| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | L1 | Accepted-AOC Lowest 1st | |
| 2 | L2₹16.0 L+₹6.1 L (60.9%)Rejected-AOC MOHALLA DESHNAGAR PILIBHIT | PILIBHIT | PILIBHIT | UTTAR PRADESH | L2 | Rejected-AOC Lowest 2nd |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
14 Dec 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC PILIBHIT
Near Roadways Pilibhit
The increasing capacity of 45 nos. over loaded distribution transformers from 10 KVA to 25 KVA and 02 nos. from 16 KVA to 25 KVA at different places of under EDC-Pilibhit in additional business Plan 2023 24.
2023_MVVNL_836581_3
T-19/EDCP/2023-24
Open Tender
Miscellaneous Works
Item Rate
90 days
Pilibhit/Bisalpur
As per tender form
3 documents required · 3 mandatory
₹1,180
SE EDC
₹10,000
3 Apr 2024
4 Dec 2023
14 Dec 2023
4 Dec 2023
14 Dec 2023
4 Dec 2023
Amount
Carriage of following material for increasing capasity from 10 KVA to 25 KVA from store centre under Electricity Store Division Bareilly to site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site under EDD-Bisalpur.
11/0.4 KV 25 KVA Transformer
PCC Pole 8.5Mtr. Long
Balance material As:- Base Angle, 11 kv disk insulator, pin insulator, TPMO, 11 KV Composite pin insulator, ACSR Weasal Conductor, LT XLPE cable, stay set, earthing rod, T-off channel, Top channel-, Holding clamps, distribution box, AB Cable etc. as per estemate.
Erection of the Double pole structure on PCC. Pole 8.5mtr long complete for25 KVA T/F including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. Nut, bolt washers would be provided by the contractor.
Concreting of supports at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor.
Mounting of transformers on double pole and laying of cable jumpering and making all HT/LT connections complete work in all respect.
Erection of stay set with stay wire, stay clamp & stay insulator including with grouting of stay set by concrete of ratio 1:4:8 as per RESSPO norms before back fitting of the pits including binding, climbing, clamping, tightening and nozzeling of stay wire in all respect as per RESSPO norms. Cement. Brick, ballast, sand etc would be provided by the contractor.
Earthing of each PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Fixing of 3 Phase distribution box on pole including proper clamping.
Providing and fixing of danger board on each pole including proper clamping. All material would be provided by firm.
Laying of LT ABC (3X50+1X35+1X16) sq.mm for L.T Line.
Laying of LT XLPE cable (3X70) sq.mm from transformer to L.T Line.
Providing and fixing of I hook with I hook clamp for AB cable
Providing and fixing of ded end clam with for AB cable
Providing and fixing of suspension clamp for AB cable
Providing and fixing of IPC connector for AB cable
Safe carriage of received back 10 KVA T/F from site to Store Centre-Pilibhit after opening and dismantaling all connections and descend of 10 KVA T/F from PCC pole including loading, unloading at both ends and proper stacking at safe site under EDD-Pilibhit Distance up to 0-80 Km.
Carriage of following material for increasing capasity from 16 KVA to 25 KVA from store centre under Electricity Store Division Bareilly to site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site under EDD-Pilibhit.
11/0.4 KV 25 KVA Transformer
PCC Pole 8.5Mtr. Long
Balance material As:- Base Angle, 11 kv disk insulator, pin insulator, TPMO, 11 KV Composite pin insulator, ACSR Weasal Conductor, LT XLPE cable, stay set, earthing rod, T-off channel, Top channel-, Holding clamps, distribution box, AB Cable etc. as per estemate.
Erection of the Double pole structure on PCC. Pole 8.5mtr long complete for25 KVA T/F including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. Nut, bolt washers would be provided by the contractor.
Concreting of supports at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor.
Mounting of transformers on double pole and laying of cable jumpering and making all HT/LT connections complete work in all respect.
Erection of stay set with stay wire, stay clamp & stay insulator including with grouting of stay set by concrete of ratio 1:4:8 as per RESSPO norms before back fitting of the pits including binding, climbing, clamping, tightening and nozzeling of stay wire in all respect as per RESSPO norms Cement. Brick, ballast, sand etc would be provided by the contractor.
Earthing of each PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Fixing of 3 Phase distribution box on pole including proper clamping.
Providing and fixing of danger board on each pole including proper clamping. All material would be provided by firm.
Laying of LT ABC (3X50+1X35+1X16) sq.mm for L.T Line.
Laying of LT XLPE cable (3X70) sq.mm from transformer to L.T Line.
Providing and fixing of I hook with I hook clamp for AB cable
Providing and fixing of ded end clam with for AB cable
Providing and fixing of suspension clamp for AB cable
Providing and fixing of IPC connector for AB cable
Safe carriage of received back 16 KVA T/F from site to Store Centre-Pilibhit after opening and dismantaling all connections and descend of 16 KVA T/F from PCC pole including loading, unloading at both ends and proper stacking at safe site under EDD-Pilibhit Distance up to 0-30 Km.
POWER AND POWER CONSULTANTS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .