil Works - Roads
120 days
CHIRIMIRI AREA
refer NIT
5 documents required · 5 mandatory
₹1.7 L
16 May 2026
20 Feb 2026
14 Mar 2026
21 Feb 2026
13 Mar 2026
21 Feb 2026
21 Feb 2026 - 28 Feb 2026
Item Description
Excavation in Soil by Manual Means Excavation for roadway in soil including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 1000 metres.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Dry Lean Cement Concrete Sub-base Construction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 810 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base with cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site,aid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
RCC pipe 900 mm dia NP-3 Spigot .
RCC pipe 600 mm dia NP-3 spigot
Total Impact of GST for the Purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 1.42 MB
Tendernotice_3.pdf
PDF • 0.18 MB
BOQ_366631.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid