Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.9 LAdmitted-Finance 42 M G ROAD BADAMTALA PO JOKA PS HARIDEVPUR KOLKATA 700104 | 24 PARAGANAS SOUTH | WEST BENGAL | 700104 | L1 | Admitted-Finance | |
| 2 | L2₹75.0 L+₹16.1 L (27.3%)Admitted-Finance DABGRAM COLONY 1 P O RABINDRA SARANI SILIGURI | SILIGURI | WEST BENGAL | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | UNITED CONSTRUCTION L1 | ROYAL ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00ETP sludge discharge line Laying job | |||||
| 1.01 | Soil,ash excavation for pipe line
laying in all sorts of soil including removing, spreading or stacking the soils as directed | 1,170 | Cubic Meter | 110 ₹1,28,700 Lowest | 150 ₹1,75,500 |
| 1.02 | Shifting & Transportation of removed ash
/soil By Truck with Loading & Unloading by Head up to 3000 mtr | 1,100 | Cubic Meter | 240 ₹2,64,000 Lowest | 350 ₹3,85,000 |
| 1.03 | Filling in foundation or plinth by silver sand in layer not exceeding 150 mm as directed and
consolidating the same by thorough saturation with water ramming complete including the cost of supply of sand. (Payment to be
made on measurement of finished quantity | 139 | Cubic Meter | 702 ₹97,578 Lowest | 920 ₹1,27,880 |
| 1.04 | Construction of Brick Pedestals : Earth cutting,filling,ordinary cement concrete (1:2:4),Brick work (1:4),Shuttering & Plaster
(1:6) | 700 | Number | 3,995 ₹27,96,500 Lowest | 5,150 ₹36,05,000 |
| 1.05 | Road cutting in different places
for laying of 150 NB pipe line | 330 | Cubic Meter | 350 ₹1,15,500 Lowest | 450 ₹1,48,500 |
| 1.06 | Erection of thrust block including
supply of all materials | 30 | Number | 17,000 ₹5,10,000 Lowest | 23,000 ₹6,90,000 |
| 1.07 | Erection of MS 300 NB & above Hume pipe to facilitate the 150 NB D.I pipe laying underneath the road crossing | 200 | Meter | 500 ₹1,00,000 Lowest | 650 ₹1,30,000 |
| 1.08 | Laying of 150 NB D.I. pipe | 1,700 | Meter | 290 ₹4,93,000 Lowest | 310 ₹5,27,000 |
| 1.09 | Earth work in filling in foundation, trenches or plinth with good earth, in layer not exceeding 150mm. Including watering and ramming etc. layer by layer complete.
(Payment to be made on the basis of measurement of finished quality of work.) With earth obtained from excavation of foundation. | 1,730 | Cubic Meter | 80 ₹1,38,400 Lowest | 130 ₹2,24,900 |
Tender Value
₹69.3 L
EMD Value
₹1.4 L
Closing Date
1 Jul 2026, 2:00 pmClosed
General Manager (KTPS)
KTPS,Mecheda,Purba Medinipur, PIN-721137
Laying of 150 NB DI pipe for ETP sludge disposal under CAPEX 2025-2026 by AHP-MM, KTPS
2026_WBPDC_1027852_1
WBPDCL/KTPS/NIT/E3950/26-27
Open Tender
Support/Maintenance Service
Item Rate
365 days
KTPS, Mecheda, PurbaMedinipur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.4 L
Yes
2 Oct 2026
16 Jun 2026
4 Jul 2026
16 Jun 2026
1 Jul 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ETP sludge discharge line Laying job | |||||
| 1.01 | Soil,ash excavation for pipe line
laying in all sorts of soil including removing, spreading or stacking the soils as directed | 1,170 | Cubic Meter | - | - |
| 1.02 | Shifting & Transportation of removed ash
/soil By Truck with Loading & Unloading by Head up to 3000 mtr | 1,100 | Cubic Meter | - | - |
| 1.03 | Filling in foundation or plinth by silver sand in layer not exceeding 150 mm as directed and
consolidating the same by thorough saturation with water ramming complete including the cost of supply of sand. (Payment to be
made on measurement of finished quantity | 139 | Cubic Meter | - | - |
| 1.04 | Construction of Brick Pedestals : Earth cutting,filling,ordinary cement concrete (1:2:4),Brick work (1:4),Shuttering & Plaster
(1:6) | 700 | Number | - | - |
| 1.05 | Road cutting in different places
for laying of 150 NB pipe line | 330 | Cubic Meter | - | - |
| 1.06 | Erection of thrust block including
supply of all materials | 30 | Number | - | - |
| 1.07 | Erection of MS 300 NB & above Hume pipe to facilitate the 150 NB D.I pipe laying underneath the road crossing | 200 | Meter | - | - |
| 1.08 | Laying of 150 NB D.I. pipe | 1,700 | Meter | - | - |
| 1.09 | Earth work in filling in foundation, trenches or plinth with good earth, in layer not exceeding 150mm. Including watering and ramming etc. layer by layer complete.
(Payment to be made on the basis of measurement of finished quality of work.) With earth obtained from excavation of foundation. | 1,730 | Cubic Meter | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.63 MB
BOQ_2524886.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .