Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.9 LAccepted-AOC NEAR GOVT POLYTECHNIC COLLEGE DEOD KHERI ROAD BY PASS KAITHAL | ₹86.9 L | L1 | Accepted-AOC LOA |
| 2 | L2₹100.0 L+₹13.1 L (15.1%)Rejected-Finance KHASRA NO 183 10 SHYAM VIHAR HISAR HISAR HARYANA 125001 | HISAR | HARYANA | 125001 | ₹100.0 L+₹13.1 L (15.1%) | L2 | Rejected-Finance Highest |
| 3 | L3₹1.0 Cr+₹14.7 L (16.9%)Rejected-Finance | ₹1.0 Cr+₹14.7 L (16.9%) | L3 | Rejected-Finance Highest |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
28 Jan 2025, 5:00 pmClosed
NAVEEN RATHEE
ED - Ambala
Construction of a four lanning of internal road of Pehowa Town from 50.860 to 58.880 Km. transferred from NHAI in District Kurukshetra (CM Announcement No. 24196 dated 19.02.2019 ) ( Pehowa Constituency) (Pdg. Shifting of Electrical Poles).
2025_HRY_423660_1
2025B29EB318 890F 4D72 92CB 961DC3D2F78D663BAR
Open Tender
Civil Works
Works
365 days
Ambala Cantt
Construction of a four lanning of internal road of Pehowa Town from 50.860 to 58.880 Km. transferred from NHAI in District Kurukshetra (CM Announcement No. 24196 dated 19.02.2019 ) ( Pehowa Constituency) (Pdg. Shifting of Electrical Poles).
2 documents required · 2 mandatory
₹15,000
₹2.2 L
Yes
24 Jun 2025
14 Jan 2025
29 Jan 2025
15 Jan 2025
28 Jan 2025
15 Jan 2025
Amount
SITC of LT Single Core Cable 120mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `..
SITC of LT Single Core Cable 185 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `..
Dismantle of 8Mtr. PCC Pole complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `..
Dismantle of ACSR 20 mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `..
Dismantle of ACSR 80mm2 Conductor complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `..
Dismantle of PCC Pole 11Mtr. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `..
`SITC of Earthing Rod 8` with GI Strip Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of LT 4 Core Cable 25 mm2 Un-Armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of LT 4 Core Cable 50 mm2 Un-Armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of 2 Core PVC 10mm2 Un-Armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of LT 4 Core Cable 120 mm2 Un-Armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). `
`SITC of 2 Core PVC 10mm2 Armd required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of HT XLPE Cable 3Core 95 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of LT ABC 3Core 95 plus 70 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of MCB 1 in 1 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of Aluminium Thimble required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of Wooden Cleat required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of Bimatlic Clamp required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`SITC of MCB 4 in 1 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works ( As per UHBVN Specification ). ` `..
`Erection of 1 Phase Meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Erection of 4 Core Cable upto 20 Mtr. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Erection of 2Core PVC Armd 10mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Erection of 3 Phase MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Charges for Loading / Unloading including Transportation of 25/63/100KVA Transformer complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Erection of Single Phase MCB 4x1 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Erection of Single Phase MCB 1x1 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Dismantle of LT ABC 95 plus 70mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Dismantle of ACSR 50mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Dismantle of 11KV GO Switch damaged complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Dismantle of 1 Phase Meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Dismantle of 4 Core Cable upto 20 Mtr. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Dismantle of Single Phase MCB 1x1 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Dismantle of Single Phase MCB 4x1 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Dismantle of HT XLPE Cable 50mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of PCC Pole 11 Mtr. Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of ACSR 80mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of T/F Plateform Set with J-Bolt required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of Stay set 8` long with Elow and Nuts required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of X - Plate of angle 65x65x6 mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of Stay wire 7/8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of GSL No. 8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of 11KV pin insulator with pin required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of 11KV Disc insulator with fitting Polymer required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of V Shape X Arm 75x40 mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of Top Hamper required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of Earthing Rod 8` Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of GI Channel 75 x 40mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of GI Angle Iron 50x50x6 mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of MS Flat 50x6mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of MS Nut and Bolts All Size required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of LT Single Core Cable 300mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of Suspension Hook required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of LT Fuse Unit Board required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of 11KV GO Switch Comp. 11 Mtr. Pole required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of 11KV Lighting Arrester required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of LT Insulator required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of MS D - Strap required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of Egg Insulator / Disc for Stay required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of Barbed Wire required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of HT XLPE Cable 3Core 185 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of LT ABC 3Core 120 plus 70 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of HT XLPE Cable Box 95 mm2 O/D required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of Danger Plate enameled with clamp required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of PG Clamp 2 bolt for 50/80 mm2 ACSR required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of Phase Plate set of 3 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of M plus 6 Tower C type without peak weight 1695 Kg. GI required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`SITC of Number Plate with clamp required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Erection of 63 KVA T/F with PM Sub Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `..
`Erection of 200 KVA T/F with PM Sub Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of 100 KVA T/F with PM Sub Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of H Pole with 2 Nos. Stay ( 11Mtr.) complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of ACSR 50mm2 ( reused ) complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of HT Concrete Pole 11Mtr. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of ACSR 80mm2 ( Reused ) complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of Guarding complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of 3 Phase meter with MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of 1 Phase meter with MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of 2 Core PVC ( Armd 6 plus Unarmd 6 ) complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of Earthing Set complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of HT Jumpher complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of HT XLPE Cable Box 185 mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Erection of HT T -Off with 1 Stay complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of 100 KVA T/F with PM Sub Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of HT PCC Pole 9 Mtr. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of ACSR 20mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of 200 KVA T/F with PM Sub Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of LT AB Cable 120 plus 70mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of 3 Phase meter with MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of H Pole with 2 Nos. Stay complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of LT PCC Pole 9 Mtr. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of 1 Phase meter with MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of 2Core PVC ( Armd 6 plus Unarmd 6 ) complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Muffing of PCC Pole complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Fabrication charges of Steet items including Painting and Transportation charges upto site of work complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `.
`Dismantle of 25 / 63 KVA T/F with PM Sub Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `
`Cost of numbering on the pole and feeder name in black paint and Circular background in yellow paint of size 8 inch including Paint and labour charges to complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `
M/s JSB Enterprises (BID ID -1207878)
SHREE SAI INTERNATIONAL (BID ID -1204326)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .