Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.9 LAccepted-AOC | ₹46.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹47.6 LRejected-Finance | ₹47.6 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹48.7 LRejected-AOC | ₹48.7 L | L3 | Rejected-AOC L2 |
| 4 | L4₹51.6 LRejected-Finance | ₹51.6 L | L4 | Rejected-Finance 4th Lowest |
| 5 | L5₹52.3 LRejected-Finance | ₹52.3 L | L5 | Rejected-Finance 5th Lowest |
| Sl No | Description | Qty | Unit | UK MOHAMMED L1 | MOOSA KALEEM L4 | prakash a L2 | ABOOBACKER SIDDIK S U L7 | K.M MUJEEB RAHIMAN L5 | SURAKATH C.A L8 | ABDUL KHADER B A L3 | MOHAMMED HANEEF L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00APPENDIX A | |||||||||||
| 1.00 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means | 0.04 | Hectare | 1,34,851.65 ₹5,124.36 | 1,33,381.79 ₹5,068.51 | 1,50,000 ₹5,700 | 1,38,451.92 ₹5,261.17 | 1,37,119.4 ₹5,210.54 | 1,00,000 ₹3,800 | 1,27,574.98 ₹4,847.85 | 1,37,818.96 ₹5,237.12 |
| 1.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 271.6 | cum | 62 ₹16,839.20 | 72.68 ₹19,739.89 | 55 ₹14,938 | 63.68 ₹17,295.49 | 63.07 ₹17,129.81 | 75 ₹20,370 | 58.68 ₹15,937.49 | 63.39 ₹17,216.72 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 84.88 | cum | 5,150 ₹4.4 L | 5,600 ₹4.8 L | 5,200 ₹4.4 L | 5,747.54 ₹4.9 L | 5,692.22 ₹4.8 L | 4,900 ₹4.2 L | 5,296.01 ₹4.5 L | 5,721.26 ₹4.9 L |
| 1.00 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 710.13 | cum | 5,900 ₹41.9 L | 6,500 ₹46.2 L | 6,000 ₹42.6 L | 6,652.93 ₹47.2 L | 6,588.9 ₹46.8 L | 6,900 ₹49.0 L | 6,130.27 ₹43.5 L | 6,622.52 ₹47.0 L |
| 1.00 | OD57681/2025-2026:Providing PVC ,75mm dia Weepholes for retaining walls and cuiverts etc complete as per drawing and technical specification | 410 | 1 meter | 112 ₹45,920 | 100 ₹41,000 | 100 ₹41,000 | 114.02 ₹46,748.20 | 112.93 ₹46,301.30 | 100 ₹41,000 | 105.07 ₹43,078.70 | 113.5 ₹46,535 |
Tender Value
₹63.5 L
EMD Value
₹50,000
Closing Date
14 Nov 2025, 4:00 pmClosed
Executive Engineer
Office of Executive Engineer PWD Roads Division Kasaragod
earthwork, PCC 1 3 6, M15 grade PCC, weep holes
2025_PWD_820095_1
D5-TD/35/E tender/2025-26
Open Tender
Civil Works - Roads
Manjeshwar
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
Yes
27 Mar 2026
7 Nov 2025
17 Nov 2025
7 Nov 2025
14 Nov 2025
7 Nov 2025
Amount
APPENDIX A
2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
OD57681/2025-2026:Providing PVC ,75mm dia Weepholes for retaining walls and cuiverts etc complete as per drawing and technical specification
prakash a (BID ID -2438698)
ABDUL KHADER B A (BID ID -2438076)
MOOSA KALEEM (BID ID -2438641)
K.M MUJEEB RAHIMAN (BID ID -2438951)
MOHAMMED HANEEF (BID ID -2438407)
ABOOBACKER SIDDIK S U (BID ID -2438824)
SURAKATH C.A (BID ID -2438438)
Bidder Name
UK MOHAMMED
MOHAMMED HANEEF
K.M MUJEEB RAHIMAN
MOOSA KALEEM
prakash a
ABDUL KHADER B A
ABOOBACKER SIDDIK S U
SURAKATH C.A
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
BOQ_1374970.xls
BOQ • 0.30 MB
PreliminaryAgreement.pdf
Other Document • 1.37 MB
IntegrityPactandFormofTender.pdf
Other Document • 0.24 MB
affidavit.pdf
Other Document • 0.02 MB
epaymentform.pdf
Other Document • 0.26 MB
Download all tender documents and submit your bid