| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC ESTIMURI 22 12 SIJUA DHANBAD | DHANBAD | DHANBAD | JHARKHAND | 828121 | ₹3.4 L | L1 | Accepted-AOC Approved |
| 2 | L2₹3.5 LRejected-Finance 22 12 SIJUA TETULMARI DHANBAD DHANBAD DHANBAD 828121 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828121 | ₹3.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.6 LRejected-Finance DATTUMURI BASTI 22 12 SIJUA DHANBAD | DHANBAD | DHANBAD | JHARKHAND | 828121 | ₹3.6 L | L3 | Rejected-Finance L3 |
Tender Value
₹3.4 L
EMD Value
₹4,233
Closing Date
29 Dec 2025, 5:00 pmClosed
AM EnM Sijua Area
Sijua Area office
For Repairing/Changing of Cork Sheet, Stud, Rubber Bush and Insulator of 2 nos. Transformer (i) 630KVA,3.3KV/440V Sl.No.NPC/01/TRA,(ii)1MVA,11KV/6.6KV Sl.No.KM 351/J at NPC(2)Rewinding of tank repairing of 100KVA Transformer,550V/220V at LBC(3)
2025_BCCL_349649_1
GM/SA/AM(EnM)-NIT/2025-26/116
Open Tender
Electrical and Maintenance Works
10 days
NPC and LBC under Sijua Area
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,233
22 Jan 2026
18 Dec 2025
30 Dec 2025
19 Dec 2025
29 Dec 2025
19 Dec 2025
19 Dec 2025 - 26 Dec 2025
(A) 630 KVA Transformer :- Top Cover Opening and fitting the same after cleaning
Internal and External cable connection Opening and refitting the Same after proper insulation both side
Cork Sheet for primary and Secondary bushing
Oil seal for Primary and Secondary stud
Copper stud secondary Side 15" x2" with Complete set nut lock washer Check nut
Copper Stud Secondary Side 15"x3/4" with Complete Set nut lock washer Cheknut
Labour Charges for cork Sheet Changing of top Cover & materials of Cork Sheet
Primary Side Insulator
Copper lugs 120sqmm
(B) 1MVA Transformer :- Top Cover Opening and fitting the same after cleaning
Internal and External cable connection Opening and refitting the Same after proper insulation both side
Cork Sheet for primary and Secondary bushing
Oil seal for Primary and Secondary stud
Copper stud secondary Side 15" x2" with Complete set nut lock washer Check nut
Copper stud secondary Side 15" x 3 x 4" with Complete set nut lock washer Check nut
Labour Charges for cork Sheet Changing of top Cover & materials of Cork Sheet
Copper lugs 120sqmm
(2) 100 KVA, Lighting Transformer :- New changing of primary copper coil
New changing of Secondary Copper coil
Insulating Materials Cost 15%
Covering of Copper strip TPC
HV Side 550V porcelain Insulator
LV Side procelain Insulator
Transporting Charge
Fevicol
Labour Charges:- a) Electrician Gr - 1 ( 02 x 02 shift )
b) Electrician Gr - II ( 02 x 02 shift )
Less Scrape Value
(B) Cable Jointing Laying & 120sqmm :- Cable Jointing out door 120sqmm (10.2.2 )
Cable Jointing in door 120 sqmm (10.4.2)
Cable Laying ( 8.1)
Cable Laying Transformer to Over head ( 8.1 )
(C )Tank Cutting Welding & New Fabrication :- Oxygen
Welding Electrode
Tank cleaning painting & Transporting both side
Labour Charge :- a) High skilled 04 head x 02 shift
b) Skilled 04 head x 02 shift
(3) Power Transformer 6.6KV,440V Make Crompton)Transformer oil draining and after completion refilling the same
Cable Indoor Joint
Cork Sheet oil seal and Gasket changing of primary
Dismantling of cooling tubes and after cork sheet changing refitting the same
Brass stud 1 '' Thiknes of L.T side with Nut , Check Nut ruber bush 440Volt etc.
Copper Stud 6.6 KV, with nut lock washer Check Nut & Washer
New Copper Patti
Copper Lug
LT side Cable Laying 120 sqmm 440Volt
HT side Laying 240sqmm 6.6 KV
Labour Charges :- a) High skilled 03 head x 03 shift
b) Skilled 03 head x 04 shift
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.70 MB
BOQ_362396.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid