Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.0 LAccepted-AOC MAIN ROAD KUJJU RAMGARH JHARKHAND 825316 | KUJJU | RAMGARH | JHARKHAND | 825316 | ₹4.0 L | L-1 | Accepted-AOC Awarded L1 |
| 2 | L-2₹4.1 LRejected-Finance 0 ADITYA ENTERPRISES 0 UNNAO HARDOI ROAD KISHORI KHERA UNNAO UTTAR PRADESH UNDER NAGAR PALIKA UNNAO UTTAR PRADESH 209801 | UNNAO | UTTAR PRADESH | 209801 | ₹4.1 L | L-2 | Rejected-Finance Technically Rejected |
| 3 | Rejected-Technical ARGADA RAMGARH JHARKHAND 829101 | RAMGARH | JHARKHAND | 829101 | - | - | Rejected-Technical Technically Rejected Due to Work Experience not Maching as per NIT |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L2 | NEW NATIONAL ELECTRICAL WORKS L1 |
|---|---|---|---|---|---|
| 1.00 | Cost of Copper wire13 SWG | 144 | Kg | 1,350 ₹1.9 L | 1,280 ₹1.8 L |
| 2.00 | Cost of Insulation materials SI.No. 1 @15% | 1 | job | 29,160 ₹29,160 | 27,648 ₹27,648 |
| 3.00 | Cost of Labour charge @15% of SL NO 1 | 1 | No | 29,160 ₹29,160 | 27,648 ₹27,648 |
| 4.00 | Cost of Molding Coil | 60 | No | 2,200 ₹1.3 L | 2,100 ₹1.3 L |
| 5.00 | Cost of Bearing Hosing with CI rod. | 2 | No | 25,500 ₹51,000 | 25,000 ₹50,000 |
| 6.00 | Contractor benefit @10% of total value | 1 | job | 31,908 ₹31,908 | 30,502.4 ₹30,502.40 |
| 7.00 | Less scrap value SI.No. 1@60% | 1 | Job | 1,16,640 -₹1,16,640 | 1,10,592 -₹1,10,592 |
| 8.00 | Total impact of GST for the purpose of CTC | 1 | No | - | - |
Tender Value
₹3.8 L
EMD Value
₹4,800
Closing Date
21 Aug 2025, 3:00 pmClosed
PE (EnM)
PEOCP
Repairing and rewinding of 180KW, 3.3KV 1470 RPM, 3 Phase HT induction motor Marathon make Sl no-F330-179/2 at PEOCP under Hzb. Area.
2025_CCL_341260_1
PO/PEOCP/EnM/Tender/25-26/17
Open Tender
Electrical and Maintenance Works
10 days
PEOCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,800
29 May 2026
11 Aug 2025
22 Aug 2025
11 Aug 2025
21 Aug 2025
11 Aug 2025
11 Aug 2025 - 15 Aug 2025
Amount
Cost of Copper wire13 SWG
Cost of Insulation materials SI.No. 1 @15%
Cost of Labour charge @15% of SL NO 1
Cost of Molding Coil
Cost of Bearing Hosing with CI rod.
Contractor benefit @10% of total value
Less scrap value SI.No. 1@60%
Total impact of GST for the purpose of CTC
M/S ADITYA ENTERPRISES (BID ID -1176151)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid