| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-Finance | L1 | Accepted-Finance Lowest Vendor | |
| 2 | L2₹20.9 L+₹64,380 (3.18%)Rejected-Finance | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹21.9 L+₹1.7 L (8.21%)Rejected-Finance | L3 | Rejected-Finance Being not L1 | |
| 4 | L4₹23.5 L+₹3.2 L (15.9%)Rejected-Finance 66 6 410 1 MULAGANDA HOUSING COLONY GAJUWAKA DEPOT VISAKHAPATNAM 530026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L4 | Rejected-Finance Being not L1 | |
| 5 | L5₹30.0 L+₹9.8 L (48.3%)Rejected-Finance DOOR NO 15 1 141 BHAVANA ENCLAVE 1 NEAR HOTEL GRAND BAY MAHARANIPETA NOWAROJI ROAD VISAKHAPATNAM 530002 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530002 | L5 | Rejected-Finance Being not L1 |
| Sl No | Description | Qty | Unit | S.M.Electricals L7 | AR POWER INFRA PVT LTD L9 | SRIESWARI ENTERPRISES L5 | M/s.Raghava Enterprises L2 | AYYAPPA CONSTRUCTIONS L8 | VEEKSHITH ENTERPRISES L3 | B.Veerabhadra Rao L6 | GVR CONSTRUCTIONS L4 | SRI LAKSHMI ENGINEERING ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for cleaning of clarifier cum sedimentation tank after every three month including dewatering by pump set to drain out chamber and removing upto 5 feet dirt, sediments etc., by using wire brush and other means from clarifier /inner/outer side walls inside/out-side chamber of clarifier including applying one coat of white wash on walls of clarifier complete all as specified and as directed (clarifier -01 No.)
Note :Each time cleaning of each clarifier cum sedimentation tank shall be considered as one Job | 4 | Job | 22,000 ₹88,000 | 23,000 ₹92,000 | 21,000 ₹84,000 | 22,000 ₹88,000 | 28,000 ₹1,12,000 | 20,500 ₹82,000 | 20,200 ₹80,800 Lowest | 21,000 ₹84,000 | 25,000 ₹1,00,000 |
| 2.00 | Material and labour for cleaning semi underground sump of 2.5 lakhs gallon capacity (Main pump house) after every six month including removing all scales, dirt and sediments etc., by using wire brush or other means from the floor and side walls of semi under-ground sump including washing the entire sump with bleaching powder and apply one coat of white wash to the inner side walls complete all as specified and as directed
(Sump2.5 5 GLN-04 Nos)
Note :Each time cleaning of each semi underground sump shall be considered as one Job | 8 | Job | 18,000 ₹1,44,000 | 19,000 ₹1,52,000 | 17,600 ₹1,40,800 | 15,000 ₹1,20,000 | 45,000 ₹3,60,000 | 13,900 ₹1,11,200 | 16,500 ₹1,32,000 | 15,000 ₹1,20,000 | 12,500 ₹1,00,000 Lowest |
| 3.00 | All as per item No 2.00 above, but for under ground water sump capacity up to 0.8 lakhs ltrs (Bldg No SSS,DSC Block,DAS,20 MOUT,).(04 Nos) | 8 | Job | 9,000 ₹72,000 | 9,100 ₹72,800 | 8,500 ₹68,000 | 8,000 ₹64,000 | 10,000 ₹80,000 | 6,100 ₹48,800 | 8,300 ₹66,400 | 7,500 ₹60,000 | 4,000 ₹32,000 Lowest |
| 4.00 | All as per item No 2.00 above, but for under ground water sump capacity up to 2.27 lakhs ltrs (west wall sump,10 berth sump,old dock sump).(03 Nos ) | 6 | Job | 7,500 ₹45,000 | 7,600 ₹45,600 | 7,200 ₹43,200 | 10,000 ₹60,000 | 30,000 ₹1,80,000 | 6,600 ₹39,600 | 6,800 ₹40,800 | 15,000 ₹90,000 | 5,000 ₹30,000 Lowest |
| 5.00 | All as per item No 2.00 above, but for under ground water sump capacity up to 1.5 lakhs ltrs (Low lift sump ).(01 No.) | 2 | Job | 7,500 ₹15,000 | 7,600 ₹15,200 | 7,200 ₹14,400 | 8,000 ₹16,000 | 25,000 ₹50,000 | 4,800 ₹9,600 | 6,800 ₹13,600 | 10,000 ₹20,000 | 3,500 ₹7,000 Lowest |
| 6.00 | All as per item No 2.00 above, but for under ground water sump capacity up to 1.25 lakhs ltrs (DMC sump ).(01 No) | 2 | Job | 6,003 ₹12,006 | 6,500 ₹13,000 | 5,500 ₹11,000 | 4,000 ₹8,000 | 25,000 ₹50,000 | 3,700 ₹7,400 | 5,500 ₹11,000 | 8,000 ₹16,000 | 2,500 ₹5,000 Lowest |
| 7.00 | All as per item No 2.00 above, but for over head reservoir of capacity 1.25 lakhs gallons.(hill top) (06 Nos) | 12 | Job | 8,901 ₹1,06,812 | 9,000 ₹1,08,000 | 8,800 ₹1,05,600 | 8,000 ₹96,000 | 26,000 ₹3,12,000 | 6,300 ₹75,600 | 8,800 ₹1,05,600 | 14,500 ₹1,74,000 | 3,500 ₹42,000 Lowest |
| 8.00 | All as per item No 2.00 above, but for over head tank capacity 1.25 lakhs ltrs (DMC, , 15 Bldg).(02 Nos) | 4 | Job | 6,901 ₹27,604 | 7,100 ₹28,400 | 6,800 ₹27,200 | 3,000 ₹12,000 | 26,000 ₹1,04,000 | 3,500 ₹14,000 | 6,600 ₹26,400 | 13,500 ₹54,000 | 2,500 ₹10,000 Lowest |
| 9.00 | All as per item No 2.00 above, but of 1.25 lakhs ltrs capacity O/H tank. (Recycle Tank) (01 No) | 2 | Job | 6,901 ₹13,802 | 7,100 ₹14,200 | 6,800 ₹13,600 | 7,000 ₹14,000 | 26,000 ₹52,000 | 5,100 ₹10,200 | 6,600 ₹13,200 | 15,000 ₹30,000 | 2,500 ₹5,000 Lowest |
| 10.00 | All as per item No 2.00 above, but for over head tank capacity 2.27 lakhs ltrs (West wall O/H,10 berth O/H, slipway O/H) (03 Nos). | 6 | Job | 8,001 ₹48,006 | 8,500 ₹51,000 | 7,900 ₹47,400 | 7,000 ₹42,000 | 30,000 ₹1,80,000 | 7,400 ₹44,400 | 7,600 ₹45,600 | 18,500 ₹1,11,000 | 3,000 ₹18,000 Lowest |
Tender Value
₹35.0 L
EMD Value
₹70,080
Closing Date
21 Nov 2025, 6:30 pmClosed
GE (I) DM Visakhapatnam
GE (I) DM Visakhapatnam
MAINTENANCE REPAIR AND CLEANING OF FRESH WATER UG SUMPS OH TANKS CLEANING OF CLARIFIERS AND ALLIED WORKS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE(I) DM VISAKHAPATNAM
2025_MES_737991_1
8303/E8
Open Tender
Civil Works
Item Rate
330 days
Naval Dockyard Visakhapatnam
As per tender document
8 documents required · 8 mandatory
₹500
GE (I) DM VISAKHAPATNAM
₹70,080
Yes
2 Jan 2026
31 Oct 2025
24 Nov 2025
31 Oct 2025
21 Nov 2025
14 Nov 2025
1 Nov 2025 - 12 Nov 2025
Amount
Material and labour for cleaning of clarifier cum sedimentation tank after every three month including dewatering by pump set to drain out chamber and removing upto 5 feet dirt, sediments etc., by using wire brush and other means from clarifier /inner/outer side walls inside/out-side chamber of clarifier including applying one coat of white wash on walls of clarifier complete all as specified and as directed (clarifier -01 No.) Note :Each time cleaning of each clarifier cum sedimentation tank shall be considered as one Job
Material and labour for cleaning semi underground sump of 2.5 lakhs gallon capacity (Main pump house) after every six month including removing all scales, dirt and sediments etc., by using wire brush or other means from the floor and side walls of semi under-ground sump including washing the entire sump with bleaching powder and apply one coat of white wash to the inner side walls complete all as specified and as directed (Sump2.5 5 GLN-04 Nos) Note :Each time cleaning of each semi underground sump shall be considered as one Job
All as per item No 2.00 above, but for under ground water sump capacity up to 0.8 lakhs ltrs (Bldg No SSS,DSC Block,DAS,20 MOUT,).(04 Nos)
All as per item No 2.00 above, but for under ground water sump capacity up to 2.27 lakhs ltrs (west wall sump,10 berth sump,old dock sump).(03 Nos )
All as per item No 2.00 above, but for under ground water sump capacity up to 1.5 lakhs ltrs (Low lift sump ).(01 No.)
All as per item No 2.00 above, but for under ground water sump capacity up to 1.25 lakhs ltrs (DMC sump ).(01 No)
All as per item No 2.00 above, but for over head reservoir of capacity 1.25 lakhs gallons.(hill top) (06 Nos)
All as per item No 2.00 above, but for over head tank capacity 1.25 lakhs ltrs (DMC, , 15 Bldg).(02 Nos)
All as per item No 2.00 above, but of 1.25 lakhs ltrs capacity O/H tank. (Recycle Tank) (01 No)
All as per item No 2.00 above, but for over head tank capacity 2.27 lakhs ltrs (West wall O/H,10 berth O/H, slipway O/H) (03 Nos).
All as per item No 2.00 above, but of 2.5 lakhs ltrs capacity collection chamber with channel (01 No)
All as per item No 2.00 above, but of .5 lakhs ltrs capacity of back wash tank above filter bed bldg (01 No.)
All as per item No 2.00 above, but of water chanel 1.2 lakh ltr cap from filter bed to low lift pump house.
All as per item No 2.00 above, but weekly cleaning ,removing of all muds of filter back wash chanel including recycle tank at filter plant
Chemical and biological testing of raw water from NABL accredited laboratory and submit the test report to the Engineer-in-charge complete all as specified and as directed (sample to be collected from inlet source at FWPH)
Chemical and biological testing of treated water from NABL accredited laboratory and submit the test report to the Engineer-in-charge complete all as specified and as directed (sample to be collected from outlet source at FWPH)
Cleaning weekly entire pumping installation bldgs inside & outside walls, ceiling, floor, cable trench, pathway, doors, windows, drains by brooming removing webs,cleaning of floors with wiper ,cutting/cleaning of wild vegitation etc in and around water supply installation premises and location including disposal of spoil to a distance not excluding 50mtr outside the installation for the SSS fire pump house complete all as specified and as directed
All as per item No.17.00 above but for DSC fire pump house
All as per item No.17.00 above but for 20 Mout fire pump house
All as per item No.17.00 above but for DMC pump house
All as per item No.17.00 above but for West wall pump house
All as per item No.17.00 above but for 10 berth pump house
Cleaning of entire Fresh water pump house complex daily comprising Pump house office, SCADA Room, Main Pump House, Filter House, Low lift Pump House, Chlorine room, 5 LG Sump-2 Nos, Clarifier, Recycle tank, Recycle pump house, including removing of wild vegitaion around buildings, building internal cleaning of wall, roof, floor, maintenance and dressing of entire garden around buildings, watering of plants, cleaning of all outside walls of valve chambers, retaining wall, 5LG sump outside walls trimming of grass/wild vegitation inside entire pump house complex.
M&L for cleaning of filter bed wall, bed wash channel,washout channel, inner and outer wall of clarifier,Alumn mixing chamber, Raw water channel including removing fungus on wall/ full of all channel every day basis complete all as specified and as directed
Removing fungus from recyle tank / channel and removing mud from suction well channel and including filter plant drain out chamber on every alternate days basis complete all as specified and as directed.
Attending electrical complaints of electrical pump set/ starters/LT panels provided inside Dockyard , decarbonizing the , replacing lugs, wornout screws, nuts, bolts and washers, tightening the loose connections whereever required and restore the power supply complete all as specified and as directed. Note : (i) Replacement of spares viz meters /CTs, MCCB, contracts, breakers, ACBs, starters will be measured and paid for separately as supply only and labour element for taking down the replaced spares shall be deemed to include in the unit rate quoted. (ii) The contractor has to engage qualified electricians and helpers in sufficient Nos to attend and rectify the defects.
Supply only MCCB, 3 pole, 250 amp, 36 KA braking capacity, Ics = 100% Icu as per IEC 60947-2, with Thermal magnetic release complete all as specified and directed. Make- Schneider cat Part No- LV432893 or equivelent of Legrand/ABB
Supply only MCCB, 3 pole, 100 amp, 25 KA braking capacity, Ics = 100% Icu as per IEC 60947-2, with Thermal magnetic release complete all as specified and directed. Make- Schneider cat Part No- LV432693 or equivelent of Legrand/ABB
M&L for Painting after preparation of old painted external wall surface of valve pits with one coat of white wash every alternate 30 days all as specified and directed.
M&L for Painting after preparation of old painted external wall surface of pole copings with one coat of white wash every alternate 30 days all as specified and directed.
M&L for painting after preparation of old painted external wall surface, plastered or unplastered with one coat of white wash complete all as specified and as directed
M&L for Painting of old painted steel surface incl necessary preparation of 20 HP / 150 HP pump set with one coat of synthetic enamel paint complete all as specified and as directed
M&L for painting of old painted steel surface incl necessary preparation of 1 HP to 10 HP pump set with one coat of synthetic enamel paint complete all as specified and as directed
Supply & Fix Rubber insulating mat 2mm thick, upto 3.3 KV complete all as specified and as directed
Cutting/cleaning of wild vegetation etc in and around water supply installation/hill top reservoir premises and location including disposal of spoil note a distance not excluding 50 mtr outside the installation complete all as specified and as directed
Supply fixing testing and commissioning of XLPE insulated, armoured heavy duty electric cable with copper conductor, 1100volts grade including copper lugs with new nuts/botls etc, cross-sectional area 95sqmm 3.0 core incl dismantling taking down unsv aluminium cable into schedule of credit from wall,cable tray,trench complete all as specified and as directed
M/s.Raghava Enterprises (BID ID -3479595)
VEEKSHITH ENTERPRISES (BID ID -3479812)
GVR CONSTRUCTIONS (BID ID -3479581)
SRIESWARI ENTERPRISES (BID ID -3479568)
B.Veerabhadra Rao (BID ID -3478119)
S.M.Electricals (BID ID -3478502)
AYYAPPA CONSTRUCTIONS (BID ID -3479696)
AR POWER INFRA PVT LTD (BID ID -3479554)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_826343.xls
BOQ • 0.27 MB
8303Tender.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .