Tender Value
₹77.5 Cr
EMD Value
₹12 L
Closing Date
8 Oct 2026, 4:00 pm
Additional Chief Engineer (P&C)
Supply, installation, testing & commissioning of conversion of (1) 66kV Halvad - Soladi line (2) 66kV Dhrangadhra - Hirapur line (3) 66kV Dhrangadhra - Bavli line (4) 66kV Surendranagar- Wadhwan - Rajsitapur line (5) 66kV Limbdi - Sayla line (6) 66kV Limbdi - Chornia line (7) 66KV Chornia - Khandiya line with ACSR DOG conductor into equivalent HTLS conductor (equivalent weight of ACSR DOG conductor with higher ampacity) of Surendranagar Circle (Except Gap Type conductor)
342360
ACE(P&C)/Contracts/E-514/Uprating/66kV/S&E/TN-14
Open
Electrical Works
Works
Vadodara
44 documents required · 36 mandatory · 8 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹12 L
14 Sept 2026
14 Sept 2026
14 Sept 2026
8 Oct 2026
14 Sept 2026
General 23.1 (a) The estimated cost for of 23.1 (a) The estimated cost of Tender is
Conditions of Tender is more than Rs. 100 lacs, the more than Rs. 100 lacs, the EMD is
Contract/ EMD is payable as under: payable as under:
and its sub- 50 % of EMD by DD in favor of 50 % of EMD by DD in favor of
clauses Gujarat Energy Transmission Gujarat Energy Transmission
Corporation Ltd. on any Corporation Ltd. on any
Scheduled Bank in Vadodara Scheduled Bank in Vadodara and
and Balance 50 % by Bank Balance 50 % by Bank Guarantee
Guarantee from any from any Nationalized Bank in the
Nationalized Bank in the format provided herein.
format provided herein.
(b) The estimated cost of tender is less
(b) The estimated cost of tender is than Rs.100 Lacs, the EMD is payable as
less than Rs.100 Lacs, the EMD is under: -
payable as under: -
100 % of EMD by DD in favor of
100 % of EMD by DD in favor Gujarat Energy Transmission
of Gujarat Energy Corporation Ltd. on any
Transmission Corporation Ltd. Scheduled Bank in Vadodara.
on any Scheduled Bank in
(c) Payment by Cheque / Coop Bank
(c) Payment by Cheque / Coop Bank Guarantee/ Company Guarantee is not
Guarantee/ Company Guarantee is permissible.
not permissible.
(d) Validity Period: - The offer should be
(d) Validity Period: - The offer should valid for a minimum period of 180 days
be valid for a minimum period of 180 from the date of opening of Technical bid.
days from the date of opening of
Technical bid. (e) Payment of EMD will be accepted
by RTGS / NEFT / online or Demand
-- draft or Banker’s cheque or Pay order
or Bank Guarantee
Seal & Signature of Bidder
23.2 The bid security is required to 23.2 The bid security is required to
protect the owner against the risk of protect the owner against the risk of
Bidder’s conduct, which would Bidder’s conduct, which would warrant
warrant the guarantee forfeiture, the guarantee forfeiture, pursuant to
pursuant to relevant paras elsewhere relevant paras elsewhere
The bid guarantee shall be made The bid guarantee shall be made payable
payable to the Owner without any to the Owner without any condition
condition whatsoever. whatsoever.
23.3.1 Any bid not secured in 23.3.1 Any bid not secured in
accordance with Para 23.1 above will accordance with Para 23.1 above will be
be rejected by the Owner as non- rejected by the Owner as non-
responsive. No exemptions are made responsive. No exemptions are made in
in the furnishing of the security. the furnishing of the security.
23.3.2 Unsuccessful Bidder’s bid 23.3.2 Unsuccessful Bidder’s bid
security/EMD will be security/EMD will be returned/refunded
returned/refunded on
forthwith on finalization of tender i.e.,
finalization of tender or three
months-from the date of once the award of contract, after opening
submission of tender of price bids. However, the Bid Security/
whichever is later. EMD of the bidder ranked next (L2) to the
bidder determined as the successful
bidder (L1) shall be retained by GETCO,
along with the Bid Security/ EMD of the
successful bidder. Bid Security/ EMD of
L2 bidder shall be returned immediately
after the Letter of Acceptance/ Award
(LOA) is issued by GETCO to the
successful bidder and acknowledged/
accepted by the successful bidder or the
Contract is signed with the successful
bidder, whichever event occurs earlier.
However, if there is a delay of 21 days or
more in aforesaid events reckoned from
the date of approval of award of contract
by the competent authority, as aforesaid,
the Bid Security/ EMD of the L2 bidder
shall be released immediately after the
said period of 21 days.
If the validity of the bid expires and any
bidder chooses not to extend the bid
validity, the Bid Security/ EMD of such
bidder shall be returned forthwith.
23.3.3 The successful bidders, Bid 23.3.3 The successful bidders, Bid
Security will be discharged Security will be discharged upon,
upon, furnishing the contract furnishing the contract security deposit /
performance guarantee performance guarantee.
Seal & Signature of Bidder
23.4 The bid guarantee may be 23.4 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid
a) If a Bidder withdraws its bid during the period of bid validity
during the period of bid validity specified by the bidder on the bid
specified by the bidder on the Form:
bid Form: b) If a bidder refuses to accept the
b) If a bidder refuses to accept contract or fails to commence the
the contract or fails to works (including supplies within
commence the works thirty days of letter of award of
(including supplies within thirty contract)
days of letter of award of
2. Part –I 86.0 Terms of Payment 86.0 Terms of Payment
General The payment for materials to be The payment for materials to be supplied
Conditions of supplied and erected shall be made and erected shall be made as under only
Contract/ as under only after execution of the after execution of the contract
Clause 86.0 contract documents/furnishing of documents/furnishing of Security Deposit
and its sub- Security Deposit and on execution of and on execution of transmission line
clauses transmission line work. work.
86.1 For supply
86.1 For Supply
86.1.1 Interest Bearing Advance
(i) Interest Bearing Advance
(Optional*): Ten percent (10%) of the
total Ex-works price component of
Tower / Tower Parts (including Bolts &
Nuts) and all other materials shall be
paid as an interest bearing initial
advance, at the rate of interest as per (ii)
below, after signing the Contract
Agreement and on submission of the
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance}], from a Public Sector Indian
bank/Scheduled, Commercial Bank in the
form attached herewith as Annexure-i
(The guarantee shall be initially valid up
to 90 days after the Time of Completion
and shall be reduced at the end of every
Quarter prorata to the advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents is
submitted by the Contractor to the
Employer within 3 months from the date
Seal & Signature of Bidder
of Letter/ Notification of Award. In case
the Contractor does not submit the
requisite documents including applicable
Bank Guarantee(s) /Security(ies) within
the aforesaid period, the advance shall
not be payable. The Contractor shall,
within 7 days from the date of receipt of
Advance, furnish an Advance Receipt
Voucher to the Employer, as prescribed
under the GST Law.
Note: * This payment is an optional
payment. The Contractor has the option
of taking the interest bearing initial
advance or otherwise. The option for
advance payment is to be indicated by
the bidder in its bid as per the format
attached herewith as Annexure–iii and
shall be deemed to be part of the bidding
scheduled referred as SCHEDULED-21
to be submitted by the bidder with
(ii) Interest rate applicable on advance
payment to the Contractor shall be at the
rate equal to one-year MCLR rate [One-
year Tenor rate p.a.] published by State
Bank of India prevailing as on the date of
drawl of advance. The said interest rate
shall remain fixed and shall be applicable
till the advance amount is fully repaid.
The interest will be charged considering
proportionate adjustment of advance
against progressive payment as per
86.1.2 below. The interest shall be
calculated on the daily progressive
balances outstanding as on the date of
recovery/adjustment. It is the Employer’s
understanding that as per extant
provisions, GST is not payable on
interest paid on the amount of Advance.
The Contractor is, however, advised to
check the position from their own
sources. If payable even at later stage,
the same shall be to the Contractor’s
account and Employer shall not
reimburse any GST on this account.
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior to
the scheduled Time of Completion, failing
which the whole amount of advance
along with interest thereon shall be
Seal & Signature of Bidder
recovered immediately from the
payments due to the Contractor.
The contractor may however, return / pay
to GETCO the unadjusted advance
amount at any stage during the execution
of the work along with the accrued
interest thereon till the time of return /
payment. Alternatively, the contractor
may also request GETCO for early
adjustment of the advance along with
accrued interest.
Further, the Contractor shall submit the
certificate of Tax Deduction at Source
(TDS) on interest within 3 months from
the end of the quarter in which
adjustment of advance has been made
for claiming refund from Employer. No
claim for refund will be entertained after
end of the aforesaid period of 3 months.
Further, while submitting the TDS
Certificate the details of Contract No,
Project, Region, Quarter etc to which the
TDS certificate pertains, shall also be
submitted tallying the amount with the
TDS Certificate.
In case, the Contractor opts not to take
interest bearing advance as above, it
would be mandatory for him to submit the
documents listed at Sl. No. (i) (c) above
within twenty-eight (28) days of issuance
of Letter/ Notification of Award.
86.1.2 Progressive Payments
(i) 80% of supply value for each
(i) (a) 70 % of supply value for fabricated
consignment of material on
tower parts & stubs and 80% of supply
submission of invoice along with
value for all other line material, hardware
100% GST, duties, F & I shall be paid
and accessories etc. if contractor opts to
within 30 days from the actual
take interest bearing initial advance or
material receipt date mentioned in SR
Note after verifying the following
(b) 80% of supply value instead of 70% of
documents by field office and duly
supply value for fabricated tower parts &
stubs and 90% of supply value instead
of 80% of supply value for all other line
A. Tax invoice.
material, hardware and accessories etc.,
B. Delivery challan.
if contractor opts not to take interest
C. Endorsed RR / LR copy.
bearing initial advance or has opted to
D. Dispatch clearance certificate /
take interest bearing initial advance but
letter wherever applicable.
E. E Way Bill, if applicable the advance payment has become
inadmissible for each consignment of
material on submission of invoice along
Seal & Signature of Bidder
with 100% GST, duties, F & I shall be
paid within 30 days from the actual
material receipt date mentioned in SR
Note after verifying the following
documents by field office and duly
A. Tax invoice.
B. Delivery challan.
C. Endorsed RR / LR copy.
D. Dispatch clearance certificate / letter
wherever applicable.
E. E Way Bill, if applicable
(ii) 10% payment out of balance 20% (ii) 10% of the of supply value for
of supply value shall be paid on fabricated tower parts & stubs shall be
completion of erection & testing of the paid progressively on completion of
transmission line and completion erection of complete tower (including tack
certificate from Engineer-in-charge welding and earthing) and furnishing of
and Chief Engineer (Procurement & completion certificate from Engineer-in-
Contracts)) or equivalent. charge and Chief Engineer (Projects).
(iii) Balance 10% of supply value shall (iii) Balance 10% of supply value shall be
be paid on successful commissioning paid on quarterly basis on erection
of transmission line against (including stringing) of transmission line
completion certificate and only after in stretches cumulatively not less than
settlement of material account 10% of original length of line in all
statement of items supplied, used, respects and rectification of
erected and successful defects/deficiencies of corresponding
commissioning is settled for complete stretch on progressive basis and on
lot and balance 10% will be release completion certificate from Engineer-in-
only after passing of final bill. No charge and Chief Engineer (Projects).
extra payment will be released for This payment shall be released on
the tower materials and line submission along with the invoice for first
materials which are not required for such payment, of an unconditional &
completion of line if supplied irrevocable Bank Guarantee of 10% of
excess during execution of work contract price of supply portion, initially
and recovery will be made in final valid till 3 months beyond the scheduled
bill accordingly. date of completion of testing &
commissioning of the transmission line
and its taking over by the GETCO and
shall be extended from time to time till the
actual date of successful completion of
testing & commissioning of line and its
taking over by the GETCO.
GETCO should accept the Tower and
line materials if excess as per
approved check survey only. No other
payment will be made and no other
material shall be accepted.
(iv) Welfare Cess
(iv) Welfare Cess
The modality of payment/
The modality of payment/ reimbursement of welfare cess will be
reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor /
bidder will get them registered under
Seal & Signature of Bidder
On receipt of A/T, the contractor / Welfare Cess Act and submit the
bidder will get them registered under documentary evidence to the concern
Welfare Cess Act and submit the office.
documentary evidence to the Before release of payment of first
concern office. R.A.Bill, the contractor has to submit
Before release of payment of first the documentary evidence of
R.A.Bill, the contractor has to submit registration. Only thereafter, the bill will
the documentary evidence of be processed for payment.
registration. Only thereafter, the bill Before release of payment of
will be processed for payment. subsequent R.A.Bills, the contractor
Before release of payment of has to submit the documentary
subsequent R.A.Bills, the contractor evidence of payment of welfare cess of
has to submit the documentary previous R.A.Bill.
evidence of payment of welfare cess Before release of payment of Final Bill,
of previous R.A.Bill. the contractor has to submit the
Before release of payment of Final documentary evidence of payment of
Bill, the contractor has to submit the welfare cess of previous R.A.Bill as
documentary evidence of payment well as the final bill.
of welfare cess of previous R.A.Bill If the R.A.Bill happens to be first and
as well as the final bill. final bill, then before release of
If the R.A.Bill happens to be first and payment, contractor has to submit
final bill, then before release of documentary evidence of registration
payment, contractor has to submit under Welfare Cess Act and evidence
documentary evidence of of payment of welfare cess.
registration under Welfare Cess Act The welfare cess shall be reimbursed
and evidence of payment of welfare to the contractor on submission of
cess. copy of documentary evidence of
The welfare cess shall be payment by observing due
reimbursed to the contractor on formalities.
submission of copy of
documentary evidence of payment
by observing due formalities.
86.2 For Erection works.
86.2 For Erection works. 86.2.1 A. Survey
Payment for survey shall be paid on pro-
rata basis on completion of survey and
approval of the same by the Employer.
86.2.1 B. Interest Bearing Initial
Advance (Optional ^^) Ten percent
(10%) at the rate of interest as per
86.2.1 B.1 1st Installment of 05% (Five)
of the total Installation price component
(excluding the price component for
survey) shall be paid on Establishment of
Contractor’s site offices, commencement
of stub setting work & certification by
Project Manager that satisfactory
mobilization for erection exists and on
submission of the following:
Seal & Signature of Bidder
(a) Proforma invoice,
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance} Plus {amount of GST
reimbursable on Advance as per the
Proforma invoice}] from a Public Sector
Indian bank/Scheduled, Commercial
Bank in the form attached herewith as
Annexure-i (The guarantee shall be
initially valid up to 90 days after the Time
of Completion and shall be reduced at the
end of every Quarter prorata to the
advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
86.2.1. B.2 2nd Installment of 05%
(Five)^^ of the total Installation price
component (excluding the price
component for survey) shall be paid on
commencement of stringing activities &
certification of the same by Project
Manager and on submission of the
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance} Plus {amount of GST
reimbursable on Advance as per the
Proforma invoice}] from a Public Sector
Indian bank/Scheduled, Commercial
Bank in the form attached herewith as
Annexure-i (The guarantee shall be
initially valid up to 90 days after the Time
of Completion and shall be reduced at the
end of every Quarter prorata to the
advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
(d) A declaration by the Contractor
stating that 1st Installation (5%) of
advance has been utilized against the
mobilization works for the subject
Seal & Signature of Bidder
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior to
the scheduled Time of Completion, failing
which the whole amount of advance
along with interest thereon shall be
recovered immediately from the
payments due to the Contractor.
The contractor may however, return / pay
to GETCO the unadjusted advance
amount at any stage during the execution
of the work along with the accrued
interest thereon till the time of return /
payment. Alternatively, the contractor
may also request GETCO for early
adjustment of the advance along with
accrued interest.
Note: ^^ This payment is an optional
payment. The Contractor has the option
of taking the interest bearing advance or
otherwise. The option for advance
payment is to be indicated by the bidder
in its bid as per the format attached
herewith as Annexure–iii and shall be
deemed to be part of the bidding
scheduled referred as SCHEDULE-21 to
be submitted by the bidder with Technical
Note: After release of various advances,
the rate of recovery of the advance shall
be re-adjusted.
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents as per
para B.1 and B.2 above is submitted by
the Contractor to the Employer within
months from the date of fulfillment of the
requisite activities, as per the L2 network.
In case the Contractor does not submit
the requisite documents including
applicable Bank Guarantee(s)/
Security(ies) within the aforesaid period,
the advance at B.1 & B.2 above shall not
Seal & Signature of Bidder
The Contractor, shall, within 7 days from
the date of receipt of Advance, furnish an
Advance Receipt Voucher to the
Employer, as prescribed under the GST
86.2.1 B3. Interest rate applicable on
advance payment to the Contractor shall
be at the rate equal to one year MCLR
rate [One-year Tenor rate p.a.] published
by State Bank of India prevailing as on
the date of drawl of advance. The said
interest rate shall remain fixed and shall
be applicable till the advance amount is
fully repaid. The interest will be charged
considering proportionate adjustment of
advance against progressive payment for
the work done as per 86.2.2 below. The
interest shall be calculated on the daily
progressive balances outstanding as on
the date of recovery/adjustment. It is the
Employer’s understanding that as per
extant provisions, GST is not payable on
Interest paid on the amount of Advance.
The Contractor may, however, advised to
check the position from their own
sources. If payable, the same shall be to
the Contractor’s account and Employer
shall not reimburse any GST on this
Further, the Contractor shall submit the
certificate of Tax Deduction at Source
(TDS) on interest within 3 months from
the end of the quarter in which
adjustment of advance has been made
for claiming refund from Employer. No
claim for refund will be entertained after
end of the aforesaid period of 3 months.
Further, while submitting the TDS
Certificate the details of Contract No,
Project, etc to which the TDS certificate
pertains, shall also be submitted tallying
the amount with the TDS Certificate.
In case, the Contractor opts not to take
interest bearing advance as above, it
would be mandatory for him to submit the
document listed at Sl. No. B1 (c) and,
B2(c) above within twenty-eight (28) days
of issuance of Letter / Notification of
Seal & Signature of Bidder
86.2.2 (i) (a) 70% payment if contractor
opts to take interest bearing mobilization
(i) 90% payment of amount claimed advance or (b) 80% payment instead of
covering various activities such as
70% payment if contractor opts not to
excavation, foundation, tower
erection, earthing, tack welding take interest bearing mobilization
stringing of conductor and OPGW advance or has opted to take interest
including insulator hoisting works bearing initial mobilization advance but
against R.A. bills duly certified by EIC the advance payment has become
within 30 days from the date of R.A. inadmissible, of amount claimed
bill. covering various activities such as
excavation, foundation, tower erection,
earthing, tack welding stringing of
conductor and OPGW including insulator
hoisting works against R.A. bills duly
certified by EIC within 30 days from the
date of R.A. bill.
86.2.2 (ii) 10% of erection value shall be
paid in three equal parts, each on
(ii) 10% of erection value shall be paid physical construction and erection of
against commissioning of 33% of line work including stringing of the
transmission line only after settlement Transmission Line, complete in all
of material account statement of items respects, including rectification of
supplied, used, erected and
defects/deficiencies on the line and
successful commissioning of
transmission line the same amount certificate from Engineer-in-charge and
will be release in final bill only and Chief Engineer (Projects).
payment will be made only after
passing of final bill. 86.2.3. Balance 10% of erection value
shall be paid against commissioning of
transmission line only after settlement of
material account statement of items
supplied, used, erected and successful
commissioning of transmission line. The
same amount will be released in final bill
only and payment will be made only after
passing of final bill.
Note: ROW is now proposed to be in the
(iii) Payment of ROW compensation scope of GETCO. Hence, this clause is
amount will be given as below only deleted.
after submission of necessary
supporting documents.
1) 40% amount after completion
of foundation work
2) 40% amount after completion
of erection work
3) 20% amount after completion
of stringing work in all respects
List of supporting documents:
1) Copy of form-7/12
Seal & Signature of Bidder
2) Parishisht ‘A’ and ‘B’ of GoG
3) Document of Online Jantri
Rate of respective Survey No.
If online Jantri Rates are not
available, then land cost shall
be certified by competent
Revenue Authority.
4) Copy of APMC rate based on
which compensation is paid
towards damage of tree-crop
5) ‘Panchnama’ duly certified by
concern Sarpanch / Talati /
Mamlatdar or concern
Revenue Authority
6) Documents for the
compensation cost paid to
Govt. Trasurer as per GoG
Tharav for the line passing
through Govt. Waste Land. /
(iv) Welfare Cess
Govt. Organization.
The modality of payment/
(iv) Welfare Cess
reimbursement of welfare cess will be
The modality of payment/
reimbursement of welfare cess will On receipt of A/T, the contractor /
be as under. bidder will get them registered under
Welfare Cess Act and submit the
On receipt of A/T, the contractor / documentary evidence to the concern
bidder will get them registered under office.
Welfare Cess Act and submit the Before release of payment of first
documentary evidence to the R.A.Bill, the contractor has to submit
concern office. the documentary evidence of
Before release of payment of first registration. Only thereafter, the bill will
R.A.Bill, the contractor has to submit be processed for payment.
the documentary evidence of Before release of payment of
registration. Only thereafter, the bill subsequent R.A.Bills, the contractor
will be processed for payment. has to submit the documentary
Before release of payment of evidence of payment of welfare cess of
subsequent R.A.Bills, the contractor previous R.A.Bill.
has to submit the documentary Before release of payment of Final Bill,
evidence of payment of welfare cess the contractor has to submit the
of previous R.A.Bill. documentary evidence of payment of
Before release of payment of Final welfare cess of previous R.A.Bill as
Bill, the contractor has to submit the well as the final bill.
documentary evidence of payment If the R.A.Bill happens to be first and
of welfare cess of previous R.A.Bill final bill, then before release of
as well as the final bill. payment, contractor has to submit
If the R.A.Bill happens to be first documentary evidence of registration
and final bill, then before release of under Welfare Cess Act and evidence
payment, contractor has to submit of payment of welfare cess.
documentary evidence of The welfare cess shall be reimbursed
registration under Welfare Cess Act to the contractor on submission of
and evidence of payment of welfare copy of documentary evidence of
cess. payment by observing due formalities.
The welfare cess shall be
reimbursed to the contractor on
submission of copy of documentary
Seal & Signature of Bidder
evidence of payment by observing
due formalities.
3. Part –I 2.0 Tender Fee 2.0 Tender Fee
Special The tender fee plus GST as The tender fee plus GST as
Conditions of applicable specified in notice applicable specified in notice
Contract/ inviting tender is payable by inviting tender is payable by
Clause 2.0 Demand Draft (DD) at Demand Draft (DD) at Vadodara
Vadodara drawn on any drawn on any Scheduled Bank in
Scheduled Bank in favour of favour of Gujarat Energy
Gujarat Energy Transmission Transmission Corporation Ltd.
Corporation Ltd. The same will The same will be furnished in
be furnished in Cover-1 of Bid Cover-1 of Bid along with EMD
along with EMD (Bid Security). (Bid Security).
Payment of Tender fee
accepted by RTGS / NEFT /
5. Part –I 5.0 QUALIFYING REQUIREMENT a) QUALIFYING
(SCC)/ REQUIREMENT
Special [A] Technical Requirement:
Contract/ [A] Technical Requirement:
1.0 Individual Bidders
Clause 5.0 1.0 Individual Bidders
and its sub- a) The bidder shall be Original
Equipment Manufacturer a) The bidder shall be Original
(OEM). The offered high Equipment Manufacturer (OEM).
ampacity conductor/HTLS The offered high ampacity
conductor of equivalent size conductor/HTLS conductor of
and weight that of ACSR Dog equivalent size and weight that of
conductor suitable for ACSR Dog conductor suitable for
existing 66kV Towers & H-
existing 66kV Towers & H-frame
frame has to be designed,
has to be designed, manufactured
manufactured and tested as
per relevant IS/IEC/ANSI and tested as per relevant
with latest amendments. IS/IEC/ANSI with latest
b) The bidder shall have b) The bidder shall have supplied at
supplied at least 100km of least 100 km of proposed high
high ampacity ampacity conductor/HTLS
conductor/HTLS conductor of equivalent size and
conductor of equivalent weight that of ACSR Dog
size and weight that of
conductor or above size during the
ACSR Dog conductor or
last five years.
above size during the last
c) The bidder shall have carried out
c) The bidder shall have
stringing of 50 Route km of 66kV
carried out stringing of
Route km of 66 kV & above
& above voltage class
voltage class transmission transmission line on towers/H-
line on towers in any single Frame in any single year during
the last five years. Sublet
Seal & Signature of Bidder
year during the last five experience also allowed subject to
years. provided Work order/PO copy of
original contract and Sub-
contractor, experience certificate
from main contractor and
statement of financial transaction
for the work order/PO are to be
submitted to ascertain experience
of line erection work of 66KV
and/or above class.
d) The proposed high ampacity
conductor/HTLS conductor of
d) The proposed high equivalent size and weight that of
ampacity conductor/HTLS ACSR Dog conductor of similar or
conductor of equivalent higher ratings must be in service
size and weight that of
for a minimum period of Two years
ACSR Dog conductor of
in India at the time of bid opening.
similar or higher ratings
must be in service for a
minimum period of one documents/Certificates of original
year at the time of bid customer to be submitted.
opening. Supporting
documents/Certificates of e) The bidder shall have in house
original customer to be design and testing facility.
f) The high ampacity
e) The bidder shall have in conductor/HTLS conductor of
house design and testing
equivalent size and weight that of
ACSR Dog conductor or above
f) The high ampacity
size proposed to be supplied shall
conductor/HTLS have valid type test certificates
conductor of equivalent from any NABL accredited
size and weight that of laboratory (National accreditation
ACSR Dog conductor or body of the country where
above size proposed to be laboratory is located) not older
supplied shall have valid than 10 years & must be valid till
type test certificates from the expiry of validity of offer
any NABL accredited considering on last date of
laboratory (National
submission of bid.
accreditation body of the
country where laboratory is
located) not older than
However, Successful bidder has
years & must be valid till to carry out all the type test as per
the expiry of validity of relevant standard for the offered
offer. HTLS conductor without affecting
delivery schedule.
However, Successful bidder has to
carry out all the type test as per g) For experience of stringing, certificate
relevant standard for the offered issued by the state transmission
Seal & Signature of Bidder
HTLS conductor without affecting utilities/central transmission
delivery schedule. utilities/joint Venture Company of
Central utility / Transmission
g) For experience of Licensee from Private Sector of
stringing, certificate issued Indian Origin only shall be
by the state transmission considered.
utilities/central
transmission utilities/joint h) The bidder shall have valid Electrical
Venture Company of Contract License and should have
Central utility / GST registration, PF Registration
Transmission Licensee Certificate.
from Private Sector of
Indian Origin only shall be i) In case of bidder meet the above
considered. requirement at 1.0 (d) but not
supplied from Indian Manufacturing
h) The bidder shall have valid Unit, then the offered HTLS
Electrical Contract License conductor of equivalent size and
and should have GST weight that of ACSR DOG conductor
registration, PF suitable for existing 66kV Towers & H
Registration Certificate. Frame shall be supplied from Indian
Manufacturing Unit only.
i) In case of bidder meet the
above requirement at 1.0 j) The bidder shall comply the public
(d) but not supplied from procurement guidelines of
Indian Manufacturing Unit, Government of India dated
then the offered HTLS 04.06.2020 and 23.07.2020.
conductor of equivalent
size and weight that of 2. In case the bidder does not meet
ACSR DOG conductor
technical experience specified at
suitable for existing 66kV
1.0 above at its own, the bidder
Towers & H Frame shall be
should associate with firm(s) to
supplied from Indian
Manufacturing Unit only. form a JV/Consortium and the
JV/Consortium shall collectively
j) The bidder shall comply meet the requirement as per
the public procurement above.
guidelines of Government
of India dated 04.06.2020 3. However, in respect of supply
and 23.07.2020. qualifications for supply
requirement as per 1(b) & 1(d) &
2.0 In case the bidder does not
1(f), the Indian Licensee /Licensor
meet technical experience
arrangement is permitted provided
specified at 1.0 above at its
own, the bidder should Licensor meeting the requirement
associate with firm(s) to form a of 1(b) ,1(d) & 1(f) stated herein
JV/Consortium and the above and shall also meet the
JV/Consortium shall following conditions;
collectively meet the
I. Manufacturer / Licensee
requirement as per 1.0 above.
shall have adequate design
3.0 However, in respect of supply infrastructure and
qualifications for supply manufacturing facility and
Seal & Signature of Bidder
requirement as per 1(b) & 1(d) capacity and procedures
& 1(f), the Indian Licensee / including quality control.
Licensor arrangement is
permitted provided Licensor II. A qualified Licensee of a
meeting the requirement of qualified manufacturer /
1(b) ,1(d) & 1(f) stated herein Licensor shall comply with all
above and shall also meet the the following requirements
following conditions; and furnish a Joint
I. Manufacturer / Licensee Undertaking by the Licensor
shall have adequate design along with the bidder in its bid
infrastructure and as per the Performa
manufacturing facility and enclosed at ANNEXURE-I.
capacity and procedures
a) Any design undertaken
including quality control.
by the Licensee shall be
II. A qualified Licensee of a approved by the
qualified manufacturer / Licensor.
Licensor shall comply with
all the following b) Manufacturing by the
requirements and furnish a Licensee shall be done
Joint Undertaking by the with the approval of the
Licensor along with the Licensor and Employer
bidder in its bid as per the under a quality
Performa enclosed at assurance programme
approved and monitored
a) Any design undertaken by the by the Licensor.
Licensee shall be approved by the
c) Licensee must furnish
back-up guarantee from
the Licensor for
b) Manufacturing by the Licensee individual and overall
shall be done with the approval of performance of all
the Licensor and Employer under materials supplied under
a quality assurance programme the contract.
approved and monitored by the
Licensor. d) Licensor must guarantee
sequential and timely
supply of materials and
submission of technical
c) Licensee must furnish back-up information and data as
guarantee from the Licensor for desired by the Employer
individual and overall performance so as to meet the overall
of all materials supplied under the construction schedule
e) The agreement between
Licensee and Licensor
d) Licensor must guarantee (copy to be submitted
sequential and timely supply of along with the bid) shall
materials and submission of be valid for a period of at
technical information and data as least five (5) years after
Seal & Signature of Bidder
desired by the Employer so as to the guarantee period of
meet the overall construction equipment and materials
schedule and under supply is over.
4. Bidders under Manufacturer
Authorization: -
e) The agreement between Licensee Bidders who are not OEMs
and Licensor (copy to be
are also eligible to quote
submitted along with the bid) shall
under manufacturer’s
be valid for a period of at least five
(5) years after the guarantee authorization from Indian
period of equipment and materials conductor manufacturer who
under supply is over. meets the qualifying
requirement as per 1.0 (a, b,
d, e, f, i & j) and the bidder
shall satisfy all other
4.0 Bidders under Manufacturer requirement as per clause
Authorization: - 1.0.
Bidders who are not OEMs are also
It is also mandatory for such
eligible to quote under manufacturer’s
bidders to provide the
authorization from Indian conductor
manufacturer who meets the
manufacturer’s authorization
qualifying requirement as per 1.0 as as per attached Annexure –
above and the bidder shall satisfy I.A
other requirement of 1.0.
Bidders quoting under
It is also mandatory for such bidders manufacture’s authorization
to provide the manufacturer’s
must have valid Electrical
authorization as per attached
Contractor License,
registered under GST Act and
Bidders quoting under manufacture’s should have PF Registration
authorization must have valid Certificate.
Electrical Contractor License,
registered under GST Act and should 5. New bidders with proposed
have PF Registration Certificate. manufacturing facilities in
New bidders with proposed
manufacturing facilities in India
shall be eligible to bid provided
5.0 New bidders with the Technical criteria as per [A]
proposed manufacturing 1.0 and financial criteria as per
facilities in India: [B] are to be fully met jointly
with their principal as under: -
New bidders with proposed (i) It should be established
manufacturing facilities in
through authenticated
India shall be eligible to bid
documents like land, Board of
provided the Technical criteria
as per [A] 1.0 and financial directors of the company,
company registration,
Seal & Signature of Bidder
criteria as per [B] are to be collaboration documents etc,
fully met jointly with their that Indian unit is at the
principal as under: - matured stage of construction
with required machinery. This
(i) It should be established
will be verified by GETCO as a
through authenticated
part of technical bid evaluation
documents like land,
Board of directors of the
prior to price bid opening. The
company, company decision of GETCO to qualify
registration, collaboration or not to qualify will be final and
documents etc., that binding.
Indian unit is at the (ii) 100% HTLS conductor
matured stage of offered by bidder shall be
construction with required supplied from Indian
machinery. This will be Manufacturing Unit only.
verified by GETCO as a (iii) The new bidder shall carry
part of technical bid
out type test report as per
evaluation prior to price
technical specification before
bid opening. The decision
of GETCO to qualify or
commencement of supply and
not to qualify will be final without affecting delivery
and binding. schedule.
(ii) 100% HTLS conductor [B] Financial Requirement
offered by bidder shall be
supplied from Indian 1. Bidder’s Minimum Average
Manufacturing Unit only Annual Turnover (MAAT) for best
three years out of last five
(iii) The new bidder shall carry
financial years shall not be less
out type test report as per
than the 50% of estimated
technical specification
before commencement of
amount of this tender.
supply and without
affecting delivery Minimum Average Annual
schedule. Turnover (MAAT) of the
consortium/ Joint Venture (JV)
[B] Financial Requirement company added together for best
three individual years out of last
1. Minimum Annual Turnover (MAT)
five financial years shall not be
for best three individual years
out of last five financial years
less than the 50% of the estimated
shall not be less than the cost. However Minimum Average
estimated cost. (For individual Annual Turnover (MAAT) for best
bidders) three individual years out of last
five financial years of the lead
2. Minimum Average Annual partner shall be at least 25% of the
Turnover (MAAT) of the
estimated cost & for each other
consortium/ Joint Venture (JV)
partners shall be at least 17% of
company added together for
best three individual years out of
the estimated cost.
last five financial years shall not
be less than the estimated cost.
Seal & Signature of Bidder
However Minimum Average Note: - For the purpose of arriving
Annual Turnover (MAAT) for at MAAT, revenue from operation
best three individual years out of shall be considered only excluding
last five financial years of the non-recurring income / other
lead partner shall be at least
income / interest income etc.
50% & for each other partners
shall be at least 50 % of the
estimated cost.
2. Last financial year liquid assets
should not be less than 20% of
3. If the bid is submitted for supply estimated amount of this tender.
portion under Licensee / Last financial year liquid asset of
Licenser agreement, then the the consortium/ Joint Venture (JV)
financial criteria under [B] 2 is to company added together should
be satisfied considering Licenser not be less than 20% of estimated
as one of the JV partner
amount of offered quantities as on
(Condition 3 (II) of [A] shall be
invitation of tender. However, last
financial year Liquid assets of the
4. Further, in case of the bid to be lead partner shall be 10% of
furnish as a JV/Consortium estimated Cost as on invitation of
partners then each tender and for each other partners
JV/Consortium partners has to shall be at least 7% of estimated
furnish 5% of the overall tender cost as on invitation of tender.
cost towards the B.G. in addition
to the 10% of the Bank Note: For the purpose of arriving at
Guarantee to be submitted by LA current assets less inventories
the lead partner (as security
shall be considered.
deposit). The terms, conditions
& validity of all such BG’s shall
3. Bidder’s/ all the partner of
consortium/joint venture net worth
5. Bidders quoting under for last financial years should be
manufacture’s authorization will positive.
have to furnish 5% of the overall
order value towards the B.G. in Note: -
addition to the 10% of the Bank Net worth means paid up share
guarantee (as security deposit).
capital, Share Application Money
The terms, conditions & validity
pending allotment* and reserves#
of all such BG’s shall be the
less accumulated losses and
deferred expenditure to the extent
6. New Bidders with proposed not written off.
manufacturing facilities in India # Reserves to be considered for
will have to furnish 5% of the the purpose of net worth shall be
overall order value towards the all reserves created out of the
B.G. in addition to the 10% of the profits and securities premium
Bank guarantee (as security account but shall not include
deposit). The terms, conditions reserves created out of revaluation
& validity of all such BG’s shall
of assets, write back of
depreciation and amalgamation
Seal & Signature of Bidder
* Share application money pending
allotment will be considered only in
respect of share to be allotted.
4. The bidder / all the partner of
consortium/joint venture should
not have been referred to NCLT
under insolvency & bankruptcy
code (IRP has been appointed or
liquidation proceedings have been
initiated under IBC).
Bidder to evidence the meeting of
financial criteria shall submit:
(i) CA Certificate with valid UDIN
Number failing which certificate shall
not be considered for the purpose of
(ii) Audited balance sheet and profit
& loss account along with the
schedules referred therein and the
auditor’s Report for the preceding
five financial years, in line with one
of the following
(a) In case last financial year’s
closing date was within 6 months
prior to bid due date and audited
Balance Sheet and Profit & Loss
account of last financial year are not
available, bidder has the option to
submit the financial details of five
previous years immediately prior to
the last financial year. For example,
in case bid due date is up to 30th
September and financial details of
immediate preceding financial years
(year ending 31st March of same
year) are not available, the financial
details of the five previous years
immediately prior to the last financial
year may be submitted.
(b) Otherwise it is compulsory to
submit the financial details of
immediate preceding five financial
Seal & Signature of Bidder
Details as per qualifying requirement
to be uploaded along-with offer.
CA certificate to be attached
for MAAT, Liquid Assets and
Net-worth. (This is must).
Under taking in respect of
reference to NCLT under
Insolvency & Bankruptcy
Code. The undertaking is to be
furnish by the bidder in its bid
as per the format attached
The owner may assess the capacity &
herewith as Annexure–iv and
shall be deemed to be part of
capability of the bidders, to
the bidding scheduled referred
successfully execute the scope of
as Annexure–4 to be
work covered under the work with in
uploaded by the bidder with
stipulated completion period. This QR bid.
assessment shall inter-alia include. Supply/Order executed details
for offered items with name of
1) Document verification purchaser, date and location to
2) Bidders work/manufacturing be mentioned.
Performance certificate for
facilities visit
satisfactory operation/working
3) Manufacturing capacity, for period as per qualifying
details of work executed, requirement attached with
specification. (This is must for
works in hand, anticipated in getting the offer qualified)
future & the balance capacity
available for the present scope
4) Details of testing facilities,
manpower and financial
5) Details of quality system in
6) Past experience &
7) Customer feed back
8) Banker’s feed back
Details as per qualifying requirement
to be submitted along-with offer, in a
separate cover.
CA certificate to be attached for
MAT. (This is must)
Supply/Order executed details for
offered items with name of
purchaser, date and location to be
Seal & Signature of Bidder
Performance certificate for
satisfactory operation/working for
period as per qualifying
requirement attached with
specification. (This is must for
getting the offer qualified)
4. Part –I 5.0 Additional Documents: 5.0 Additional Documents:
Special Apart from various documents to be Apart from various documents to be
Conditions of furnished along with the Bid as furnished along with the Bid as required
Contract/ required in the GCC and ECC, the in the GCC and ECC, the following
Clause 5.0 following documents/details are to be documents/details are to be furnished by
and its sub- furnished by the Bidder: the Bidder:
clauses 1. GST Registration No. and 1. GST Registration No. and date
date 2. Registration. No. under Shops &
2. Registration. No. under Establishment Act/ issuing
Shops & Establishment Act/ authority
issuing authority 3. Details of Partners/Directors of
3. Details of Partners/Directors the Firm/Company.
of the Firm/Company.
4. Experience Record and 4. Experience Record and details of
details of orders pending / orders pending / executed for
executed for various utilities various utilities
5. Last five years Audited 5. Last five years Audited Accounts
Accounts 6. Detail of Manufacturing/
6. Detail of Fabrication facilities along with list
Manufacturing/Fabrication of Testing Equipment calibrated
facilities along with list of up to date. The detail for the same
Testing Equipment may be submitted.
calibrated up to date. The 7. Factory Registration / License
detail for the same may be details
8. P.F registration
7. Factory Registration /
License details
8. Solvency certificate from
Bank (20 % of Bid value).
9. P.F registration
5. Part –I 10.0 PENALTY FOR DELAY: 10.0 LIQUIDATED DAMAGES (LD)
(SCC)/ FOR DELAY:
Conditions of 10.1 The tenderer should note that the 10.1 The tenderer should note that the
Contract/ completion time allowed for carrying completion time allowed for carrying out
Clause 10.0 out the work should be strictly the work should be strictly observed. Any
and its sub- observed. Any delay that may take
delay that may take place in achieving
clauses place in supply and erection beyond
Contractual cut-off date stated as per Completion of the works beyond
stipulated delivery period shall be Contractual Time of Completion in the
subject to the penalty at the rate of ½ Contract shall be subject to Liquidated
% of the contract value per week plus Damages (LD), and not by way of
GST as applicable on delayed work penalty, at the rate of ½ % of the Contract
(supply and erection work) with a Price plus GST as applicable, per week
ceiling of 10% of the total contract
or part thereof of the delay subject to a
value plus GST as applicable.
ceiling of 10% (ten percent) of the
Contract Price plus GST as applicable.
Seal & Signature of Bidder
10.2 In event of failure of the 10.2 In cases where the Completion of
Contractor to pay the amount of the works/ along with supplies extend
Penalty as demanded, the Owner
beyond the contractual completion
shall be entitled to deduct the
amount of Penalty for delay from period, without prejudice to any other
the amounts payable to the right that it may have under the Contract
Contractors under any bills raised or in law, the Owner shall be entitled to
under this contract or any other deduct the amount of LD from the
amount payable under any other amounts payable to the Contractors
contract with the GUVNL and its under any bills raised under this
Subsidiary companies i.e. GETCO,
Contract or any other amount payable
GUVNL, GSECL, MGVCL, DGVCL,
PGVCL, UGCVL. It is permissible for under any other contract with the
the Owner to adjust the amount of GUVNL and its Subsidiary companies
Penalty of delay against any Bank i.e. GETCO, GUVNL, GSECL, MGVCL,
Guarantee furnished by the DGVCL, PGVCL, UGCVL. It is
Contractor under this contract or any permissible for the Owner to adjust the
other contract with GUVNL and/or its amount of LD against any Bank
subsidiary companies.
Guarantee furnished by the Contractor
under this contract or any other contract
with GUVNL and/or its subsidiary
10.3 Tenderer shall have to supply
all materials to match with the erection 10.3 Notwithstanding the provision of
activities. Clause 10.2, if so requested by the
Contractor, amount from the RA bills,
pending settlement of Liquidated
Damages (LD), shall not be withheld/
retained by the Owner, if adequate
retention payment [over and above
security deposit/ Contract Performance
Guarantee (CPG)] remains to be
released as per Contract. In case, it is not
so, it shall be examined by the Owner
whether BGs/other securities (excluding
CPG/Security Deposit) furnished by the
Contractor are available with GETCO,
which have partly or fully served their
purpose, and can therefore be utilized by
GETCO to recover LD, if finally levied. If
available, it will be further checked
whether the contractor is willing to furnish
a suitable undertaking authorizing
GETCO to retain those BGs/security (for
such value which along with retention
payments remaining with GETCO is
considered to be sufficient to take care of
maximum leviable LD) to be kept valid till
6 months beyond the anticipated
completion of the works/ supplies under
the Contract. If the Contractor requests
and gives the undertaking as above and
validity of BG is suitably extended
Seal & Signature of Bidder
wherever required, amount from RA bills,
pending settlement of LD, shall not be
withheld/ retained on account of LD.
10.4 Tenderer shall have to supply all
materials to match with the erection
Seal & Signature of Bidder
BANK GUARANTEE FORM FOR ADVANCE PAYMENT
(For the purpose of verification/confirmation of this Bank Guarantee by the GETCO, the Bank
shall indicate 2 official email ids of the authorized signatories from Issuing Branch and also of
the designated higher office (Corporate Office, Zonal Office etc) in the covering letter of the Bank
forwarding the Bank Guarantee.)
Bank Guarantee No. …………………… Date...................
…………..[Name of Contract]…………………….
To: [Name and address of the Employer/ Owner]
Dear Ladies and/or Gentlemen,
We refer to the Contract ("the Contract") vide Letter of Award issued on ............ (insert date of the letter
of award)….by you (the Employer/ Owner) to M/s ................. (Name of Contractor) ..................,
signed on ..............(insert date of the Contract)…..... between you and M/s ................. (Name of
Contractor) ..................,
having its Principal place of business at ………....(Address of Contractor) ............................... and
Registered Office at ………....(Registered address of Contractor)
…….................….. (Indicate brief scope of work) ............................... for the complete execution of the
…… (insert name of Package along with name of the Project)……..
Whereas, in accordance with the terms of the said Contract, the Employer has agreed to pay or cause
to be paid to the Contractor an interest bearing Advance Payment against furnishing of an irrevocable
bank guarantee for an amount of ………………………..(Amount in figures and words) ……………which
is equal to [{110% (one hundred ten percent) of the amount of Advance} Plus {amount of GST
reimbursable on Advance as per the Proforma invoice, if applicable}].
By this letter we, the undersigned, ………(insert name & address of the issuing bank) ………, a Bank
(which expression shall include its successors, administrators, executors and assigns) organized under
the laws of .................................... and having its Registered/Head Office at …..…….(insert address of
registered office of the bank)……..... do hereby irrevocably guarantee repayment of ………….(Amount
of the bank guarantee in figures and words)…………… upon the first demand of the Employer without
cavil or argument in the event that the Contractor fails to commence or fulfill its obligations under the
terms of the said Contract for reasons whatsoever.
Provided always that the Bank's obligation shall be limited to the amount of this Bank guarantee or an
amount equal to the outstanding balance of the Advance Payment and the accrued interest on the
Advance Payment, taking into account such amounts, which have been repaid by the Contractor from
time to time in accordance with the terms of payment of the said Contract, as certified by you.
This Guarantee shall remain in full force from the date upon which the said Advance Payment is received
by the Contractor up to ninety (90) days beyond the date on which the entire Advance Payment along
with the accrued interest if any due thereon has been fully adjusted in terms of the Contract i.e., up to
ninety (90) days beyond the date of Completion of the Facilities under the Contract. This Guarantee may
be extended from time to time, as may be desired by M/s. ……………………….. on whose behalf this
Guarantee has been issued.
Seal & Signature of Bidder
Any claims to be made under this Guarantee must be received by the Bank during its period of validity,
i.e. upto ninety (90) days beyond the date of Completion of the Facilities by the Employer i.e. upto and
inclusive of ……………. (dd/mm/yy).
Notwithstanding anything contained herein:
1. Our liability under this Bank Guarantee shall not exceed _________ (value in
2. This Bank Guarantee shall be valid upto ________(validity date)__________.
3. We are liable to pay the guaranteed amount or any part thereof under this Bank Guarantee
only & only if we receive a written claim or demand on or before ________ (validity date)
For and on behalf of the Bank
[Signature of the authorised signatory(ies)]
Designation_______________________
Contact Number(s): Tel.______________Mobile______________
Common Seal of the Bank______________________
Contact Number(s): Tel.______________Mobile______________
1. For the purpose of executing the Bank Guarantee, the non-judicial stamp papers of appropriate
value shall be purchased in the name of Bank who issues the ‘Bank Guarantee’.
2. The Bank Guarantee shall be signed on all the pages by the Bank Authorities indicating their
POA nos. and should invariably be witnessed.
3. The Bank Guarantee should be in accordance with the proforma as provided. However, in
case the issuing bank insists for additional paragraph regarding applicability of ICC
publication No: 758, the following may be added at the end of the proforma of the Bank
Guarantee [i.e., end paragraph of the Bank Guarantee preceding the signature(s) of the
issuing authority(ies) of the Bank Guarantee]:
“This Guarantee is subject to Uniform Rules for Demand Guarantee, ICC publication No.
758 except that article 15(a) is hereby excluded.”
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contracts/E-514/Uprating/66kV/S&E
Sub: Supply, installation, testing & commissioning of conversion of (1) 66kV Halvad -
Soladi line (2) 66kV Dhrangadhra - Hirapur line (3) 66kV Dhrangadhra - Bavli line (4) 66kV
Surendranagar- Wadhwan - Rajsitapur line (5) 66kV Limbdi - Sayla line (6) 66kV Limbdi -
Chornia line (7) 66KV Chornia - Khandiya line with ACSR DOG conductor into equivalent
HTLS conductor (equivalent weight of ACSR DOG conductor with higher ampacity) of
Surendranagar Circle (Except Gap Type conductor).
Option for Initial Advance (either Interest Bearing Initial Advance of No Initial Advance or No Initial
Addl. Chief Engineer (Procurement & Contracts)
Gujarat Energy Transmission Co. Ltd.,
Corporate office,
I. We have read the provision in the Bidding Documents regarding furnishing the option for
advance payment. Accordingly, as per clause GCC 86.1.1 (For Supply) and GCC 86.2.1 (b)
(For Erection) provided in Amendment-I of the Bidding Documents, we hereby confirm to opt
Interest Bearing Initial Advance:
Supply Portion: (Ref GCC 86.1.1) *
Erection Portion: (Ref GCC 86.2.1 (b)) *
* ‘Yes’ or ‘No’ to be filled up by the Bidder. ‘Yes” shall mean that Bidder has opted for the Interest
Bearing Advance and ‘No’ shall mean that Bidder has not opted for the Interest Bearing Advance.
If nothing is mentioned, it shall mean that Bidder has not opted for the Interest Bearing Advance.
(Name of Authorized Signatory of Bidder)
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contracts/E-514/Uprating/66kV/S&E
Sub: Supply, installation, testing & commissioning of conversion of (1) 66kV Halvad -
Soladi line (2) 66kV Dhrangadhra - Hirapur line (3) 66kV Dhrangadhra - Bavli line (4) 66kV
Surendranagar- Wadhwan - Rajsitapur line (5) 66kV Limbdi - Sayla line (6) 66kV Limbdi -
Chornia line (7) 66KV Chornia - Khandiya line with ACSR DOG conductor into equivalent
HTLS conductor (equivalent weight of ACSR DOG conductor with higher ampacity) of
Surendranagar Circle (Except Gap Type conductor).
In connection with above subject, I / we confirm that our firm is not declared in NCLT under
Insolvency & Bankruptcy Code. Further, I / we also agree that, if any found NCLT under
Insolvency & Bankruptcy Code, the offer shall be out rightly rejected without assigning any
reason thereof.
Signature of Authorized
Representative of Company/Agency
Name of bidder Company
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
8. EMD BG Format.pdf
2. Amendment -I Part-I Tender Specifications_SNR E-514.pdf
3. L2 Schedule E-514.pdf
5. PB Part-III Surendranagar Circle E-514.pdf
6. R1_66KV_HTLS_specs.pdf
6.1 Addendum for core.pdf
7. Annexure I and IA.pdf
8. EMD BG Format.pdf
9. Form for Networth and Annual turnover.pdf
10. ONLINE SCHEDULE_TECH - E-514.pdf
11. Online Schedule-QR-E-514.pdf
12. Public Procurement Circular of GOI.pdf
13. Tower Schedule of 66 kv Halvad- Soldi line.pdf
14. Tower Schedule of 66 kv Dhrangadhra-Hirapur line.pdf
15. Tower Schedule of 66 kv - Dhrangadhra-Bavali line.pdf
16. Tower Schedule of 66KV SNR WDWN RJST line.pdf
17. SD cum PBG Format.pdf
18. Tower Schedule of 66KV Limbdi Sayla line.pdf
19. Tower Schedule of 66KV Limbdi Chornia line.pdf
20. Tower Schedule of 66KV Chornia Khandiya line.pdf
21. Form of LD undertaking 1A.pdf
22. Form of LD undertaking 1B.pdf
4. Tender Notice E-514_SNR.pdf
1. Part-I Tender Spe. - Uprating of 66kV lines_SNR E-514.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .