Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-Finance | ₹2.4 Cr | L1 | Accepted-Finance OK |
Tender Value
Refer Docs
EMD Value
₹5.7 L
Closing Date
18 Nov 2024, 3:00 pmClosed
EE
CHANDRAWAL WATER WORKS
Supply, Installation, Testing and Commissioning of 18 nos. Various sizes Electromagnetic Flowmeters on the Tappings to NDMC areas including 01-year Defect Liability Period (DLP) and subsequent 05 years Operation and Maintenance (O and M) (Reinvit
2024_DJB_264237_1
PRESS NIT NO. 11 (2024-25)
Open Tender
Miscellaneous Works
Works
2190 days
CHANDRAWAL WATER WORKS
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,500
DJBEMD A/c No-50448339804 THROUGH SUBPAISA GATEWAY
₹5.7 L
Office of Chief Engineer (WW)-I
14 Jan 2025
28 Oct 2024
18 Nov 2024
28 Oct 2024
18 Nov 2024
28 Oct 2024
28 Oct 2024 - 18 Nov 2024
4 Nov 2024
SITC of Electromagnetic Flow Meter, placing them in DJB Store, Installing and commissioning of the flowmeter and accessories at site. The flowmeter should be IP 68 to stop damage by ingression of water /seepage, Custody and responsibility of the above system will be in Firm's scope for commissioning. In case of foreign manufactures who do not have manufacturing facility in India the three point water calibration should be compulsory done at FCRI Palakkad/Govt. lab only. The accuracy of manufacturer’s in-house volume flow calibration lab should be atleast 3 times better than accuracy of the flow meter. Accuracy of manufacturer's in-house volume flow calibration Lab should be mentioned in NABL accreditation and should be less than +/- 0.1 %. Testing of Meters: - Electromagnetic Flow meter manufacturer should carry out the following test on every single flow meter during the manufacturing process and below test certificates should be provided for review during inspection and finally all certificates supplied along with the material: Three-point water calibration certificate, Hydro test certificate, material test certificate for electrode, Coil housing & flow tube, Test and Guarantee certificate. Separate transmitter panel, LPU, FIT MCB Power cable and Single cable of reputed make should also be Provided. Make: - All DJB Approved Make A) 150 MM PN 16
B) 200 MM PN 10
C) 250 MM PN 10
D) 300 MM PN 10
E) 400 MM PN 10
F) 450 MM PN 10
G) 500 MM PN 10
H) 600 MM PN 10
Supply of RTU based system: RTU Controller and Modbus communication with the IO Modules, Panel and Its accessories with details as below: - (1) RTU with inbuilt IO's (4 Analog inputs, 4 Digital Inputs & 4 Digital Outputs, (2) RTU panel with all the above-mentioned modules, (3) Panel with complete internal wiring and accessories. This also includes SIM Cards, UPS and all other related accessories. Provision should be there for downloading the data 24X7 on PC and Mobile with help of Login and Password ID and data to be communicated to central SCADA of DJB and SCADA of NDMC
Operation & Maintenance of above said 18 nos. flow meters having zero charges for 1st year due to Defect Liability Period. (DLP is excluding of 5 years O&M) For 2nd Year A) Operation Charges for each flow meter on per year basis
B) Maintenance Charges with spares for each flow meter on per year basis
For 3rd Year A) Operation Charges for each flow meter on per year basis
B) Maintenance Charges with spares for each flow meter on per year basis
For 4th Year A) Operation Charges for each flow meter on per year basis
B) Maintenance Charges with spares for each flow meter on per year basis
For 5th Year A) Operation Charges for each flow meter on per year basis
B) Maintenance Charges with spares for each flow meter on per year basis
For 6th Year A) Operation Charges for each flow meter on per year basis
B) Maintenance Charges with spares for each flow meter on per year basis
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .