Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹1.4 Cr+₹3.4 L (2.46%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SEVEN BUILDERS L1 | SHABEER K T L2 |
|---|---|---|---|---|---|
| 1.01 | Supply and stacking for measurment at site, Quarry waste, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 850 | cum | 1,345 ₹11,43,250 Lowest | 1,345 ₹11,43,250 Lowest |
| 1.02 | Supply and stacking for measurment at site, Stone Aggregate (Single size); 40mm nominal size, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 650 | cum | 2,217 ₹14,41,050 Lowest | 2,217 ₹14,41,050 Lowest |
| 1.03 | Supply and stacking for measurment at site, Stone Aggregate (Single size); 20mm nominal size, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 350 | cum | 2,217 ₹7,75,950 Lowest | 2,217 ₹7,75,950 Lowest |
| 1.04 | Supply and stacking for measurment at site, Stone Aggregate (Single size); 10mm nominal size, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 200 | cum | 2,217 ₹4,43,400 Lowest | 2,217 ₹4,43,400 Lowest |
| 1.05 | Supply and stacking for measurment at site, Coarse sand (zone III), including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 630 | cum | 2,448 ₹15,42,240 Lowest | 2,448 ₹15,42,240 Lowest |
| 1.06 | Supply and stacking for measurment at site, Portland Cement, (ISI Standard) Approved by Engineer-in-charge, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 480 | tonne | 10,000 ₹48,00,000 Lowest | 10,500 ₹50,40,000 |
| 1.07 | Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper, at site including the cost of fuel/Energy, maintance and transportation to siteetc. Complete. | 90 | day | 4,058 ₹3,65,220 Lowest | 4,058 ₹3,65,220 Lowest |
| 1.08 | Hire charges of Vibrator (Needle tye 40mm), at site including the cost of fuel/Energy, maintance and transportation to siteetc. Complete. | 90 | day | 1,841 ₹1,65,690 Lowest | 1,841 ₹1,65,690 Lowest |
| 1.09 | Supply and stacking for measurment at site, Good earth, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 220 | cum | 459 ₹1,00,980 Lowest | 459 ₹1,00,980 Lowest |
| 1.10 | Supply and stacking for measurment at site, Twisted steel/deformed bars[ISI Standard ](specification as per required work) Approved by Engineer-in-charge, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 200 | quintal | 10,000 ₹20,00,000 Lowest | 10,500 ₹21,00,000 |
Tender Value
₹1.4 Cr
EMD Value
₹50,000
Closing Date
29 Sept 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SECRETARY
O/O SECRETARY NADUVANNUR GP
SUPPLY OF CONSTRUCTION OF MATERIALS AGRREGATES, SAND,PORTLAND CEMENT,STEEL ETC
2026_DP_870367_1
NDR/VB-GRAM G/02/2026-27
Open Tender
Raw Materials
Item Rate
NADUVANNUR GP
Please refer Tender documents.
6 documents required · 6 mandatory
₹6,508
Yes
₹50,000
Yes
3 Oct 2026
17 Sept 2026
30 Sept 2026
17 Sept 2026
29 Sept 2026
17 Sept 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supply and stacking for measurment at site, Quarry waste, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 850 | cum | 1,345 | ₹11,43,250 |
| 1.02 | Supply and stacking for measurment at site, Stone Aggregate (Single size); 40mm nominal size, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 650 | cum | 2,217.6 | ₹14,41,440 |
| 1.03 | Supply and stacking for measurment at site, Stone Aggregate (Single size); 20mm nominal size, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 350 | cum | 2,217.6 | ₹7,76,160 |
| 1.04 | Supply and stacking for measurment at site, Stone Aggregate (Single size); 10mm nominal size, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 200 | cum | 2,217.6 | ₹4,43,520 |
| 1.05 | Supply and stacking for measurment at site, Coarse sand (zone III), including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 630 | cum | 2,448.6 | ₹15,42,618 |
| 1.06 | Supply and stacking for measurment at site, Portland Cement, (ISI Standard) Approved by Engineer-in-charge, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 480 | tonne | 10,982.26 | ₹52,71,484.8 |
| 1.07 | Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper, at site including the cost of fuel/Energy, maintance and transportation to siteetc. Complete. | 90 | day | 4,058 | ₹3,65,220 |
| 1.08 | Hire charges of Vibrator (Needle tye 40mm), at site including the cost of fuel/Energy, maintance and transportation to siteetc. Complete. | 90 | day | 1,851 | ₹1,66,590 |
| 1.09 | Supply and stacking for measurment at site, Good earth, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 220 | cum | 459.02 | ₹1,00,984.4 |
| 1.1 | Supply and stacking for measurment at site, Twisted steel/deformed bars[ISI Standard ](specification as per required work) Approved by Engineer-in-charge, including all cost of conveyance, store in safe place and all labour charges for stacking etc. complete | 200 | quintal | 9,949.8 | ₹19,89,960 |
stage.html
html • 0.02 MB
finance_1474768.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
FormofTender2.pdf
Other Document • 0.24 MB
FORMOFNTERITY.pdf
Other Document • 0.23 MB
epay02.pdf
Other Document • 0.23 MB
BOQ_1474768.xls
BOQ • 0.33 MB
PAgreement_02.pdf
Other Document • 0.25 MB
timeextension.pdf
PDF • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .