| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹111.2 CrAdmitted-Finance | ₹111.2 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DCI Ltd L1 |
|---|---|---|---|---|
| 1.00BOQ Particulars | ||||
| 1.01 | Maintenance Dredging on in-situ basis by deploying the Trailor Suction Hopper Dredger in the areas of Outer Approach Channel, Lagoon (the drawing of the Dredging area enclosed), including Oil Dock Arm, Turning Circle, and in front of K.I.O. Berth (Extension Lagoon). The areas required to be dredged from the existing levels to their minimum designed depths as detailed below. During the course of Dredging if any hard strata encountered, the Dredging Contractor has to deploy Cutter suction dredgers/Bucket Ladder Dredgers or any suitable equipment to clear these hard patches. upto a depth of (-) 8.00 mCD at B.No. 1, and in front of B.No.1 upto Centre Line of O.A.C, (-)12.00 mCD at B.No. 2, (-) 11.00 mCD at B.Nos. 3, (-) 10.50 mCD at B. No. 4 to 7 in the ODA, & 14 (E), (-) 14.00 mCD at B. No. 8 & 12 (-) 12.50 mCD at Berth No. 9, (-) 15.10 mCD at Berth Nos. 14 (W), 15, 16 , 10, 11, & 13.
The outer approach channel is of total length 7500 mts. (towards sea which depends upon the shifting of the (-) 15.40 m contour due to siltation).
Maintenance dredging of all these areas involves dredging in all types of soil comprising of fine silt, sand, hard/ stiff clay, any hard strata encountered due to settlement of fine silt, sand etc. The material so dredged is to be transported and dumped at the Designated dumping ground located at a distance of 7.00 Kms. towards North-west direction from the intersection point of the outer approach channel with (-) 15.40 mtrs. contour line ( the drawing of the dumping ground enclosed). including Mobilisation & De-mobilisation charges for TSHD including Survey launch, routine boat and hire charges of all plant & equipment, cost of labour, materials and consumables etc. complete for the satisfaction completion of the Dredging work.
Quantity for First year= 65,00,000 Cum
Quantity for second year= 65,00,000 Cum
Quantity for third year= 65,00,000 Cum | 1,95,00,000 | Cum | - |
| 1.02 | Dredging on In-situ Basis by using any special dredging equipment viz., Grab/ Cutter/ Bucket/Plough etc. with allied equipments to dredge/clear the area within 0 to 7 mts. from the berth face whenever the berth is vacant without affecting the port operations from the existing levels in all types of soils comprising of sand, silt deposits of spillage of iron ore / mines, fallen wooden logs, tyres, fenders, boulders, rock /concrete pieces, debries, steel plates, chains, wire ropes, cement bags, tarpaulins, etc.
upto a depth of (-) 8.00 mCD at B.No. 1, and in front of B.No.1 upto Centre Line of O.A.C, (-)12.00 mCD at B.No. 2, (-) 11.00 mCD at B.Nos. 3, (-) 10.50 mCD at B. No. 4 to 7 in the ODA, & 14 (E), (-) 14.00 mCD at B. No. 8 & 12 (-) 12.50 mCD at Berth No. 9, (-) 15.10 mCD at Berth Nos. 14 (W), 15, 16 , 10, 11, & 13. without damaging the existing structures, fenders etc. and dumping the dredged material at deeper areas away from the berth face and the same shall be dredged /cleared simultaneously by TSHD and dumped at the same designated dumping ground, at a distance about 7.00 K.M towards North-west direction from the intersection point of (-) 15.40 mtrs. Contour in the Centre line of the Outer Approach Channel including Mobilisation & De-mobilisation charges for TSHD including Survey launch, routine boat and hire charges of all plant & equipment, cost of labour, materials and consumables etc., and transporting and dumping the dredged material in the designated dumping ground. For satisfaction completion of the Dredging work
Qty. for First year = 52,000 Cum
Qty. for Second year = 52,000 Cum
Qty. for Third year = 52,000 Cum | 1,56,000 | Cum | - |
| 1.03 | Diving Charges to collect Sea Bed Samples
Qty. for First year= 12 Hrs Qty. for second year = 12 Hrs
Qty. for Third year = 12 Hrs | 36 | Hrs | - |
| 1.04 | Dredging all type of soils including sand, silt, loose clay and hard/stiff clay below the Deck Structure area of Pump House No 1, 2 & 3 from the existing level to (-) 6.00mCD for 1 & 2 and (-) 10.00mCD for Pump house No.3 with a tolerance of + 0.5mts including slope and to discharge dredged material to the dock arm areas uniformly beyond a lead of 150m as directed by the Engineer-in-charge by deploying a Circle pump Dredger 250 Cum. Per hour output or a suction pump dredger or any other suitable method including cost of labor, mobilization demobilization etc., complete for successful completion of work.
Qty. for First year = 10,900 Cum
Qty. for second year = 10,900 Cum
Qty. for Third year = 10,900 Cum | 32,700 | Cu.m | - |
Tender Value
₹112.1 Cr
EMD Value
₹1.4 Cr
Closing Date
15 Jul 2020, 3:00 pmClosed
Chief Engineer-C
NMPT Panambur.
Post Monsoon maintenance dredging at New Mangalore Port for the year 2020-21, 2021-22 and 2022-23
2020_NMPT_560784_1
CIVIL/CE-C/EE-C/09/2019-20
Open Tender
Civil Works
120 days
NMPT wharf area
As per Tender document
6 documents required · 6 mandatory
₹1,680
FA and CAO, NMPT
₹1.4 Cr
CE-C NMPT Mangalore
29 Jul 2020
27 May 2020
16 Jul 2020
27 May 2020
15 Jul 2020
26 Jun 2020
27 May 2020 - 9 Jun 2020
10 Jun 2020
Amount
BOQ Particulars
Maintenance Dredging on in-situ basis by deploying the Trailor Suction Hopper Dredger in the areas of Outer Approach Channel, Lagoon (the drawing of the Dredging area enclosed), including Oil Dock Arm, Turning Circle, and in front of K.I.O. Berth (Extension Lagoon). The areas required to be dredged from the existing levels to their minimum designed depths as detailed below. During the course of Dredging if any hard strata encountered, the Dredging Contractor has to deploy Cutter suction dredgers/Bucket Ladder Dredgers or any suitable equipment to clear these hard patches. upto a depth of (-) 8.00 mCD at B.No. 1, and in front of B.No.1 upto Centre Line of O.A.C, (-)12.00 mCD at B.No. 2, (-) 11.00 mCD at B.Nos. 3, (-) 10.50 mCD at B. No. 4 to 7 in the ODA, & 14 (E), (-) 14.00 mCD at B. No. 8 & 12 (-) 12.50 mCD at Berth No. 9, (-) 15.10 mCD at Berth Nos. 14 (W), 15, 16 , 10, 11, & 13. The outer approach channel is of total length 7500 mts. (towards sea which depends upon the shifting of the (-) 15.40 m contour due to siltation). Maintenance dredging of all these areas involves dredging in all types of soil comprising of fine silt, sand, hard/ stiff clay, any hard strata encountered due to settlement of fine silt, sand etc. The material so dredged is to be transported and dumped at the Designated dumping ground located at a distance of 7.00 Kms. towards North-west direction from the intersection point of the outer approach channel with (-) 15.40 mtrs. contour line ( the drawing of the dumping ground enclosed). including Mobilisation & De-mobilisation charges for TSHD including Survey launch, routine boat and hire charges of all plant & equipment, cost of labour, materials and consumables etc. complete for the satisfaction completion of the Dredging work. Quantity for First year= 65,00,000 Cum Quantity for second year= 65,00,000 Cum Quantity for third year= 65,00,000 Cum
Dredging on In-situ Basis by using any special dredging equipment viz., Grab/ Cutter/ Bucket/Plough etc. with allied equipments to dredge/clear the area within 0 to 7 mts. from the berth face whenever the berth is vacant without affecting the port operations from the existing levels in all types of soils comprising of sand, silt deposits of spillage of iron ore / mines, fallen wooden logs, tyres, fenders, boulders, rock /concrete pieces, debries, steel plates, chains, wire ropes, cement bags, tarpaulins, etc. upto a depth of (-) 8.00 mCD at B.No. 1, and in front of B.No.1 upto Centre Line of O.A.C, (-)12.00 mCD at B.No. 2, (-) 11.00 mCD at B.Nos. 3, (-) 10.50 mCD at B. No. 4 to 7 in the ODA, & 14 (E), (-) 14.00 mCD at B. No. 8 & 12 (-) 12.50 mCD at Berth No. 9, (-) 15.10 mCD at Berth Nos. 14 (W), 15, 16 , 10, 11, & 13. without damaging the existing structures, fenders etc. and dumping the dredged material at deeper areas away from the berth face and the same shall be dredged /cleared simultaneously by TSHD and dumped at the same designated dumping ground, at a distance about 7.00 K.M towards North-west direction from the intersection point of (-) 15.40 mtrs. Contour in the Centre line of the Outer Approach Channel including Mobilisation & De-mobilisation charges for TSHD including Survey launch, routine boat and hire charges of all plant & equipment, cost of labour, materials and consumables etc., and transporting and dumping the dredged material in the designated dumping ground. For satisfaction completion of the Dredging work Qty. for First year = 52,000 Cum Qty. for Second year = 52,000 Cum Qty. for Third year = 52,000 Cum
Diving Charges to collect Sea Bed Samples Qty. for First year= 12 Hrs Qty. for second year = 12 Hrs Qty. for Third year = 12 Hrs
Dredging all type of soils including sand, silt, loose clay and hard/stiff clay below the Deck Structure area of Pump House No 1, 2 & 3 from the existing level to (-) 6.00mCD for 1 & 2 and (-) 10.00mCD for Pump house No.3 with a tolerance of + 0.5mts including slope and to discharge dredged material to the dock arm areas uniformly beyond a lead of 150m as directed by the Engineer-in-charge by deploying a Circle pump Dredger 250 Cum. Per hour output or a suction pump dredger or any other suitable method including cost of labor, mobilization demobilization etc., complete for successful completion of work. Qty. for First year = 10,900 Cum Qty. for second year = 10,900 Cum Qty. for Third year = 10,900 Cum
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.02 MB
Mtcdredging2021TD.pdf
Tender Documents • 1.90 MB
BOQ_588876.xls
BOQ • 0.21 MB
Download all tender documents and submit your bid