Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAccepted-AOC VIVEKA HOME 207 D UDANGUDI ROAD TISAYANVILLAI 627657 TIRUNELVELI | TISAYANVILLAI | TIRUNELVELI | TAMIL NADU | 627657 | L1 | Accepted-AOC Accepted being L1 Bidder | |
| 2 | L2₹24.9 L+₹16,000 (0.65%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹25.2 L+₹43,500 (1.76%)Rejected-AOC 4 1 70 1 ROAD NO 11 SNEHAPURI NACHARAM HYDERABAD 500 076 | HYDERABAD | MEDCHAL MALKAJGIRI | TELANGANA | 500076 | L3 | Rejected-AOC Rejected | |
| 4 | L4₹25.6 L+₹80,000 (3.23%)Rejected-AOC | L4 | Rejected-AOC Rejected | |
| 5 | L5₹27.4 L+₹2.6 L (10.6%)Rejected-AOC 16 176 A BHARATHI PURAM NAGAI NAGAR DINDUGUL 3 | DINDUGUL | DINDIGUL | TAMIL NADU | L5 | Rejected-AOC Rejected |
Tender Value
₹31.5 L
Closing Date
5 Jun 2020, 6:00 pmClosed
CWE NAVY CHENNAI
Commander Works Engineers Navy Military Engineer Services INS Adyar Old Building Fort St George Rajaji Salai Chennai 600 009
81346 OUTSOURCING OF SERVICES FOR 33 OR 11 KV SUB STATION AND ROUTINE MAINTENANCE OF OUTDOOR SUBSTATION AT KATTABOMMAN UNDER GE TIRUNELVELI
2020_MES_338293_3
81346
Open Tender
Manpower Supply
Item Rate
330 days
TIRUNELVELI
Please refer tender documents
8 documents required · 8 mandatory
₹500
GE TIRUNELVELI
Yes
16 Jun 2020
21 May 2020
6 Jun 2020
21 May 2020
5 Jun 2020
22 May 2020
Amount
Round the clock manning and operation (including sundays & holidays) of 33/11 KV Sub station, Switch yard and Building comprising of MCCBs. CTS, PT, AB Switches, 33/11 KV Transformers, Two pole/ Four pole Structures, Relay panels, HT VCBs (indoor and out door), LAs, Battery Charger and Battery etc., including its routine maintenance, Daily / Weekly / Monthly / Quarterly / Half yearly / annually all as directed and as specified. SHIFT TIMINGS I shift ( 0600 Hrs to 1400 Hrs ) II shift (1400 Hrs to 2200 Hrs) III shift (2200 Hrs to 0600 Hrs)
Notes: (i) Repair / replacement of minor fittings like indication lamps, Fuse wires, Bolt nuts, Distilled water, Battery terminal clips etc. shall deemed to be included in the unit rate quoted by the tenderer. (ii) Operation of street lights located in the installation and INS Kattabomman area including repairs to street lights complete. (iii) Regular checking of load balancing / load on transformer. (iv) Attending break down of external electric installations, all faults of UG cable / OH line on respective installation and INS Katabbomman area (including Watch Towers), replacement of HT/LT/HRC fuses if required exclusively / with MES team. (v) Necessary required T&P shall be provided by the contractor at the substation. (vi) Operators dress with shoe and gum boots earth rod, first aid kit with item, emergency light, rain coat and Two wheeler vehicle shall deemed to be included in the unit rate quoted by the tenderer.
Electrician - 03 Nos. (01 No each for each of the 03 shifts)
Electrician Mate - 05 Nos (01 No. for 1st shift, 02 Nos. each for 2nd and 3rd shift)
Manning and operation (including sundays & holidays) of out door substaions 11 KV of two / four pole structure with out door transformer, GODs, drop out fuses and LT panels /Feeder Pillars LT UG cable and Over head transmission lines etc... by attending the emergency breakdown / fuse calls, replacing the damaged fuses at HT and LT side, greasing /lubricating the two pole structure properly for smooth functioning, checking the jumber connection and tightening the loose connection at the two pole / four pole structure, checking the oil level of the transformer daily all as specified and directed. SHIFT TIMINGS I shift ( 0600 Hrs to 1400 Hrs ) II shift (1400 Hrs to 2200 Hrs) III shift (2200 Hrs to 0600 Hrs) General Shift ( 0900 Hrs to 1700 Hrs) Notes: (i) Attending break down of external electric installations, all faults of UG cable / OH line on respective installation and INS KBN area (including Watch Towers), replacement of HT/LT/HRC fuses if required exclusively / with MES team. (ii) Checking IR value of cables as required and installations as required. (iii) Periodical checking of earthing and watering as required. (iv) Replacement of cable gland, lugs of proper size and applying petroleum jelly on the contact terminals. (v) Attending the break down of external electrical services.
Electrician - 01 No
Electrician Mate - 01 No
Cutting and cleaning the bushes and unwanted plant growth inside E/M installations and all unwanted materials shall be removed from around the installation and substation premises, MES buildings etc... and depositing waste materials outside INS KATTABOMMAN Complex complete all as specified and directed for the following installations/ Buildings:- (a) TSL Colony (b) Ward room (c) COMCEN (d) NWWA (e) MES Office (f) MI Room
(g) ATS (h) Defence Civilian Accn (j) Near KV (k) Near Tarangani Auditorium (l) 4 Pole/ 2 Pole/ Cut point (other than Sub station/Transformer) and Pump House
SRI LAKSHMI GANESH ENGINEERING WORKS
SIRITEL SYSTEMS PRIVATE LIMITED
M.G.Swamy and Co.,
S KUMARAN
SHANMUGA TRADERS
JR ENTERPRISES
SUSII CONSTRUCTIONS
sri manikandan enterprises
MURUKAN BUILDERS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .