Loading…
Loading…
Tender ID
Tender Value
₹16.9 L
EMD Value
₹16,950
Closing Date
4 May 2026, 5:00 pmClosed
Executive Officer,NAC,Kodala
Executive Officer,NAC, Kodala
CONSTRUCTION OF SCHOOL BUILDING AT B. NUAPALLI PRIMARY SCHOOL WARD NO-01 UNDER KODALA NAC
2026_ORULB_128283_1
KOD-NAC-20/2026-27
Open Tender
Civil Works - Others
Percentage
NAC KODALA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Executive Officer,NAC,Kodala
₹16,950
Yes
21 Apr 2026
21 Apr 2026
5 May 2026
21 Apr 2026
4 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantaling and removing RCC columns, beams, slab, staircase, landing, lintels including stacking the materials for reuse and removing the debries within 50 m. lead. | |||||
| 2Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. | |||||
| 3Filling foundation and plinth with sand and wel watered & rammedetc . Complete including cost of sand . | |||||
| 4Cement concrete of proportion (1:3:6) in F&F using 4 cm size bhg C.B metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect . | |||||
| 5R.C.C work of proportion M-25 in Concrete using 20 mm size cbhg chips of approved quality including cost, conveyance, taxes, royalties of all materials, watering & curing for 28 days & cost of all labour with T&P etc. complete. | |||||
| 6Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. | |||||
| 7Rigid smooth centering & shuttering cost, conveyance, taxes, royalties of all materials, cost of all labour with T&P etc. complete. Column | |||||
| 7.1 | Rigid smooth centering & shuttering cost, conveyance, taxes, royalties of all materials, cost of all labour with T&P etc. complete.
Column | - | Sqm | - | - |
| 7.2 | Rigid smooth centering & shuttering cost, conveyance, taxes, royalties of all materials, cost of all labour with T&P etc. complete.
Wash Basin Slab | - | Sqm | - | - |
| 8Fly ash Brick masonary in cement mortar (1:6) by using 9" size Bricks including all cost, conveyance etc. complete. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
DTCN.pdf
Tender Documents • 0.50 MB
BOQ_588233.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .