Tender Value
₹11.4 L
EMD Value
₹12,000
Closing Date
27 Oct 2026, 6:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Sipu Project Division, Palanpur
ERM Work For RBMC and Its Network of Mukteshwar Irrigation Scheme Year 2026-27
356853
Short Notice No : 2 of 2026-27
Open
Civil Works - Canal
Works
Banaskantha
7 documents required · 6 mandatory · 1 optional
₹900
Executive Engineer Sipu Project Division Palanpur
₹12,000
19 Oct 2026
19 Oct 2026
19 Oct 2026
27 Oct 2026
19 Oct 2026
BILL OF QUANTITIES
Name of Work :- ERM Work For RBMC and It's Network of Mukteshwar Irrigation
Scheme Year 2026-27
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
1 Clearing the shrubs like Akdas, weeds & other vegetation
including depositing the same outside and buring etc.
complete from canal bed and both slope of banks etc.
complete. for canal & drain (b) 0.56 to 7.00 Cumec
(c) Below 0.56 Cumec 1.46 Km 5917.000
2 Jangle clearance of specified Categary and bushes for
canal/dam work as directed with disposing material etc
complete ( Excluding tree of girth above 0.50 mt) (b) For
3 Clearing silt from canal /drain bed by digging the same to
the required bed level and gradiant including depositing
the excavated earth regularly in spoil bank for utilising the
same for preparing the bund after breaking clods as and 1447.00 Cu.M. 177.500
where directed for lead up to 200 m & lift up to 3 m as
under ( excluding weed cutting ) (b) For Canal 20 to
(a) For canal below 20 Cusecs. 197.10 Cu.M. 147.900
4 Excavation in all sorts of soil (including wet and slushy
condition of soil) with yellow, sandy, gravelly soil
including soft murrum & H.M. including sorting & stacking
and depositing the excavated stuff in uniform layers as
and where directed upto lead of 30 m and lift as shown
below including clearing the site etc. complete. (including
dewatering) (B) For foundation trenches of C.D. work (a)
0 to 3 Mt. depth
5 Providing and laying foundation concrete of proportion as
under by using cement, sand and machine crushed course
aggregate laid in situ including necessary temping, 7.20 Cu.M. 3424.300
smooth finishing, watering and curing as directed with all
leads and lifts etc complete. (a) PCC 1:3:6
6 Providing and laying CC 1:2:4 grade using cement, sand
and crushed metal incuding providing and erecting
necessary form work, centering,vibrating, smooth 28.80 Cu.M. 4873.400
finishing,watering and curing as directed with all leads
and lifts etc complete. (a) Sub structures
7 Providing and laying 7.5 cms thick cast in situ cement
concrete 1:2:4 grade with the use of crushed aggregates
for canal lining works including use of all equipments,
scaffolding, centering form work etc, with finishing as 589.00 Sq.Mt. 344.100
required to the exposed surface,making asphalt joints as
directed and watering and curing ( without sleepers ) with
all lead and lifts etc. comp.
8 Earth work in embankment from borrow pits in all sorts
of soil and soft murrum or other suitable strata as directed
including breaking the clods and dressing to the design
sections including cutting the proud section with lead as
under and all lift including site clearing etc. complete. For
all canal capacity (c) 200 to 1000 Mt.
9 De-silting of various structures of canal and distribution
system including depositing the same as directed with all
lifts and lead for canal syphone,airvent,T.O. Kundies etc.
complete. A) Canal Syphon well
Rupees Eleven Lakh Forty Two Thousand Four Hundred Fifteen Paise Nine Only
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Deputy Executive Engineer Sr. Divisional Accounts Officer Executive Engineer
Mkt. H.W. Sub Dn. No-1 Sipu Project Division Sipu Project Division
Mukteshwar Palanpur Palanpur
B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1. The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change
as per actual mix design the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Sr. Divisional Accounts Officer Executive Engineer
Mkt. H.W. Sub Dn. No-1 Sipu Project Division Sipu Project Division
Mukteshwar Palanpur Palanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD ERM RBMC 26-27.pdf
BOQ ERM RBMC 26-27.pdf
Notice No -2 of 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .