Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹3.5 L+₹7,020 (2.03%)Qualified 201 202 LALA 1 LANDMARK MG ROAD HYDERABAD HYDERABAD | L2 | Qualified | |
| 2 | L3₹3.7 L+₹26,220 (7.58%)Not Evaluated ANS METRO MALL 2ND FLOOR ANS METRO MALL TUGHLAKABAD TUGHLAKABAD SOUTH DELHI DELHI 110044 | SOUTH EAST DELHI | DELHI | 110044 | L3 | Not Evaluated | |
| 3 | L4₹3.8 L+₹29,556 (8.55%)Not Evaluated 1492 RAVINDRA NAGAR STREET NO 3 BAREILLY BAREILLY UTTAR PRADESH 243001 | BAREILLY | UTTAR PRADESH | 243001 | L4 | Not Evaluated | |
| 4 | L5₹3.8 L+₹29,976 (8.67%)Not Evaluated B 35 RIDDHI SIDDHI APPARTMENT OPP AJANTA ELLORA FLAT DRIVE IN ROAD THALTEJ AHMEDABAD GUJARAT 380054 | AHMADABAD | GUJARAT | 380054 | L5 | Not Evaluated | |
| 5 | L6₹3.8 L+₹35,640 (10.3%)Not Evaluated 413 GAUTIYA RAJPUR KALAN ALIGANJ BAREILLY UTTAR PRADESH 243302 | BAREILLY | UTTAR PRADESH | 243302 | L6 | Not Evaluated |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
3 Oct 2025, 6:00 pmClosed
Split Air Conditioner Including Green AC
Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6718972 Dated : 23-09-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8391644
GEM/2025/B/6718972
Single Packet Bid
Split Air Conditioner Including Green AC
15 days
Visakhapatanam, Andhra Pradesh
Total value wise evaluation
PRODUCT
Exempted
23 Sept 2025
23 Sept 2025
3 Oct 2025
Split Air Conditioner Including Green AC
Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6718972 Dated : 23-09-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8391644.pdf
GEM_BID
green_room_air_conditioner_specifications_-draft-_d_2024-05-01-11-50-44_6dc927f8627fd0e694ecf3e91a001743.pdf
SPECIFICATION
stc_-version_2-_split_air_conditioner_including_gre_2024-06-26-16-57-37_efdc88d6a009d5c093d94097cf97cbc4.pdf
OTHER
requirements_for_oem_status_against_the_category_-__2024-05-01-12-38-10_42eb1899ef2d07820095ebe48910a901.pdf
OTHER
OM_energy_ElecAppl.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .