| 1 | L1₹1.4 CrAdmitted-Fee/PreQual/Technical/Finance | +2.00% | ₹1.4 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 Cr+₹4.3 L (2.94%)Admitted-Fee/PreQual/Technical/Finance | +5.00% | ₹1.5 Cr+₹4.3 L (2.94%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
29 Aug 2026, 10:00 amClosed
The Executive Engineer, PWD, Udaipur Division
Executive Engineer, PWD, Udaipur Division
WBM-II , III, Tack Coat, Bituminous Concrete etc. during the year 2026-27
2026_CEPWD_76209_1
DNIT No. 117/NIT/SE-III/R/2026-27
Open Tender
Civil Works - Roads
Percentage
180 days
Udaipur
Refer to DNIT documents.
6 documents required · 6 mandatory
₹4,000
₹2.8 L
2 Sept 2026
24 Aug 2026
29 Aug 2026
24 Aug 2026
29 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per MoRD Technical Specification Clause 201.
By manual Means | - | Hact | 22,910.9 | - |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5. | - | Cum | 245.4 | - |
| 3 | Without dewatering.
Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.
Ordinary Soil (upto 3mtr depth). | - | Cum | 458.2 | - |
| 4 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.
Sand filling | - | Cum | 1,407.42 | - |
| 5 | Providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).
P.C.C grade M 10 (using jhama brick aggregate)
Nominal mix 1 : 3 : 6 | - | Cum | 9,503.34 | - |
| 6 | Plain/reinforced cement concrete in substructure complete including formwork as per drawings & MoRD technical specification Clauses 802, 804, 805, 806, 807, 900, 1202 & 1204. (including centering, shuttering, staging etc. but excluding reinforcement)
RCC grade M25 (Upto 5mtr height). | - | Cum | 12,774.04 | - |
| 7 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar in substructure complete as per drawings & MoRD technical specification Clauses 1002, 1005, 1010 and 1202. | - | Tonne | 91,869.48 | - |
| 8 | Water Bound Macadam Sub-Base / Base using Jhama Brick Aggragate.
WBM Grading 2
Providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRD Technical Specification Clause 405.
By manual Means. | - | Cum | 7,757.58 | - |
| 9 | WBM Grading - 3
Providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MoRD Technical Specification Clause 405.
By manual Means | 1 | Cum | 7,789.91 | ₹7,789.13 |
| 10 | Prome coat
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.00 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502. | - | Sqm | 74.38 | - |
stage.html
html • 0.02 MB
finance_77580.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.75 MB
DNIT.pdf
Tender Documents • 2.73 MB
BOQ_77580.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .