| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | ₹1.2 L | L1 | Accepted-AOC l1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical 122040.69 |
| 3 | Rejected-Technical | - | - | Rejected-Technical 122139.85 |
| 4 | Rejected-Technical | - | - | Rejected-Technical 124966.80 |
| Sl No | Description | Qty | Unit | SAJEESH.P L4 | ANWAR CONSTRUCTION L2 | muhhamed musthafa P L1 | Musthafa K P L3 |
|---|---|---|---|---|---|---|---|
| 1.00Well Maintanance | |||||||
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 5.23 | cum | 600 ₹3,138 | 587.4 ₹3,072.10 | 561 ₹2,934.03 | 588.4 ₹3,077.33 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 3.24 | cum | 220 ₹712.80 | 210.7 ₹682.67 | 202.8 ₹657.07 | 212.7 ₹689.15 |
| 1.00 | OD403504/2023-2024:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 3.24 | cum | 3,500 ₹11,340 | 3,467 ₹11,233.08 | 3,307.8 ₹10,717.27 | 3,469.84 ₹11,242.28 |
| 1.00 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 6.33 | cum | 7,000 ₹44,345 | 6,957 ₹44,072.60 | 6,636.01 ₹42,039.12 | 6,961.01 ₹44,098 |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size) | 1.93 | cum | 8,600 ₹16,606.60 | 8,495 ₹16,403.85 | 7,934.96 ₹15,322.41 | 8,504.76 ₹16,422.69 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 154.48 | kilogram | 100 ₹15,448 | 97.68 ₹15,089.61 | 93.19 ₹14,395.99 | 97.69 ₹15,091.15 |
| 1.01 | 51.18.12.6:Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid separately) External work - 50 mm nominal dia | 10.5 | metre | 600 ₹6,300 | 544.9 ₹5,721.45 | 520.5 ₹5,465.25 | 545.94 ₹5,732.37 |
| 1.01 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 57.92 | sqm | 420 ₹24,326.40 | 398.4 ₹23,075.33 | 380.07 ₹22,013.65 | 398.74 ₹23,095.02 |
| 1.01 | OD402835/2023-2024:Supplying and providing readymade GI name board with all conveyance,labour and hire chages etc complete using GI hollow tube of size 80X40X1.4 MM post.40x20x1.4 mm outerframe,0.6 mmthick iron sheet of size 90x60 cm with two coat of enamel painting over a coat of primer,lettering with suitable colour and size,fixing the post in ground with cc 1:2:4 etc complete | 1 | each | 2,750 ₹2,750 | 2,690 ₹2,690 | 2,566.16 ₹2,566.16 | 2,691.86 ₹2,691.86 |
Tender Value
₹1.2 L
EMD Value
₹3,054
Closing Date
24 Dec 2024, 6:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF THE ASSISTANT ENGINEER KULUKKALLUR GP
Re-Annual Plan-Kulukkallur GP, 2023-24,Proj No-239/2023-24- Thiruthiyilppadi Open Well renovation ,Ward - 12
2024_LSGD_716285_31
01/AE/KLR/LSGD/2024-25(1)
Open Tender
Civil Works - Buildings
180 days
KULUKKALLUR GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
₹3,054
KULUKKALLUR GP
27 May 2026
17 Dec 2024
26 Dec 2024
17 Dec 2024
24 Dec 2024
17 Dec 2024
17 Dec 2024 - 19 Dec 2024
17 Dec 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1131955.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid