Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L1 | Accepted-AOC Lowest tenderer | |
| 2 | L2₹11.8 L+₹28,420 (2.47%)Rejected-AOC COLABA MUMBAI | L2 | Rejected-AOC Other than lowest tenderer | |
| 3 | L3₹11.9 L+₹45,856 (3.99%)Rejected-AOC PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L3 | Rejected-AOC Other than lowest tenderer | |
| 4 | Rejected-Technical NO 23 SECOND MAIN ROAD RAJAMMAL NAGAR MADAMBAKKAM CHENNAI 600 126 | CHENNAI | CHENGALPATTU | TAMIL NADU | 600126 | - | Rejected-Technical Not submittedthe undertaking of tender documents as per note No 13 | |
| 5 | Rejected-Technical COLABA MUMBAI | - | Rejected-Technical Not submittedthe undertaking of tender documents as per note No 13 |
Tender Value
Refer Docs
EMD Value
₹23,000
Closing Date
13 Oct 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (NW) KOCHI
CWE (NW) KOCHI
COMPREHENSIVE MAINT OF LIFT AT INS AGRANI
2022_MES_552302_1
CWE(NW)/KOCHI/81309
Open Tender
Civil Works
Item Rate
330 days
KOCHI
AS PER NIT
6 documents required · 6 mandatory
₹500
AGE (I) AGRANI
₹23,000
Yes
16 Nov 2022
16 Sept 2022
15 Oct 2022
16 Sept 2022
13 Oct 2022
29 Sept 2022
16 Sept 2022 - 6 Oct 2022
60 days
Amount
Comprehensive maintenance / repairs and periodical servicing of two numbers of electrically operated passenger lift (capacity of 08 Nos passenger lift of 544 Kg and 13 Nos passenger lift of 884 Kg weight) complete through OEM with electrical/control panels and all connected Gadgets/Devices including ARDs and replacement of all defective parts and sundry items like grease, lubricant oil, cotton waste, small pieces of cable legs for different capacity lifts at the following location in INS Agrani all as specified and directed by Engineer- in-charge :- (a) 08 Nos passenger lift of 544 kg at MAP Phase II building used for (G + 6) floors. Make of lift : ESCON Elevators (b) 13 Nos passenger lift of 884 Kg at MAP Phase II bldg user for (G + 6) floors Make of lift : ESCON Elevators Note :- (i) Comprehensive maintenance include repair/replacing spare parts if found defective such as speed governer ,bearing,coils,PCB's ,Bushes,break resistor,filters,fuse,relays,limit switches,car door safety device,all buttons,door locks,displays,indicator,VFD,car safety display cover,step roller,safety switches magnetic switches,light fixture,ceiling light bulb/tubes cabin fan,lubricants,break oil etc shall be included in the rate qoted (ii) Customer care contact Number of the repair/rescue agency is to be displayed at each lift. The firm should attend defects/breakdown rescue action to be initiated immediately and to be completed within four hours from intimation to contractor. Record for the same is also to be maintained and updated in log book each time, and same will be produced to Department by monthly. (iii) Well trained, service engineer/technicians deputed by OEM are to be employed at site for lift maintenance. Prior approval in this regard is to be obtained from AGE(I) Agrani.
(iv) The work will be of continuous in nature without Sundays, Holidays or Strikes and the contractor must employ lift technicians for the work when necessity arises. (v) The service engineer/technician should ensure the serviceability of the lifts for every odd situation. The contractor should ensure full safety and security of personnel deployed. Any casualty or injury sustained by the service engineer/technician during the currency of the contract at the defence premises shall be sole liability of the contractor. (vi) All tools & plants or transport required for carrying out comprehensive maintenance and necessary stationary & documents (log book) records at each lift installation will be arranged by the contractor and nothing extra will be admissible on this account. (vii) The quoted rates are deemed to be included for provision of communication facility to service engineer/ technician with Department and with other persons. (viii) The rate quoted by the contractor shall deemed to be included for cleaning of the lift machineries, lift panels, lift shaft inspection,neat and tidy in all manner. (ix) The contractor should ensure all provisions as laid down by State/Central Govt, Labour Commissions. Employees provident fund payments, Employee Insurance, minimum fair wages, working conditions , Lift Insurance and Licence renewal to be made from the Lift licence issue authority Govt of Tamil Nadu for Lift and to display certification of lift license in lift car etc are to be complied.
(x) Contractor needs to carry out bimonthly (15 days), monthly, quarterly and half yearly tests as specified in Particular Specification in triplicate as per format attached. The rates quoted shall be deemed to be included for all the tests stipulated and as directed by inspecting officer. One load test on each lift, other than required during lift breakdowns is to be carried out and result to be submitted to the department. Log book shall be arranged by the contractor at his own cost. (xi) Addressing complaints should strictly adhere timelines otherwise penalty will be levied as per relavent PS condition of CA (xii) Contractor has to submit MoU with OEM ie ESCON Elevators before commencement of work to Department which certify the all activities to be carried out through OEM only.
Supply and Fixing in replacement of existing control system to CANBAS Integrated Controller based on collective control panel for trouble free maximum efficiency and longer life to the lift of 1 Nos. 8 Passenger Capacity Lift (G+6 floors) installed at MAP Phase II building at INS Agrani complete all as specified and as directed. Make: ESCON
Supply and Fixing in replacement of Dynamic Breaking Resistor with all accessories suitable for 8 Passenger Capacity Lift (G+6 floors) installed at MAP II building at INS Agrani complete all as specified and as directed.
Supply only Rotary Encoder for Speed feedback of Main Drive complete all accessories of 8 Passenger Capacity Lift (G+6 floors) installed at MAP II building at INS Agrani complete all as specified and as directed.
Supply and Fixing in replacement of Car Operating Panel with all accessories of 8 Passenger Capacity Lift (G+6 floors) installed at MAP II building at INS Agrani complete all as specified and as directed. Make: ESCON
Supply and Fixing in replacement of Landing Operating Panel with all accessories of 8 Passenger Capacity Lift (G+6 floors) installed at MAP Phase II building at INS Agrani complete all as specified and as directed. Make: ESCON
Supply and Fixing in replacement of shaft wiring with all accessories of 8 Passenger Capacity Lift (G+6 floors) installed at MAP Phase II building at INS Agrani complete all as specified and as directed. Make: Rolliflex/Flexon
Supply and Fixing in replacement of Traveling Cable with all accessories of 8 and 13 Passenger Capacity Lift with 7 Landings (G+6 floors) installed at MAP Phase II building complete all as specified and as directed. Make: Rolliflex/Flexon
Supply and Fixing in replacement of Shaft Information System with all accessories of 8 Passenger Capacity Lift with 7 Landings (G+6 floors) installed at MAP Phase II building complete all as specified and as directed. Make: ESCON
Supply and Fixing in replacement of Car Header only complete all accessories of 8 Passenger Capacity Lift with 7 Landings (G+6 floors) installed at MAP Phase II at INS Agrani complete all as specified and as directed. Make: ESCON/Genesis
Supply and Fixing in replacement of Door Drive complete all accessories of 8 and 13 Passenger Capacity Lift with 7 Landings (G+6 floors) installed at MAP Phase II at INS Agrani complete all as specified and as directed. Make: Monarch/ ESCON
Supply and Fixing in replacement of Full Curtain Infra red door sensor complete all accessories of 8 and 13 Passenger Capacity Lift with 7 Landings (G+6 floors) installed at MAP Phase II at INS Agrani complete all as specified and as directed. Make: ESCON/WECO
Monarch Enterprises
shakti engineering and electrical works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .