Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
10 Jul 2026, 12:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
SRDEEG/SEE
16 conditions · 5 needing a document upload
Contractor should have to be registered with Employee Provident Fund Organization (EPFO). It is mandatory for contractor to submit PF code provided by EPFO with their tender offer. Also each contractor has to submit "UAN" of their worker with their offer and have to mention in tender document. It is mandatory. Otherwise offer will not be considered for further action and your offer will summarily be rejected.
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of 'V/N'or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
As per CE/Works/HJP's letter no. ECR-HQ0ENGG(CONT)/0009/2025, dated 18.11.2025 "The balance sheet and all other financial documents attested/certified by the Chartered Accountant (CA) to substantiate fulfillment of Financial Eligibility Criteria should be with UDIN, failing which the offer shall be considered as incomplete and will be summarily rejected without any further reference."
The tenderer shall posses the valid Electrical Contractor's license and Supervisory License issued by any State/Central Govt. licensing board for the required voltage level or above with their tender paper. Tenders without valid electrical contractor's license & Supervisory license will summarily be rejected.
"ELIGIBILITY CRITERIA:- Document required to be submitted in support of Technical Eligibility Criteria: Tenderer should have completed at least one similar single work. The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar nature of works (as defined and approved by competent authority) for " At BJU: - Provision of facilities in TTE Running Rooms at par with that of running rooms of guard/loco pilots" is (1) Repair/maintenance/installation of Centralized Air-cooling system. (2) Repair/maintenance/installation of type AC plant of capacity 15 TR and above. (3) AMC of Centralized AC plant of capacity 15 TR and above. Authority: CEE/ECR/HJP's letter no. ECR/ELE/G/Tender Policy/7046, dtd.17.07.2008
27 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderers whether sole proprietor , a limited company or a partnership firm he/they should submit authentic proof in terms of partnership deed, proprietorship documents etc. along with the tender. If he/they want to act through agent or individual partners should submit a power of attorney duly stamped and authenticated by Notary Public or by Magistrate in favour of specific person whether he/she/they are partners of the firm or any other person specifically authorizing him/her name to submit the tender, sign the agreement , receive money, witness measurements, sign measurement books , compromise, settie, relinquish any claims, preferred by firm and also sign No Claim Certificate and refer all or any disputes arbitration.
Contractor should have to be registered with Employee Provident Fund Organization (EPFO). It is mandatory for contractor to submit PF code provided by EPFO with their tender offer. Also each contractor have to submit "UAN" of their worker with their offer and have to mention in tender document. It is mandatory. Otherwise offer will not be considered for further action and your offer will be summerisely rejected. You are also instructed to submit monthly payment challan to the person/labour engaged for execution of the work having valid UAN no with bill. This is to be followed strictly as per GCC & as per instruction of labour enforcement officer under Govt of India.
Inclusion of 'Letter of Credit' as Mode of Payment in Works Tenders or Service Tenders as per Railway Board's letter no. 2018/CE-I/CT/9 dated 04.06.2016 remarks from Tenderer required.
Eligibility criteria for works tender in respect of partnership firms:-
in case the tenderer is a partnership firm s , the experience, solvency and turn over shall be in the name and style of the firm only.
If the tenderer is a partnership firm, all the partners shall be jointly and severally liable for successful completion of the work and no request for change on the certification of the firm shall be entertained.
During the currency of the contract, no partner of the firm shall be permitted to withdraw from partnership business and in such and event it shall be treated as breach of trust and abandonment of the contract.
JOINT VENTURE will not be permitted for the tenders.
Any Conditional offer will be summarily rejected.
Rates are inclusive of all taxes/GST, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority.
Railway Administration reserves the right to change/Alter/Cancel the tender without any notice.
At BJU: - Provision of facilities in TTE Running Rooms at par with that of running rooms of guard/loco pilots.
L-Open-26-27-05Dt18-06-26
L-Open-26-27-05Dt18-06-26
Open
Works - General
180 Days
Saran, Bihar
₹0
₹2.4 L
10 Jul 2026
18 Jun 2026
26 Jun 2026
82 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,20,41,915.26 | ||
| — | 160.00 | — | — | ||
| Supply of Multi compressor (Rotary/Scroll) outdoor units with condenser unit, fan unit, piping, wiring, connections, control relay units, capacitors, insulated copper piping for condensed gas and liquid suction and delivery copper pipe lines (indoor to outdoor). Infrigerant gas pipe joints and multiooting joints, XLPE insulated copper power cables of suitable sizes for connection with the power panel etc suitable for reversible cycle operations (Heating & Cooling) and filtered fresh air handling/supply system including ducting etc as required for different air conditioners areas. Make LG, Daikin, Bluestar, Hitachi. Here qty. Unit Job stands for TR. | — | — | — | 64,03,520 | |
| — | 80.00 | — | — | ||
| Supply of 2 Tr Hi-wall Indoor units suitable for reversible cycle operation. Make: LG, Daikin, Bluestar, Hitachi. | — | — | — | 24,17,840 | |
| — | 160.00 | — | — | ||
| Installation, testing and commissioning of Multi compressor (Rotary/Scroll) outdoor units with condenser unit, fan unit, piping, wiring, connections, control relay units, capacitors, insulated copper piping for condensed gas and liquid suction and delivery copper pipe lines (indoor to outdoor) infrigerant gas pipe joints and multiooting joints, XLPE insulated copper power cables of suitable sizes for connection with the power panel etc. | — | — | — | 5,92,160 | |
| — | 80.00 | — | — | ||
| Installation, testing and commissioning of Hi-wall indoor units suitable for reversible cycle operation. Make LG, Daikin, Bluestar, Hitachi. | — | — | — | 1,48,000 | |
| — | 180.00 | — | — | ||
| Supply and fixing of PVC drain pipe of 25 MM dia with 6 mm thick nitrile Rubber Insulation tube. Here qty. Unit RM stands for RMT. | — | — | — | 28,620 | |
| — | 180.00 | — | — | ||
| Supply and fabrication of MS angle of suitable size for outdoor unit stand with red- oxide paint (2 layers) and enamelpaints (2 layers). | — | — | — | 16,560 | |
| — | 180.00 | — | — | ||
| Supply, installation, testing and commissioning of power cable for electric supply to panel for indoor units & outdoor units (plant AC). Here qty. Unit RM stands for RMT | — | — | — | 63,180 | |
| — | 350.00 | — | — | ||
| Supply and installation of communication cable. Here qty. Unit RM stands for RMT | — | — | — | 54,950 | |
| — | 1000.00 | — | — | ||
| Wiring of sub-main concealed in PVC heavy guage conduit pipe of size (O.D.) 20 mm make- Malhotra or similar ISI make Finolex, KEI or polycab with ECC 16 SWG/01 sq.mm multi polycab with ECC 16 SWG/01 sqmm multi strand single core flexible copper earth wire. In case of ceiling/beam/column where cutting is not allowed/possible wiring to be done in open conduit/ casing capping by use of drill & roll plug. | — | — | — | 1,70,000 | |
| — | 80.00 | — | — | ||
| Supply, fixing, testing and commissioning of modular AC box with MCB with matching galvanized iron frame and polycarbonate cover plate accommodating 3 module (1x1x3M)suitable for 230, 50 Hz supply Make- Legrand, Havells, Crabtree, Wipro,Cona, Anchor, L&T or equivalent as per IS & IE rules. | — | — | — | 38,240 | |
| — | 12.00 | — | — | ||
| Supply and fixing of 4-way TPN double door MCB DB with 4 pole isolator 80 Amp one no. And 32 Amp 12 Nos. MCB SP with sheet metal enclosed type steel cover with all accessories Make- Legrand, ABB, Siemens. | — | — | — | 76,884 | |
| — | 2.00 | — | — | ||
| Supply and erection of earthing station with GI pipe "B" class TATA/JINDAL/BANSAL of size 6 mts. Long 50 mm minimum dia and provided with alternate layer of charcoal and salt in the earth pipe around the GI pipe and suitable clamping arrangement including supply and connection with 6 SWG GI wire from earth pipe to panel board as per site requirement Bore dia of size 300 mm x 300 mm , digging will be done by auger. Minimum qty of each enhancement material to be supply is 50 Kg.per pit. Minimum qty of each enhancement material to be supply is 50 Kg per pit. | — | — | — | 8,364 | |
| — | 12.00 | — | — | ||
| Supply & fixing of 8 way double door AC MCB distribution board vertical type double door. | — | — | — | 21,300 | |
| — | 96.00 | — | — | ||
| Supply of MCB 6-32A.Make- ABB, L&T, Siemens, Schneider, Legrand, Havells. | — | — | — | 20,376.96 | |
| — | 12.00 | — | — | ||
| Fixing & commissioning of MCB- DB with MCB. | — | — | — | 1,005.6 | |
| — | 1000.00 | — | — | ||
| Wiring for submain along with earth wire with the size 2X4 sq.mm+1X4 sq.mm earth wire of PVC insulated copper conductor, single core cable in concealed/ surface/recessed PVC heavy gauge conduit as required. The work shall be done as per CPWD Pt. I, manual(1972) for general specification of electrical work. All materials should be IS marked. | — | — | — | 1,23,000 | |
| — | 1000.00 | — | — | ||
| Wiring for submain along with earth wire with the size 2X6 sq.mm+1X6 sq.mm earth wire of PVC insulated copper conductor, single core cable in concealed/ surface/recessed PVC heavy gauge conduit as required. | — | — | — | 1,03,000 | |
| — | 4.00 | — | — | ||
| Supply & fix Of 4 Standard/Havells/Benlo/C&S/Samko. | — | — | — | 19,496 | |
| — | — | — | 100A | ||
| — | — | — | cap. | ||
| — | — | — | Make | ||
| — | 4.00 | — | — | ||
| Supply and fixing of 4 pole MCCB 160A with enclosure MCCB 36kA current rating-160 Amp & adjustable overload setting 80%-100%of In, adjustable short circuit setting 6-10 In 4 Pole. | — | — | — | 75,692 | |
| — | 2.00 | — | — | ||
| Making foundation of 500 KVA transformer with ramp as per site in-charge. | — | — | — | 27,060 | |
| — | 2.00 | — | — | ||
| Provision, Fabrication and commissioning of 11 KV 3 phase Gang Operated Switch on the top portion of pre-erected H- pole/4 pole structure capacity 400 Amp conforming to IS: 1818 complete with drop out fuse conforming to ISS-9835 (Pt.II) of 1980 along with mounting channel/angle iron insulator etc. all respect including supply of all required material. | — | — | — | 14,800 | |
| — | 2.00 | — | — | ||
| Erection and fabrication of H-pole structure exceeding 10 mtrs. but not exceeding 13 mtrs. with angle iron 50mm x 50mm x 6mm & 75mm x 40mm x 6mm channel nut bolt etc. Direct in ground including excavation refilling with cement concrete 1 : 3: 6 (Cement, Course sand, 40 mm graded stone nominal size) made foundation with foundation of size 2000 mm x 1000 mm x1000 mm depth and muffing of base foundation of 500 mm x 500 mm x 500 mm with cement concrete as per ration 1:3:6 above the ground level including transportation of rail pole from different location to the site. (only rail pole will be supplied by the railway). | — | — | — | 10,890 | |
| — | 161.00 | — | — | ||
| Supply & laying of 11 KV 3 core 120 mm² XLPE alluminium armored cable on cable tray with suitable clamping arrangement. Make - Polycab, RR Cables, Havells, & KEI. | — | — | — | 3,59,030 | |
| — | 804.00 | — | — | ||
| Supply of XLPE insulated & sheathed arm. Al. conductor stranded 1.1kV grade LT cable of size 4 x 185 sq.mm. | — | — | — | 7,68,624 | |
| — | 955.00 | — | — | ||
| Laying of cable depth of 3' partly underground through suitable trench partly on wall, rail post through suitable clamp inclu. Excavation of cable trench either in rock/soil/concrete and covering by brick (14nos brick per mtr, sand, dressing of soil and connection to panel bd. to DB etc. as per site requirement.) | — | — | — | 1,00,762.05 | |
| — | 6.00 | — | — | ||
| Earthing with copper Plate earthing 600x600x3mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required. | — | — | — | 75,732 | |
| — | 10.00 | — | — | ||
| Supply and making of heat shrinkable outdoor end termination Kit for 11 KV 'E' XLPE 3 core 120 -185 mm² cable. | — | — | — | 1,12,210 | |
| — | 1.00 | — | — | ||
| Supply, Fixing, Testing and commissioning of LT cubical panel board of size 135x195x45 cm and thickness 2mm comprising of following 1) 4 pole 400 Amp capacity 415 volt AC MCCB-01 no. for Incoming make ABB GE Siemens, L&T, Hevells, Standard, 2) 4 pole 100 Amp capacity 415 volt AC MCCB-03 nos fot outgoing maks: ABB, GE, Siemens, LAT, Hevells, Standard, complete in all respect 3) voltmeter (0-500 volt) with selector switch Ammeter range 0-200 Amp grade with selector switch make Kaycee, AE with CT 400/5 of make KAPPA and copper busbar 400 Amp of require size as per panel size of 3 phase and neutral with other accessories complete in all respect. | — | — | — | 64,748 | |
| — | 10.00 | — | — | ||
| GI pipe earthing with 4.5 M long x40mm dia. With salt & charcoal .Make of GI pipe TATA/Jindal or equivalent superior make. | — | — | — | 16,830 | |
| — | 100.00 | — | — | ||
| Supply & Laying of 6SWG GI wire as conductor earth electrode. | — | — | — | 1,032 | |
| — | 4.00 | — | — | ||
| Geyser point with MCB connected of 6 pin 16Amp. power plug socket with 2X 2.5 Sq.mm FR PVC insulated copper conductor single core cable in concealed/surface/recessed PVC insulated copper conduit along 1 no.2.5 sq.mm FR PVC insulated copper conductor single core cable for loop earthing as required. | — | — | — | 3,182 | |
| — | 80.00 | — | — | ||
| Wiring for light point, call bell, fan point/exhaust fan point and 5 A plug point in a concealed with a heavy gauge PVC conduit pipe confirming to IS 9537 (pt.3)/1983 or latest, ISI mark with single core 1.5 Sqmm copper FRLS wire (make - Anchor, Finolex, Havells, KEI, Polycab) complete with controlling modular switches and suitable board of Legrand, Siemens, L&T, Anchor, ABB, Havells, Crabtree make and 16 SWG tinned copper wire as ECC. | — | — | — | 40,320 | |
| — | 35.00 | — | — | ||
| Supply and fixing of 5 pin 5 Amp Modular switch & socket, L&T, Legrand , ABB, Havells, Anchor , Roma, C&S or similar ISI make approved by competent authority. | — | — | — | 6,335 | |
| — | 35.00 | — | — | ||
| Supply and fixing of 16/20 Amp Modular switch & socket, L&T, Legrand , ABB, Havells, Anchor , Roma, C&S or similar ISI make approved by competent authority. | — | — | — | 9,304.75 | |
| — | 40.00 | — | — | ||
| Supply & delivery of OREVA 40 W 4000 K LED Tube light Brand: OREVA Brand type : registered Brand Catalogue Status : Catalogue not verified by OEM Seling As : Reseller not verified by OEM Catagory Name & Quadrant : Light emitting diode LED fixure- LED tube light (Q3) Model: silver-40W (4Ft) HSN Code: HSN not specified by seller. Make:-Havells, C&S, Bajaj, Oreva or similar. Warranty 05 Years from the date of installation. | — | — | — | 29,776 | |
| — | 40.00 | — | — | ||
| Fixing & commissioning of LED/LED street light fitting with tube. | — | — | — | 1,029.6 | |
| — | 40.00 | — | — | ||
| Installation testing commissioning and supply of 20 W LED (4 Ft) inverter LED batten with square profile and polycarbonate channel lithium ion battery with charging time 8 hours- 10 hours and backup time upto 4 hours indoor tube light fitting. Wiring/connection of fitting with not less than 1.5 sq.mm cu. similar to Havells cat no.LHEXACP7FN1W020,Wire through PVC flexible pipes . Fixing of fitting with aluminium clamps and steel nut bolts. Luminaire warranty period will be five years from the date of Installation. Make:-Havells, C&S, Bajaj, Phillips, Crompton, Greatwhite. | — | — | — | 15,062.4 | |
| — | 30.00 | — | — | ||
| Fixing of ceiling fan. | — | — | — | 1,290 | |
| — | 10.00 | — | — | ||
| Installation, testing, fixing & commissioning of exhaust fan 300/380/450mm sweep in the existing opening including making the hole to suitable size for above fan, making good the damage with cement concrete including connection earthing the body complete etc. as required. | — | — | — | 1,708.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC 2022
ATTACHMENT
GCCACS1-9.pdf
ATTACHMENT
Advancecorrectionslipno.10.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
TenderdocumentTTErunningroomatBJU_1.pdf Tender document
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
TenderdocumentTTErunningroomatBJU_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .