Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 CrAccepted-Finance | ₹12.5 Cr | L1 | Accepted-Finance LOWEST |
| 2 | L2₹15.8 CrRejected-Finance | ₹15.8 Cr | L2 | Rejected-Finance HIGHEST |
| 3 | L3₹17.1 CrRejected-Finance | ₹17.1 Cr | L3 | Rejected-Finance HIGHEST |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
20 Aug 2020, 3:00 pmClosed
ambernath municipal council
Ambernath municipal council,Kalyan-Badlapur Road, Ambarnath West
Supply, Installation, Commissioning of Medical Gas Pipeline at Covid Care Center established at Dental College, Ambarnath (W) and Reservation No. 121 UPSC Center, Ambarnath (E) for Ambernath Municipal Council
2020_DMA_603597_1
AMC/Health Dept./2020-21/171
Open Tender
Miscellaneous Services
120 days
AMBERNATH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Online Payment
₹1.5 L
chief offficer ambernath municipal council
2 Nov 2020
14 Aug 2020
21 Aug 2020
14 Aug 2020
20 Aug 2020
14 Aug 2020
17 Aug 2020
Amount
Fully automatic Control Panel with Low Alarm system for Oxygen with Cylinder Manifold System for oxygen CE & ISO certified Supply, installation, testing and commissioning of oxygen manifold system (Excluding cylinders). The Manifold is configured for 10+10 = 20 numbers of Oxygen Cylinders and is suitable to withstand a pressure of 145 Kg/cm2, along with high-pressure copper annealed tail pipes with end Brass adapter suitable for Oxygen Cylinders and manifold. Top frame comprising of high pressure copper pipes of size 1/2” NB x 15swg with high pressure brass fittings made of high tensile brass and connections through non- return valves; The design of middle and bottom frames is provided to fit both round and flat bottom cylinders safely. The manifold is tested (hydraulically) at 3500 psig NRV Valve with flexible tail Pipe
ICU beds 50 + O2 beds 350 at Dental Hospital
ICU beds 50 + O2 beds 150 at Reservation No. 121 UPSC Center
Emergency Manifold system for oxygen CE & ISO certified Supply, installation, testing and commissioning of oxygen manifold system (Excluding cylinders). The Manifold is configured for 2+2=4 numbers of Oxygen Cylinders and is suitable to withstand a pressure of 145 Kg/cm2, along with high-pressure copper annealed tail pipes with end Brass adapter suitable for Oxygen Cylinders and manifold. Top frame comprising of high pressure copper pipes of size 1/2” NB x 15swg with high pressure brass fittings made of high tensile brass and connections through non- return valves; The design of middle and bottom frames is provided to fit both round and flat bottom cylinders safely. The manifold is tested (hydraulically) at 3500 psig
ICU beds 50 + O2 beds 350 at Dental Hospital
ICU beds 50 + O2 beds 150 at Reservation No. 121 UPSC Center
DIN Type Gas Outlet ISO certified (Oxygen,Air,Vaccum) Supply, installation, testing and commissioning of Safe Ceiling Gas Outlets are for use with medical gas system. The gas outlets completely comply with standard regulations and pass the test of leakage and connector stability. Medical Gas Outlet shall be gas specific for the services indicated.It should be CE and ISO Certified. * Color coded according to ISO32 color *100% pressure and leak tested
ICU beds 50 + O2 beds 350 at Dental Hospital
ICU beds 50 + O2 beds 150 at Reservation No. 121 UPSC Center
Ward Vacuum Jar with safety clip and regulator (600ml) Ward Vacuum Unit shall be of light weight and compact. The unit will consist of a regulator, • A 600 ml. Reusable collection jar, made of unbreakable poly carbonate material and fully autoclavable at 134 degrees centigrade A wall bracket for mounting the jar assembly on the wall. The vacuum regulator shall be infinitely adjustable and have vacuum gauge which indicates suction supplied by the regulator. Safety trap shall be provided inside the jar to safeguard the regulator fromoverflowing.
ICU beds 50 at Dental Hospital
ICU beds 50 at Reservation No. 121 UPSC Center
Copper pipes Supply, installation, testing and commissioning of copper pipe used would be half hard drawn, tempered seamless phosphorous deoxidized, non-arsenical and degreased confirming to BS EN: 13348. For copper and copper alloys seamless, round copper tubes for medical gases or vacuum. The supply of pipes would be accompanied with manufactures test certificates for the physical properties of copper pipes and chemical composition. The supply of pipes is further substantiated with inspection certificates from a third party by LLOYD
Dental Hospital Dia 12 mm× OD, 0.9mm Copper pipe
Reservation No. 121 UPSC Center Dia 12 mm× OD, 0.9mm Copper pipe
Dental Hospital Dia 15 mm× OD ,0.9mm Copper pipe
Reservation No. 121 UPSC Center Dia 15 mm× OD ,0.9mm Copper pipe
Dental Hospital Dia 22 mm ×OD, 0.9mm Copper pipe
Reservation No. 121 UPSC Center Dia 22 mm ×OD, 0.9mm Copper pipe
Dental Hospital Dia 28 mm ×OD, 1.0mm Copper pipe
Reservation No. 121 UPSC Center Dia 28 mm ×OD, 1.0mm Copper pipe
Back Pressure Compensated Flow Meter Metallic body with Humidifier Bottle CE & ISO certified Supply, installation, testing and commissioning of Back Pressure Compensated [BPC] Oxygen flow meter body should be made of brass material dully chrome plated and graduated from 0-15 L/m on an expanded lower scale for precision setting at low flow and 5-15 L/m for general use. The humidifier bottle should be made up of unbreakable polycarbonate/ Polysulphone material and Autoclavable at 121-degree Centigrade temperature. It should be CE and ISO 13485 Certified.
ICU beds 50 + O2 beds 350 at Dental Hospital
ICU beds 50 + O2 beds 150 at Reservation No. 121 UPSC Center
Digital Area Alarm CE & ISO certified(2 Gas & 3 Gas) Supply, installation, testing and commissioning of Area Pressure Alarm Panel would be with digital display, closed circuit, self-monitoring type. The alarm would be designed to monitor the line pressure in piping systems. It should be CE and ISO Certified.
ICU beds 50 + O2 beds 350 at Dental Hospital
ICU beds 50 + O2 beds 150 at Reservation No. 121 UPSC Center
Line Shut Off Isolation Valve CE & ISO certified Supply, installation, testing and commissioning of The ball valves the internal ball with full borne is made of stainless steel with Teflon seats. These valves are leak proof and needs only quarter turn for its operation [either fully open or fully closed]. It should be CE and ISO Certified.(15MM)
ICU beds 50 + O2 beds 350 at Dental Hospital
ICU beds 50 + O2 beds 150 at Reservation No. 121 UPSC Center
Individual Outlet Valve for Oxygen Supply, installation, testing and commissioning of the internal ball with full borne is made of stainless steel with Teflon seats. These valves are leak proof and needs only quarter turn for its operation [either fully open or fully closed]. It should be CE and ISO Certified.(12MM)
ICU beds 50 + O2 beds 350 at Dental Hospital
ICU beds 50 + O2 beds 150 at Reservation No. 121 UPSC Center
Central Compressed Air System 1. Supply, installation, testing and commissioning of oil free compressor (Dual Compressor) Motor – 5 HP, 50 Hz No. of Stages – single stages. Piston Displacement in CFM – 22.93 CFM Outlet Pressure – 8.5 Kg/Cm2 2. Compressor body should be of Aluminum alloy. Trident make Desiccant dryer model. Dry spell Plus 20, suitable for 20 CFM content of the air. 1 Nos. of Air receiver should be provided with the capacity of 500 liters. Air Filtration system should be provided to supply medical air. Reciprocating Type Air Cooled Oil Free Air Compressor 5 HP, 300-liter tank mounted -1 Numbers Air Dryer-40 CFM Desiccant type -1 Numbers Air filters (3 Stage) - 1 micron, 0.1 micron, 0.01 micron with 1-inch end connection - 1 Numbers Air Regulator with gauge (Pressure Reducing System) 4kg 2 regulators 1 in standby condition 1 working condition similarly for 7 kg 2 regulators 1 in standby condition 1 working condition (Air Compressor-2 Piece)
ICU beds 50 + O2 beds 350 at Dental Hospital
ICU beds 50 + O2 beds 150 at Reservation No. 121 UPSC Center
Central Vacuum System Supply, installation, testing and commissioning of central vacuum pump A. The medical plant should be manufactured under in ISO 13485 quality management system. B. The vacuum should plant comprise of 1 nos of Motors of 7.5 HP. C. The plant should be fitted with filters. D. There should be a 1 No. of vacuum receiver of 1500 liters’ capacity with Dual Piston type Vacuum pump with motor 7.5 HP (one Running) Vacuum reservoir Tank with safety accessories Capacity: 1500 L Filter. a. The Suction regulator should incorporate an anti-bacterial filter, an anti over flow safety device, wide membrane continuous suction controller and 600 ml polysulphone jar. b. Should have vacuum gauge fitted with a protective bumper device. c. Should have ON/OFF knob allowing quick readjustment of vacuum level. d. Must have central knob with 0-1000mbar/kPa range. e. Jar with lid should be unbreakable and auto cleavable up to 134 deg C , must be transparent to ensure perfect sucked liquid visibility.
ICU beds 50 at Dental Hospital
ICU beds 50 at Reservation No. 121 UPSC Center
Electric Work for Air Compressor and Vacuum Compressor Supply, installation, testing and commissioning of The electrical wiring, Electrical Switch, MCB and Other necessary Electrical Equipment’s for Air Compressor, vacuum Compressor &Control Panel etc.
ICU beds 50 + O2 beds 350 at Dental Hospital
ICU beds 50 + O2 beds 150 at Reservation No. 121 UPSC Center
Weather/Protection Shed Supply, installation, testing and commissioning of The weather shed for equipment shall be made by the service provider with of suitable size and height. The shed should be G.I.colour coated sheets.
ICU beds 50 + O2 beds 350 at Dental Hospital
ICU beds 50 + O2 beds 150 at Reservation No. 121 UPSC Center
Amba Steel and Metal Udyog
Mediline Engineers
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid