Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹10.4 L+₹76,885 (8.00%)Rejected-Finance | L2 | Rejected-Finance As per recommendation of Financial Evaluation Committee | |
| 3 | L3₹10.7 L+₹1.0 L (10.9%)Rejected-Finance | L3 | Rejected-Finance As per recommendation of Financial Evaluation Committee |
| Sl No | Description | Qty | Unit | M P YACOB L1 | TOLLY MATHEW L3 | K SURESHKUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00ROAD | ||||||
| 1.01 | Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 3 | cum | 2,400 ₹7,200 Lowest | 2,550 ₹7,650 | 2,500 ₹7,500 |
| 1.02 | Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement (IRC 3.2.1.a) | 81.09 | cum | 2,300 ₹1,86,516.2 Lowest | 2,550 ₹2,06,789.7 | 2,500 ₹2,02,735 |
| 1.03 | Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement (IRC 3.2.1.a) | 23.85 | cum | 2,400 ₹57,242.4 Lowest | 2,650 ₹63,205.15 | 2,500 ₹59,627.5 |
| 1.04 | Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 3 | cum | 3,000 ₹9,000 Lowest | 3,500 ₹10,500 | 4,000 ₹12,000 |
| 1.05 | Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm | 9.54 | cum | 2,800 ₹26,714.8 Lowest | 3,250 ₹31,008.25 | 3,500 ₹33,393.5 |
| 1.06 | Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. | 2,385.07 | sqm | 280 ₹6,67,821 Lowest | 310 ₹7,39,373.25 | 300 ₹7,15,522.5 |
| 1.07 | Engaging Man coolie | 6 | each | 1,000 ₹6,000 Lowest | 1,150 ₹6,900 | 1,100 ₹6,600 |
Tender Value
₹8.3 L
EMD Value
₹20,900
Closing Date
8 May 2025, 3:00 pmClosed
THE REGISTRAR
CUSAT, COCHIN- 22
Resurfacing of quarters road (south eastern road) at CUSAT Thrikkakara campus.
2025_CUSAT_758271_1
CUSAT/ET-40 (CIVIL)/UEU/5100/24-25
Open Tender
Civil Works - Roads
Item Rate
30 days
CUSAT, Thrikkakara Campus
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,172
₹20,900
15 Sept 2025
4 Apr 2025
13 May 2025
4 Apr 2025
8 May 2025
4 Apr 2025
Amount
Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement (IRC 3.2.1.a)
Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement (IRC 3.2.1.a)
Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm
Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm.
Engaging Man coolie
K SURESHKUMAR (BID ID -2207468)
TOLLY MATHEW (BID ID -2207508)
Bidder Name
M P YACOB
TOLLY MATHEW
K SURESHKUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .